Get complete information related to latest Degrease Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Degrease Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Degrease Tenders.
Tender For supply of inhibited mineral insulating transformer oil conforming to is:335 (type ii with inhibitors) or latest, with the followin g additional parameters as per rdso letter no:ti/psi/insoil/policy/19 dt. 26.07.19, or latest. (1) parmater: lowest cold start energising te mperature(lcset)- requirement - 0 degree c. (2) flash point- minimum -requirement ;140 degree c. (3)presence of oxidation inhibitor (dbp c-2, 6diteriary-butyl-para-cresol)- requirement: range( 0.25 to 0.30) percent. (4) oxidation stability- (a)total acidity(neutralization value aft er oxidation- requirement: max, 0.20 mg koh/g, (b)total sludge after oxidation- requirement: max, 0.05 percent. [ warranty period: 30 m onths after the date of delivery ]
Tender For procurement of 167mva, 400/220/33kv, 1-?ict (11 nos.) along with new uninhibited highgrade mineral insulating oil for augmentationscheme under amravati, nagpur & pune zones ofmsetcl
Tender For supply of inhibited mineral insulating transformer oil type ii as per is: 335:2018 and railways requireme nt as per rdso letter no. ti/psi/insoil/policy/19 dt.26.07.2019. [ warranty period: 30 months after the dat e of delivery ]
Tender For supply of inhibited mineral insulating oil for 3 phase loco transformer as per clw spec .no. - clw/es/3/0172 alt-d. [ warranty period: 30 months after the date of delivery ]
Tender For supply of inhibited mineral insulating oil for main transformer for electric loco co nforming to is: 335-2018 and railways requirement as per rdso's letter no. ti/psi/insoil/p olicy/19 dated 26.07.2019. [ warranty period: 30 months after the date of delivery ]
Tender For supply of inhibited mineral insulating transformer oil as per is: 335/2018 and railways requirement as per rdso letter no. ti/psi/insoil/policy/19 dated 26/07/2019