Get complete information related to latest Documentation Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Documentation Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Documentation Tenders.
Tender For corrigendum : supply of anemometer as per annexure - i of of tender technical specifictaion , cots navigation radar - as per annexure - ii of tender technical specifictaion , automatic identification system ais - as per annexure - iii of tender technical specifictaion , cots global positioning system gps - as per annexure - iv of tender technical specifictaion , drawings and documentation as per tender technical specifictaion , on board spares as per tender technical specifictaion , service engineer for supervision of installation, commissioning, hats and sats as per tender technical specifictaion including lodging and boarding .
Tender For supply of rocos, 400a 415v,on board spares for rocos,documentation for rocos,service charges for rocos,irs class charges for rocos,extended warranty for rocos
Tender For supply of gel imaging and documentation system with 02 years of warranty and ups as per technical specification,stain free acrylamide kit 7.5 percent,stain free acrylamide kit 10 percent,stain free acrylamide kit 12 percent,thermal paper roll,1st year cmc after expiry of warrany peiod,2nd year cmc after expiry of warrany peiod,3rd year cmc after expiry of warrany peiod,4th year cmc after expiry of warrany peiod,5th year cmc after expiry of warrany peiod,6th year cmc after expiry of warrany peiod,7th year cmc after expiry of warrany peiod,8th year cmc after expiry of warrany peiod
Tender For supply of rectifier cum battery chargers with batteries 60a 1.5kw 24vdc as per tsp,on board spare as per tsp,installation material,documentation and drawing as per tsp,services of engineers hat s,rectifier cum battery chargers with batteries 60a 1.5kw 24vdc as per tsp,on board spare as per tsp,installation material,documentation and drawing as per tsp,services of engineers hat s,rectifier cum battery chargers with batteries 60a 1.5kw 24vdc as per tsp,on board spare as per tsp,installation material,documentation and drawing as per tsp,services of engineers hat s,rectifier cum battery chargers with batteries 60a 1.5kw 24vdc as per tsp,on board spare as per tsp,installation material,documentation and drawing as per tsp,services of engineers hat s,rectifier cum battery chargers with batteries 60a 1.5kw 24vdc as per tsp,on board spare as per tsp,installation material,documentation and drawing as per tsp,services of engineers hat s,rectifier cum battery chargers with batteries 60a 1.5kw 24vdc as per tsp,on board spare as per
Tender For supply of total supply cost,total installation cost,trials and commissioning,training,documentation,cost of obs spares,preservation,extended warranty
Tender For corrigendum : supply of blast proof charging bay vc11190 and 91 - blast proof charging bay and accessories as per scope of tender with break up - 02 sets per ship , documentation as per para 2.3,4 and 11 of tts - with break up , consumables and test kits required towards installation, commissioning, test and rials. with break up , class inspection at oem premises. , service engineers charges towards during installation, commissioning and trials. , onboard spares with tool box with break up , training
Tender For corrigendum : providing of custom bid for services - custom bid for services - valce salvaging job; f work covers salvaging of defective sc valves and restoring them for reuse as per standard procedures and instructions of the officer-in-charge. the contractor shall carry out the following activities in a safe, systematic, and accountable manner: 1. salvaging operations salvaging of defective sc valves shall be carried out as per laid-down procedures using the valve test bench and/or any other equipment or method advised by the officer-incharge. the contractor shall collect defective sc valves from the store after obtaining necessary approvals. 2. cleaning & preparation clean all defective sc valves in the ultrasonic valve cleaning machine and/or other approved valve cleaning systems. ensure all valves are thoroughly cleaned to remove dirt, oil, or contaminants before testing. segregate cleaned valves properly for further inspection and testing. 3. segregation & testing segregate valves based on their source (e.g. hot repair, defective, pin leak, scrapable cylinders, etc.). perform low pressure and high pressure testing of the valves as per laid-down procedures and test parameters. identify valves that are fit for reuse and those that are defective/rejects. 4. salvaging & assembly replace the old o -ring washer of all good salvaged valves with new o -ring washers (to be provided by hpcl). fit safety caps and back covers on the salvaged valves to protect them from dust and contamination. ensure salvaged valves are clean, properly assembled, and ready for storage. 5. storage & documentation arrange salvaged valves type-wise in a countable and organized manner and deposit them in the stores. ensure proper handling to avoid damage or mixing of valve categories. maintain shift-wise records of: o number of valves received, o number of valves cleaned, tested and salvaged, o number of valves rejected. 6. manpower & productivity contractor shall provide minimum one manpower per shift. a minimum target of 400 sc valves shall be salvaged per manpower per shift. inventory of defective valves pending salvaging shall not exceed one day s generation. 7. materials & consumables hpcl shall provide o -ring washers, safety caps, back covers, and other reusable fittings. kerosene and other cleaning consumables shall be supplied by the vendor. contractor shall ensure availability of all tools and accessories required for smooth execution. 8. certification & payment the shift officer shall certify the salvaged quantity at the end of each shift. payment shall be made strictly on actual quantity salvaged and accepted by hpcl. any deviation or failure to meet daily targets may attract penalty as per tender terms. 9. safety & compliance all activities shall be carried out in compliance with hpcl safety norms and oisd guidelines. personnel shall wear required ppe (gloves, goggles, shoes, helmet) during operations. all salvaging and testing activities shall be conducted under the supervision of hpcl personnel.
Tender For carryout aerial drone videography and documentation of u/s and d/s side of tilpara barrage of different stretches of mayurakshi river at tilpara under mayurakshi head quarters division at different time and location including hire charges machine & equipments, manpower with all logistic support and editing and submission of raw & edited soft copy of drone videography work