Get complete information related to latest Diversion Channel Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Diversion Channel Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Diversion Channel Tenders.
Tender For remodeling/rehabilitation for laying of rcc pipeline at outlet rd 7250-l bharukhera minor( only for construction of watercourse crossing under the channel from rd 7000 and 8500 at bharukhera minor). (re-tender)
Tender For supply of ptz 2 mp camera 100 meter hi focus , fiber media converter with 4 rj 45 port , led 55 inch television , nvr 32 channel , hard disk 4 tb , utp cat 6 cable , light interface unit 24 port , online 5 kva ups , outdoor junction box , pigtails , tiffin box for ofc , 17u rack with fan and stand , ms pone 30 feet hight and 4 inch dia complete with camera holding installation of pole with construction of rcc foundation , electric wire 1.5mm 2 core with laying of complete site , ofc cable 12 core armed with laying of complete site
Tender For corrigendum : emergent repair of rcc pipe 1 m internal dia np3 laid for drainage of the surrounding flooded water during heavy rain at rd 62250 right side ubdc hydel channel near village kataruchak
Tender For shifting of the rcc pole with the ht/lt lines existing in the culvert of pcc drain in drainage channel from gandhiji school to balaji nagar channel at kombakkam revenue village commune, puducherry.
Tender For construction of rcc protection wall to waste weir channel coming from gowdana kere to ammana kere in sidlagatta taluk, chikkaballapura district.
Tender For execution of contract for supply works and other works in panagudi section - normal ground- excavation of pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles, normal ground- erection of 7.32m, 7.5m, 8m, 8.23m poles, rocky ground (medium)- excavation of pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles, rocky ground- erection of 7.32m, 7.5m, 8m, 8.23m poles, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles, hard rock requiring blasting and chisseling- erection of 7.32m, 7.5m, 8m, 8.23m poles, normal ground- excavation of pole pits (1.25m * 0.6m*1.83m) for 9m & 9.14m poles, normal ground- erection of 9m & 9.14m poles, rocky ground- excavation of pole pits (1.25m * 0.6m*1.83m) for 9m & 9.14m poles, rocky ground- erection of 9m & 9.14m poles, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for 9m & 9.14m poles, hard rock requiring blasting and chisseling- erection of 9m & 9.14m poles, normal ground- excavation of pole pits (1.25m * 0.6m*2.19m) for above 9.14m poles & 36 length rs joists, normal ground- erection of above 9.14m poles & 36 length rs joists, rocky ground- excavation of pole pits (1.25m * 0.6m*2.19m) for above 9.14m poles & 36 length rs joists, rocky ground- erection of above 9.14m poles & 36 length rs joists, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for above 9.14m poles & 36 length rs joists, hard rock requiring blasting and chisseling- erection of above 9.14m poles & 36 length rs joists, normal ground- excavation of pole pits (1.25m * 0.6m*2.19m) for 42 length rs joists, normal ground- erection of 42 length rs joists, rocky ground- excavation of pole pits (1.25m * 0.6m*2.19m) for 42 length rs joists, rocky ground- erection of 42 length rs joists, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for 42 length rs joists, hard rock requiring blasting and chisseling- erection of 42 length rs joists, transporting of poles from road side to pole pit upto 2km - 7.32m, 7.5m, 8m, 8.23m rcc pole, transporting of poles from road side to pole pit upto 2km- 9m, 9.14m rcc/psc pole, transporting of poles from road side to pole pit upto 2km - rsj 36 pole, transporting of poles from road side to pole pit - rsj 42 and above, loading and unloading of poles - 7.32m, 7.5m, 8m, 8.23m rcc pole, loading and unloading of poles - 9m, 9.14m rcc/psc pole, loading and unloading of poles - rs joists, tubular & rail pole (above 9.14m), concreting of poles as per board standards (2*2*5). the materialsuch as cement, sand, jelly, etc., have to be supplied by the contractor (cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing transporting of sant,jally,from box and water curing for 14 days etc,.complete), coping of pole (0.6m*0.6m*0.35m), concreting of stay (o.3m * 0.3m * 1.5m) including materials, coil earthing per pole & pole earthing, normal ground- excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for stay set), normal ground- erection of stay set, rocky ground (medium)- excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for stay set), rocky ground- erection of stay set, hard rock requires blasting & chisseling- excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for stay set), hard rock requires blasting & chisseling- erection of stay set, loading and unloading charges of oil drums (with oil), loading and unloading charges of oil drums (without oil), loading and unloading charges of conductor drum, cable drum, loading and unloading charges of line materials, loading and unloading charges of metering set, 11kv lines-(pin point) fixing of v & channel cross arm 5.5 including transporting of materials from road side to site
