Tender For corrigendum : purchase of 200 kva-500 kva l.t. distributionbox (metal made)with acb as per specification, terms & conditions of mgvcl tender for annual requirement of 2025-26.
Tender For for the work of supply of lt fuse unit box for protection of 25 to 100 kva distribution transformer installed in electricity distribution section, gola under electricity distribution division, gola.
Tender For for the work of supply of lt fuse unit box for protection of 25 to 100 kva distribution transformer installed in electricity distribution section mohammadi under electricity distribution division gola.
Tender For for the work of supply of lt fuse unit box for protection of 25 to 100 kva distribution transformer installed in electricity distribution section palia under electricity distribution division gola.
Tender For corrigendum : different type of repairing work of lt distributionbox against operation and maintenance scheme 2024-25 in the area of kanpur road under jurisdiction of e.e., eudd., kanpur road, amausi zone, lucknow
Tender For for the work of supply and complete installation lt fuse set installed in smc box for 25 kva to 100 kva distribution transformers. business plan scheme 2025-26 in the jurisdiction of se, eudc-i, ghaziabad
Tender For corrigendum : the work of supply and erection of lt fuse set housed in smc box on pole at suitable hieght for distribution transformers of 25 to 100 kva to the protect them from damage in the area of edd, bijnor /kiratpur/chandpur/ noorpur under bp 2025-26.
Tender For corrigendum : the work of supply and erection of lt fuse set housed in smc box on pole at suitable height for distribution transformers of 10 kva to 100 kva to the protect them from damage in the area of edd, chandausi, sambhal and babralal under bp 2025-26.
Tender For supply of accessories for lt abc of various sizes (item wise evaluation will be done as per the schedule of quantity in part-i (page-4) - anchor clamp/ dead end clamp, anchor bracket and flexible metalic rope) for 70 sq.mm lt ab cables (insulated messenger 50 sqmm), anchor clamp/ dead end clamp, anchor bracket and flexible metalic rope) for 50 sq.mm lt ab cables (insulated messenger 35 sqmm), anchor clamp/ dead end clamp, anchor bracket and flexible metalic rope) for 35 sq.mm lt ab cables (insulated messenger 25 sqmm), (suspension clamp, suspension bracket and movable connecting link) for 70 sqmm lt ab cable (insulated messenger 50 sqmm) , (suspension clamp, suspension bracket and movable connecting link) for 50 sqmm lt ab cable (insulated messenger 35 sqmm) , (suspension clamp, suspension bracket and movable connecting link) for 35 sqmm lt ab cable (insulated messenger 25 sqmm), pre- insulated midspan joints for 16 sq.mm , pre- insulated midspan joints for 35 sq.mm , pre- insulated midspan joints for 50 sq.mm , pre- insulated midspan joints for 70 sq.mm , insulation piercing connector (ipc) - main 16 sq.mm to 95 sq.mm; tap: 16 sq.mm to 95 sq.mm, insulation piercing connector (ipc) - main 16 sq.mm to 95 sq.mm; tap: 4 sq.mm to 35 sq.mm , insulation piercing connector (ipc) - main 16 sq.mm to 95 sq.mm; tap: 1.5 sq.mm to 16 sq.mm , satellite connector - main: 16 sq.mm to 95 sq.mm; tap:2.5 sq.mm to 35 sq.mm (4 way), cable end cap for abc 70 sq.mm, cable end cap for abc 16 sq.mm, cable end cap for abc 35 sq.mm, cable end cap for abc 50 sq.mm, pre insulated bi-metallic lug for 16 sq.mm, pre insulated bi-metallic lug for 50 sq.mm, pre insulated bi-metallic lug for 70 sq.mm, post mounting lt distributionbox for service connection with clamping devices