Web Analytics Made Easy - StatCounter

Diesel Locomotive Spares Tenders

Get complete information related to latest Diesel Locomotive Spares Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Diesel Locomotive Spares Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Diesel Locomotive Spares Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :40040576 Due date: 17 May, 202517 May, 2025 NA
Tender For gasket manifold to water inlet tube to emd pt no :40040025 & blw pt no :161 70660 for hhp diesel locomotives .drawing attached . note: 1) material to be procured from past pro ven supplier to indian railways for this item. 2) test certificate (tc) & guarantee certificate (gc) are to be provided with supply. ]

Central Government/Public Sector

CTN :40026859 Due date: 07 May, 202507 May, 2025 NA
Tender For supply of set of slide bar brackets consists of 3 items without foundation holes for x-class locomotives conforming to the following drawings. ite m no (1) - slide bar bracket lh slm index no. x/9/16a/m (item no 1), sr drg no. 1488/mg qty-1 no/set. item no (2) - slide bar bracket rh slm index no. x/9/ 16a/m (item no 2), sr drg no. 1488/mg qty-1 no/set. item no (3) - bearing cover slm index no. x/9/16a/m (item no 3), drg no. goc/x/sk-09-16030 qty-2 no s/set note: 1. item no (1) to (3) consists of one set. 2. for equivalent material specification refer goc/x/spec-x-032 3. all threads should be in bsw. 4.one in tegral test piece should be provided for each component, it should be parted in presence of railway authority for material testing before machining [ warrant y period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :40027000 Due date: 07 May, 202507 May, 2025 NA
Tender For supply of set of bearing spring and buckle for x class locomotives as per drawing index no. x/15/1a/m in assembled condition. for al ternative material specification refer goc/x/spec-032 issue-02. one set consist of 8 nos of drawing index no.x/15/1a/m item 1,2,4,5,6,7 in a ssembled condition and 2 nos of drawing index no.x/15/1a/m item 1,3,4,5,6 in assembled condition. note: two nos of old condemned or servicea ble springs as sample on a returnable basis may be spared to the firm on demand against security deposit/bank guarantee/term deposit receipt by the firm eq ual to the 20% of value of 1 set spring after po release. [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :40028273 Due date: 15 May, 202515 May, 2025 NA
Tender For supply of air compressor (water-cooled) for hhp locomotives this is a safety item as per d rg.no. 40017843 alt a specn: specification for cleaning surface/ rust preventive, i- mark and p acking conditions misc: 458. ]

Central Government/Public Sector

CTN :40010421 Due date: 09 May, 202509 May, 2025 NA
Tender For jhansi division -bsz-gtm- ctr (p) - 36.51 tkm & jhansi division -gtm-bzm ctr (p) - 32.23 tkm-ns item :- a) running track site:- replacement of old sleepers and rails (ctr) by dismantling existing track of all types of sleepers by making 13m loose rail panel (or any suitable length panel) with existing sleepers & sh rail (for removing existing track) with wider base sleepers/revised wider base sleepers at density of 1660 sleepers per km assembled with loose rail panel (or any suitable rail length panel of sh rail) in pqrs depot and placing over ballast properly during traffic block after removing panels of old sleeper and sh rail of 13 m loose rail panel (or any suitable length panel) wth the use of contractor's pqrs machine by providing auxilary track with gauge of 3400mm (either with the use of existing rail from existing track or with new rail unloaded by contractor from eur in block as instructed by sse/p-way, (if required) over metal/ wooden sleepers, to be provided by railway, 500 nos./rail km on both rails at the interval of 2m) and providing fish plates for joining loose sh rail over wider base sleeper for continuity of track and maintaining track parameters as per para 522 of irpwm 2020 to keep the track fit for 30kmph. sh rail over new wider base sleepers/revised wider base sleepers to be replaced with newlearlier existing rail on running track (with replacement of rutbber pad, liner & greased erc and greasing of liner contract area. grease to be used should be of 'o' graphite grease as per s code 408). as soon as loose rail length of track reaches 500m/750nm (as per decision of railway site engineer ie. sseje/ p-way), loading of track panel (sh rail over old normal sleeper and tied with erc) of approximately 13 m length over railway wagons and unloading of track panels of the length of 13 m (or any suitable length) and wider base sleepers/revised wider base sleepers will be done during traffic block. trr with the rail of the length of 250 m to 500m (preferably 20rail panel) will have to be done as soon as track of loose rail exceeds 500m length. further the contractor wil follow instructions of sse/p-way to relax speed of track upto maximum speed of section as per schedule laid down in irpwm 2020 para 708 for machine tamping with all machine packing related works such as recoupment of crib ballast, shoulder ballast, boxing and dressing. the whole process wil continue ill completion of work. auxilary track (at) will have to be removed with advancement of ctr work as per direction of railway (sse/jeip-way). b) pqrs depot: track panel with sh rail of 13 m or any suitable length over wider base sleepers/revised wider base sleepers/revised wider base sleepers will be made with necessary fittings in pqrs depot. loading of these panels over railway wagons and unloading of released track panels (released from running track) consisting of all types of rails & sleepers from railway wagon at pqrs depot using contractor's own portal crane including dismantling and stacking each component of track properly at designated locations. (note: this item of complete track renewal with wider base sleeper is a composite item and all activities as required will have to be done by the contractor with his/her own pqrs machine & other machines, tools and plants including all other resources as per requirement of the work (in pqrs depot and during traffic block in running tack). ralway will provide wagons and locomotives free of cost for loading/unloading and transportation tofrom pors depot/work site (running track) for loose rail panels with normal old sleepers and with wider base sleepers/revised wider base sleepers. nothing extra will be paid except the rates as mentioned against the item. raiway will also provide metal/wooden sleepers required for at, free of cost. various activities which are involved in ctr work are elaborated in "sequence of activities provided with tender schedule." (unit- per track km.).