Tender For execution of contract for supply works and other works in ittamozhy section - normal ground- excavation of pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles, normal ground- erection of 7.32m, 7.5m, 8m, 8.23m poles, rocky ground (medium)- excavation of pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles, rocky ground- erection of 7.32m, 7.5m, 8m, 8.23m poles, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles, hard rock requiring blasting and chisseling- erection of 7.32m, 7.5m, 8m, 8.23m poles, normal ground- excavation of pole pits (1.25m * 0.6m*1.83m) for 9m & 9.14m poles, normal ground- erection of 9m & 9.14m poles, rocky ground- excavation of pole pits (1.25m * 0.6m*1.83m) for 9m & 9.14m poles, rocky ground- erection of 9m & 9.14m poles, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for 9m & 9.14m poles, hard rock requiring blasting and chisseling- erection of 9m & 9.14m poles, normal ground- excavation of pole pits (1.25m * 0.6m*2.19m) for above 9.14m poles & 36 length rs joists, normal ground- erection of above 9.14m poles & 36 length rs joists, rocky ground- excavation of pole pits (1.25m * 0.6m*2.19m) for above 9.14m poles & 36 length rs joists, rocky ground- erection of above 9.14m poles & 36 length rs joists, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for above 9.14m poles & 36 length rs joists, hard rock requiring blasting and chisseling- erection of above 9.14m poles & 36 length rs joists, normal ground- excavation of pole pits (1.25m * 0.6m*2.19m) for 42 length rs joists, normal ground- erection of 42 length rs joists, rocky ground- excavation of pole pits (1.25m * 0.6m*2.19m) for 42 length rs joists, rocky ground- erection of 42 length rs joists, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for 42 length rs joists, hard rock requiring blasting and chisseling- erection of 42 length rs joists, transporting of poles from road side to pole pit upto 2km - 7.32m, 7.5m, 8m, 8.23m rcc pole, transporting of poles from road side to pole pit upto 2km- 9m, 9.14m rcc/psc pole, transporting of poles from road side to pole pit upto 2km - rsj 36 pole, transporting of poles from road side to pole pit - rsj 42 and above, loading and unloading of poles - 7.32m, 7.5m, 8m, 8.23m rcc pole, loading and unloading of poles - 9m, 9.14m rcc/psc pole, loading and unloading of poles - rs joists, tubular & rail pole (above 9.14m), concreting of poles as per board standards (2*2*5). the materialsuch as cement, sand, jelly, etc., have to be supplied by the contractor (cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing transporting of sant,jally,from box and water curing for 14 days etc,.complete), coping of pole (0.6m*0.6m*0.35m), concreting of stay (o.3m * 0.3m * 1.5m) including materials, coil earthing per pole & pole earthing, normal ground- excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for stay set), normal ground- erection of stay set, rocky ground (medium)- excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for stay set), rocky ground- erection of stay set, hard rock requires blasting & chisseling- excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for stay set), hard rock requires blasting & chisseling- erection of stay set, loading and unloading charges of oil drums (with oil), loading and unloading charges of oil drums (without oil), loading and unloading charges of conductor drum, cable drum, loading and unloading charges of line materials, loading and unloading charges of metering set, 11kv lines-(pin point) fixing of v & channel cross arm 5.5 including transporting of materials from road side to sit
Tender For protection to toe of aproch road in connection with newly constructed rcc bridge over navigation channel at ch-2660 of lbmc under damodar canal division.
Tender For piling at different weak spots of doodhganga diversionchannel including providing and laying of ec bags at different spots from rd 600 downwards