Get complete information related to latest Diagnostic Terminal Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Diagnostic Terminal Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Diagnostic Terminal Tenders.
Tender For igbt based 3-phase drive propulsion system with composite converter for wap-7 as per rd so specification no. rdso/2008/el/spec/0071, rev.5 (propulsion equipment except traction converter) an d clw specification no. clw/es/3/ig/0/0518 alt. c (traction converter having hlc part of rating 2x600kva for wap-7) for complete three phase wap-7 locomotive along with physical medium i.e. esd/emd/ofg for multi functional vehicle bus (mvb) to inter-connect all the bus stations as per iec-61375, terminal bracket s, bus bar links and copper braids required for connection between main transformer and traction convert ers, auxiliary converters, interfacing connectors, cables and cable looms with connectors required for co nnection from vcu1/2 to sb1/2 panel, traction motor speed sensors, complete assembled and wired panel c fitted with driver display unit(s) and interface for both cab, as per following specifications: (i)rdso/2008 /el/spec/0071,rev.5 for igbt based 3-phase drive propulsion equipment except traction converter (ii) cl w/es/3/igbt/0518 alt. c for composite converter (iii) clw/es/3/0528 alt-a for tm speed sensor for igbt t raction converter (iv) clw/es/3/0138 alt-a for copper braid (v) clw/es/3/0458 alt.e for control cables (v i) clw/es/3/0459 alt.c for screened cables (vii) clw/es/3/0124 alt.'o' for set of connectors. (viii) clw/e s/3/0240 alt-b for panel c (without diagnosticterminal). (ix) rdso modification sheet no. rdso/2012 /ms/0413 rev 1 (x) rdso modification sheet no. rdso/2020/el/ms/0482, rev'1' (xi) rdso modificati on sheet no. rdso/2017/el/ms/0457 rev-0 (xii) all the relevant rdso modification sheets applicable for the sub-components of igbt based 3-phase drive propulsion equipment should be implemented. in add ition to above description, the propulsion system with composite converter should also co mply requirement mentioned in "schedule of requirement" (sor), copy attached with tender documents. warranty period: 72 months from the date of supply. [ warranty period: 72 months after th e date of delivery ]
Tender For supply of side buffer casing (casting) for coaches to item 1 of rdso sk.94043, alt. 5 a nd to icf str no. icf/md/spec.-252, rev.0 of aug.`13 with amend. no. 4 of june 2022 [ warra nty period: 36 months after the date of delivery ]
Tender For supply of shifting of afnet site ii from station hq to nfs package 1 building - 48 core single mode unarmourmed optical fiber cable , 24 core single mode unarmoured ofc , cemented pipe dia 150mm for routing of ofc under ground , ofc splice enclosure , gi pipe for road crossing dia 150mm , construction of manhole cemented dimension 04 ft x 04 ft x 04 ft with iron cover , 48 core fdf liu , 24 core fdf liu , 144 core fdf liu , route markers , catvi utp cable , catvi stp cable , rj45 24 port patch panel , rj45 keystone jack , io box , casing capping 1 inch x 6 ft , casing capping 2inchx 6 ft , casing capping 4inchx 2inch x 6 ft , laying and installtion of utp stp cable in casing caping , velcro for routingtieing ofc patch cord , high density ofc cable raceway made of high density pvc, colour yellow , inter facility buffer cable 48 core ofc patch cord with lc connector at both end 5mtr , inter facility buffer cable 24 core ofc patch cord with lc connector at both end 5mtr , 05 mtr ofc patch cord duplex for inter connectivity , 10 mtr ofc patch cord duplex for inter connectivity , 02 mtr lc to lc ofc patch cord duplex , 01 mtr lc to lc ofc patch cord duplex , 02 mtr utp patch cord , 01 mtr utp patch cord , armored ug cable of 200 pair , dp box of 200 pair for ug cable termination with krone module including installation , digging and laying of ofc and jfc at depth of 1.65 mtr and 2 ft width as per bsnl iaf standards to lay multiple ofcs in two separate concrete pipes , splicing of 24 and 48 core ofc at existing site 2 equipment room and nfs pkg site , provision of iron rack mounting stand as per rack dimensions for positioning of equipment and server rack dimension , metallic ofc cable raceway passing inside raised flooring from ofc entry point to hd fdf of dimension 60 ft long x 1 ft wide x 4 inch height including installation , procurement and installation of dc electric power cable 50sq mm , procurement and installation of dc electric distribution box , procurement and installation of 10 sq mm 4 core electric power cable , procurement and installation of 25 sq mm 4 core flexible electric copper cable , procurement and installation of distribution box 150 amps , procurement and installation of eyelet lugs cable 50 sq , procurement and installation of eyelet lugs cable 10 sq , procurement and installation of eyelet lugs cable 25 sq , removal of 42 u rack from existing site and installation with grouting at new site , mccb 150 amps , 3 phase mcb 63 amps , single phase two pole mcb 32 amps , single phase two pole mcb 63 amps , 3 phase spd type1 , cable tray with cover for electric cables including installation