Central Government/Public Sector

CTN :39975302 Due date: 24 Apr, 202524 Apr, 2025 NA
Tender For supply of set of tools for tool box of hhp locomotives, set consisting of 7 items as mentioned in office note, each item required 01 no.

Central Government/Public Sector

CTN :39990337 Due date: 05 May, 202505 May, 2025 NA
Tender For supply of set of copper cable lugs size 70 sq mm f [set of copper cable lugs size 70 sq mm for three phase locomotives as per clw specification no. clw/es/3/0130 alt-n or latest. 01 set consists of 03 items, 72 nos. as per annexure attached. (item reserved for clw approved sources only).]

CTN :38872286 Due date: 29 Apr, 202529 Apr, 2025 NA
Tender For corrigendum : group bm - design, manufacture, supply,installation, commissioning ,training and maintenance of desktop simul ator console for 3-phase electric locomotives as per frs rdso/2024/el/rm/0203 (rev.2), july'2024 of rdso (bidder should be solely responsible for its maintenance along with operation performance. item 1: cost of desktop simulators for 3-phase electri c locomotives [ warranty period: 24 months after the date of delivery ]

Central Government / Public Sector

CTN :39949979 Due date: 01 May, 202501 May, 2025 NA
Tender For supply of operating rod assembly for h type tight lock cbc of electric locomotives as per drg no. c/els/lgd/ex.ftg/3/28 alt-2 sheet ref.no.1 to 4. set consists of 04 items. (1) operating rod long assembly. sheet no. 2 of 5 drg. no.c/els/lgd/ex.ftg/3/28.alt.2. qty- 02 nos. (2) operating rod short assembly. sheet no. 3 of 5 drg. no.c/els/lgd/ex.ftg/3/28.alt.3 qty- 02 nos. (3) bracket assembly inner. sheet no.4 of 5 drg.no.c/els/lgd/ex.ftg/3/28.alt.1 qty- 01 set.(all the items as per the quantity specified in the drawing to be supplied) (4) bracket assembly outer. sheet no.5 of 5 drg.no.c/els/lgd/ex.ftg/3/28.alt.1 qty- 01 set.(all the items as per the quantity specified in the drawing to be supplied). note: the firms with past performance of the tendered/same item subject to submission of proof of documents such as pos/r note are only eligible

Central Government / Public Sector

CTN :39903347 Due date: 02 May, 202502 May, 2025 NA
Tender For evaporator blower wheels (lhs & rhs) with housing, for cab ac of wag7 locomotives. note: 1) item sho uld be suitable for 2t capacity roof mounted cab ac of make daulatram / fedders lylord / sidwal fitted on conventional electric locos to rdso specification no: rdso/2007/el/spec/0055 rev.2 of nov 2007/revised on 07.10.2014. 2) one sa mple to be got approved before effecting bulk supply. ]
 Loading, Please wait...

Connect us via What's Up