Tender For nctps stage-iii – 1x800 mw – operation circle – chemical division/ senior chemist-i –time bound works in various operation locations –instrument and equipment operationcondensate polishing unit & regeneration system, boiler steam and water analysis system, sea water condenser cooling water system, fuels such as hsd, hfo, lubrication oils, receipt coal and bunker coal both indigenous and imported(ichs & echs), coal mills, fly ash and bottom ash, turbine main oil system and generator cooling system –handling of chemicals from storage to dosing tanks, preparation of chemicals as per field requirement -handling of all respective register, report preparation and communication. - monitoring of all local parameters as per the instruction of chemist - for a period of one year (365 days) from the date of taking over of site
Tender For tnpgcl – nctps stage-iii – 1x800 mw – operation circle - chemical division / senior chemist -ii – time bound works in various operation locations – ro& dm water production system operation, sampling, conditioning ,chemical analysis and equipment operation , sea water intake, pretreatment of sea water, dual media filtration, ultrafiltration, sea water reverse osmosis system, brackish water reverse osmosis system, demineralized water treatment plant, cst, electrochlorination system works and environmental monitoring – collection of samples, preparation, reduction and conditioning of samples, operation of manual valves in field sites, confirming valve sequence in auto mode and plc operations, handling of chemicals from storage to dosing tanks, preparation of chemicals as per field requirement, handling of all respective register, report preparation and communication- monitoring of all local parameters as per the instruction of chemist for all the above works for a period of one year (365 days) from the date of taking over of site
Tender For corrigendum : supply of chemical dosing system for 2x800 mw adani power raipur tpp , chemical dosing system for 2x800 mw adani raigarh tpp phase-ii , chemical dosing system for 2x800 mw mteuppl mirzapur phase-i