Get complete information related to latest Dc Servo Motor Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Dc Servo Motor Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Dc Servo Motor Tenders.
Tender For design, manufacturing, supply, installation, testing & commissioning of complete hydraulic system for motor bush removal and fitment fixture for vande bharat train traction motor at rcnk-jhs as per scope of work. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of armature for wood cutting machine , carbon brush for wooden cutting machine , armature with bearing for hand grinder machine , carbon brush for hand grinding machine , vice for drilling sensitive piller , copper condenser for window ac , blower for window ac , bobbin case for sewing machine , needle organ for sewing machine , belt for sewing machine , electric motor for outer unit for split ac hp one by eight rpm one hundred thirty , hydraulic seal for hydraulic jack trolley
Tender For supply of seal tripple lip , mounting rubber , disc , nut , seal oil , lock , rod end , rear bearing cap oil , bolt , cutting gauge nut bolt , clutch disc assembly , starter motor assembly , dozer seal kit , 10 amp fuse , cap fuel tank , hose top left hand to right hand hydraulic , hose with clamp adopter 27mm , radiator hose pipe , steering oil filter
Tender For supply of spares for parker and hugland make hydraulic power pack of stacker cum reclaimer of chp at katpp rvun, jhalawar. - spares for parker/hugland make hydraulic power pack , parker's gear pump -27cc/ rec., 275 bar , shaft coupling for motor & pump hub (l-190) , oil level indicator , oil filter cartridge , pressure gauge (0-280 bar) glycerin filled bcpm , poppet valve for rail clamp power pack , oil filter cartridge , shaft coupling of hugland power pack , bladder for accumulator 2.5 i ltr type (pre charged 9 bar) , bladder for accumulator 1 i ltr type (pre charged 15 bar) , level gauge type- sna-254-b-n , pressure gauge (0-60 bar) type- 2750-63-0-060-21 , pressure gauge (0-400 bar) type- 2750-63-0-0400-21 , butterfly valve ab16s-50-he
Tender For supply of equipment items - dcmotor:type: dc shunt motor (dismantling model) power: minimum 0.5 hp voltage: 220 v dc speed: 1500 rpm poles: 4 pole construction: laminated stator salient poles accessible armature features: cut section / open type suitable for dismantling and reassembly, hydraulic cylinder: bore diameter: 50 mm stroke length: 250 mm working pressure: 160 bar cylinder tube: honed steel piston rod: hard chrome plated seals: standard industrial seals end caps: steel supply: mounted on training base suitable for dismantling and inspection, hydraulic operated directional control valves (dcv):type: manual spool type dc valve configuration: 4/2 way size: ng06 (cetop 3) rated pressure: 210 bar flow capacity: 20 40 lpm body: hardened steel / cast steel spool: ground and hardened ports: clearly marked (p, a, b, t) supply: mounted on training plate suitable for dismantling and study, bearing with shaft assembly :type: dismantling and assembly teaching unit shaft diameter: 30 mm shaft material: en8 steel bearings: deep groove ball bearing (6205 / 6206) housing: cast iron locking arrangement: circlips lock nuts end covers mounting: bench-mounted / frame-mounted unit, coupling unit using driving and driven shafts using plummer block bearing unit :the plummer block housing material: cast iron (grade fg 200 or equivalent). type: sng or snl series (split-type housing). sealing: felt seals or v-ring seals (to demonstrate lubrication retention). lubrication: provided with a grease nipple at the top center for manual lubrication practice. the bearing type: self-aligning ball bearing (1200 series) or spherical roller bearing (22200 series). bore diameter: standard 25mm or 30 mm. shafting and coupling shaft material: ground carbon steel (en8 or en9) for high surface finish. coupling type: flexible coupling: to demonstrate the bearings ability to handle slight misalignment. rigid flange coupling: to demonstrate traditional direct connection. driving/driven setup: one shaft connected to a small electric motor (driving) and the other to a brake drum or load (driven).
Tender For supply of impulse generator ipg001 for efka make dcservomotor model no. dc 1550/ab 321 , efka make electronic motor model no. dc 1550/ab 321 complete with drive panel suitable for minerva m
Tender For corrigendum : supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bot