Web Analytics Made Easy - StatCounter

Defoiling Machine Scrap Tenders

Get complete information related to latest Defoiling Machine Scrap Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Defoiling Machine Scrap Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Defoiling Machine Scrap Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :40314448 Due date: 22 Aug, 202522 Aug, 2025 NA
Tender For corrigendum : supply of ht motors spares for emd-1,wtps,gsecl. - skf make induction heater model no. tih 100m / 230v for bearing fitting work., hydraulic jack with pump & accesories capacity: 100 mt., hydraulic jack with pump & accesories capacity: 50 mt., greasing pipe for ht motors - r1 type hydraulic hose pipe ( rubber hose with single inner wire braiding), araldite 180 gram/tube, red insulating varnish-class f epoxy insulation & protection coating., dr. back make backtol red in 1 lit. tin varnish, digital multimeter 4.1/2 digit (true rms), digital clamp on meter lcd display with backlight, 3-3/4 digit., digital megger (insulation tester) dual voltage 500/1000 v 0 to 2000 megaohms resolution of 1 m? weght: 500 gm approx., analog multi range insulation tester.hand driven type,voltage range-250v/500v/1000v., brass connectors for pstb of ht motor, plastic dori (sutari) for binding of plastic ,0.5 thick &2mm width., insulating cable gland for pstb of ht motor, grease gun, fevicol sr 998 (200 ml/tin), self fusing rubber tape black , class b , 31 kv die electric strength , size 2.5 cm x 10 mtr., pvc tap roll, insulating box for pstb for ht motor, ht pvc insulation tape size 0.18 mm x25 mm x 65 mtr length, 6.6 kv busbar /cable couductor protection heat shrinkable sleeve dia .before shrink:50 mmdia. after shrink :20 mm, heat shrinkable sleeve,size:45mm/18 mm( for 240/300 sq.mm )for 11 kv, 6.6 kv busbar /cable couductor protection heat shrinkable sleeve dia .before shrink: 75 mm dia. after shrink : 28 mm for 11 kv ht cable, z 801 fast steel epoxy stick (1 stick - 114 grm), impact wrench power/battery operated, cordless screw driver power/battery operated, w963 play safe high voltage tape (50 mm x 0.76 mm x 9.1 mtr) roll, w963 play safe high voltage tape (25 mm x 0.76 mm x 9.1 mtr) roll, becktol gray varnish in 1 ltr tin dr.back make, electical saftey equipment tester taparia product no:814 voltage range:110v to 230v

State Government

CTN :41355801 Due date: 12 Aug, 202512 Aug, 2025 NA
Tender For repairing of all gear box and its accessories at wazirabad barrage. - dismantling of gearbox by removing both end couplings and extracting the complete shaft assembly from the barrage gates. this includes removal of thrust and steel blocks using skilled labour and specialized lifting equipment. the gearbox top cover (top half) shall be removed, followed by detachment of the bottom half from the main gearbox body. all internal components parts gear, changer gear assembly, bearing, limit shift assembly and shaft shall be carefully removed in sequence, ensuring proper identification and documentation of their orientation and order for accurate reassembly., dismantling of drumbox assembly by removing both end couplings and extracting the complete shaft,bear and gear assembly from the drum box .. all internal components parts gear, changer gear assembly, bearing, limit shift assembly and shaft shall be carefully removed in sequence, ensuring proper identification and documentation of their orientation and order for accurate reassembly., thorough cleaning of all components to remove debris, contaminants, and residual lubricants using appropriate cleaning agents and methods. detailed inspection of each component to assess condition, identify wear, damage, or corrosion, and document findings for further repair or replacement as required., repair of limit switch assembly of gear box including the complete overhauling /oiling and greasing including replacement of parts as per sample ., replacement of normally open (no) switch and contactor with a relay, along with the complete installation of electrical components for the gear box in the hoisting mechanism of the barrage system, replacement of brake pad as per sample along with complete fitting and integration in the gearbox assembly, replacement of brake coil as per sample along with complete fitting and integration in the gearbox assembly, replacement of bearing no 6315/c4 djb approved makes, replacement of bearing no 6312m/c3 djb approved makes, replacement bearing no 6308 2rs1 djb approved makes, replacement bearing no 6310 2rs1 djb approved makes, complete assembly of the gearbox, including packing, greasing, and installation of both end shafts with cast iron (c.i.) couplings and bolts. ensure proper alignment and secure fastening to maintain efficient power transmission and operational reliability, complete overhauling and lubrication of all moving and critical components of the drum box assembly of the gearbox, using appropriate tools such as grease guns and nipples. the work shall be carried out by skilled labor as per site requirements. ensure proper lubrication with the specified grade and viscosity of grease to maintain optimal performance and prevent wear and tear of mechanical parts including internal parts of painting, the work involves achieving precise/making alignment of the shaft connecting the drum box and gear box in the hoisting mechanism of the barrage. proper alignment is critical to prevent deviation from the guide grooves during operation particularly during lifting and to ensure long-term stability and accuracy of sluice gate movement.the job includes dismantling the existing shaft (which transmits motion between the drum box and gear box), carrying out realignment, and reinstalling the shaft with high precision. to restore the system to optimal operating condition, the work shall also involve the replacement of associated hardware components as required such as bearings, couplings, keys, and fasteners.this intervention is essential for the reliable and efficient functioning of the sluice gate lifting system and to prevent operational issues during gate actuation., after cleaning and overhauling the gear and shaft of the gearbox, refit and them in their original positions with making alignment with all movement parts of gear box and ensure that they are functioning properly., conduct load testing of 3under sluice and 3weir side gates and weir side gates during
 Loading, Please wait...

Connect us via What's Up