Tender For corrigendum : supply of overhauling kit for wdg4/wdp4 locomotive engine governor (consisting of 5 7 items as per enclosed list). [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : supply of rubber kit for 1.1/4" cut- off angle cock with vent as per clw drg. no 0/2/65/386 alt.6 ,ref- 12 &13 (02 items 03 nos.)consisting (i) o ring (ref-12)01 no.(ii)sealing washer (ref.-13)-02 nos ( this is for shelf life items and should be procured with staggered delivery period. supplier to mention / print date of manufacturing on the item & to be supplied within 90 days of manufacture date.) as per drg.no. clwdrg no 0/2/65/386 as per specn. clw drg no 0/2/65/386 alt .6 or letest ref - 12&13 ( 02 items 03 ).[ warranty period: 30 months after the date of delivery ]
Tender For supply, delivery of different heat shrinkable jointing kit requirement for the work by laying of 3cx185 sq mm htug cable for drawl of dedicated 11 kv ug feeder to diamond harbour womens university diamond harbour under diamond harbour division