Web Analytics Made Easy - StatCounter

Drum Handling Cask Tenders

Get complete information related to latest Drum Handling Cask Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Drum Handling Cask Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Drum Handling Cask Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :40975208 Due date: 15 Jul, 202515 Jul, 2025 NA
Tender For supply of arrangement of generator flooring (refer techno comm. bid sheet for detail item description) , lifting beam for generator flooring (refer techno comm. bid sheet for detail item description)

Central Government/Public Sector

CTN :40865335 Due date: 07 Jul, 202507 Jul, 2025 NA
Tender For complete machining of stator lifting beam centre assy- 1 nos as per t-pqr-hgg02/2025 and drg 12515126712 rev-00 and lifting beam arm assy- 8 nos as per t-pqr-hgg02/2025 and drg 12515126713 rev-00.total f/m wt 20926 kg/set, repair and maintenance wt 21864.8 kg/set.scrap

Central Government And Public Sector

CTN :40873660 Due date: 22 Jul, 202522 Jul, 2025 NA
Tender For manufacture, supply and installation of cross beam girder (size of beam 11 meter long, cross section 500 mm height & 180 mm width approx.) of 3ton eot crane along with suitable long transverse ge ared motors 2nos as per rwf drawing no. 703402210640. note: 1. only crane manufacturers or their auth orized representatives with relevant expertise shall be eligible to participate in the tender. 2. the drawing attached is only for the general guidance. the supplier shall visit the rwf and take necessary data before c ommencing the work. 3. all raw materials necessary for the fabrication, including channels, plates, and stru ctural steel, shall be supplied by the supplier. 4. the supplier shall also be responsible for the transportatio n of all components such as the fabricated cross beam, hoist, channels, plates, etc., to the rail wheel facto ry (rwf), including both to and fro movements, and shall bear all associated transportation charges. 5. the supplier shall dismantling the existing electrical connections and the removal of the hoist assembly. proper support beams must be provided between the end carriages, and the cross beam (girder) must be carefully supported before the removal of mounting bolts. the cross beam should then be lowered cautiously to prev ent damage to surrounding equipment and shifted to the designated location. the temporary support beam for the end carriages shall be removed thereafter. 6. the supplier shall remove the existing long travel gea rbox along with its motor, and install a new gearbox and motor fitted with suitable gears and couplings. th e hoist is to be reinstalled in its original position, and all electrical connections must be restored accordingl y. once the mechanical and electrical installations are complete, the cross beam and associated structures shall be painted in yellow and black colors, adhering to standard safety norms for cranes. 7. rwf will provi de to the supplier with air, electricity, water, and welding/oxy-cutting consumables free of cost. however, t he supplier is required to supply all raw materials for fabrication and arrange all necessary tools, lifting tac kles, and handling equipment for the execution of the work. the supplier is also obligated to provide appro priate personal protective equipment (ppe) such as helmets, gloves, safety harnesses, and other safety gea r to all personnel working at the site. 8. after completion of all work, the supplier must conduct a load test of the crane and submit a valid load test certificate. throughout the execution, the supplier will be solely re sponsible for the safety of all workers engaged in the activity, and the entire work shall be carried out in co mpliance with applicable safety standards and rwf's guidelines. 9. the motor with gearbox for the lt mov ement shall have a minimum power of 1 hp, and its output speed shall be suitable to achieve an lt movem ent speed of at least 20 meters per minute. [ warranty period: 18 months after the date of delivery ]

Central Government/Public Sector

CTN :40828056 Due date: 04 Jul, 202504 Jul, 2025 NA
Tender For arrangement of generator flooring-1 , lifting beam assembly-2

State Government

CTN :40227801 Due date: 08 Jul, 202508 Jul, 2025 49.58 Lacs
Tender For corrigendum : various routine/preventive and breakdown maintenance work on as and when require basis at chp-gtps - replacement of hammer rings for stage ii crusher , replacement of hammer rings for stage i crusher , replacement of screen plate / breaker plate/kick off plate of stage i and ii crushers , replacement of rotor of stage i crusher with disassembling of removed rotor and assembling of new/repaired rotor , replacement of drive end side bearing / pedestal of crusher rotor or complete gear coupling set of crusher or repositioning of dislocated rotor of crusher , replacement of non drive end side bearing/pedestal of crusher rotor or complete alignment of crusher motor with crusher rotor , replacement of broken hammer rings of stage i and ii crushers (stage i crusher up to 12 nos.of hammer rings and stage ii crusher up to 06 nos. of hammer rings at a time) , replacement of rail of rail table of wagon tipplers 1/2/3/4 (in one side full length) , replacement of clamping rubber pads of clamp for wagon of wagon tipplers , replacement of whole resting pads for wagon of side beam of wagon tipplers , replacement of spill plate roller of wagon tipplers , repairing/preparation/ fitting and replacement of hooks/rods/turn buckle, chain, sling rope ,spring assembly etc. of vibrating trays and crusher house trays , spillage control at various locations , miscellaneous cutting/welding work require at various locations , replacement of gearbox in conveyor no. 2a/b,11a/b,12a/b,13,14/15,16a/b,17a/b ,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of gearbox in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement of slow speed coupling set (two halves) of drive pulley , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.2a/b,11a/b,12a/b,13,14/15,16a/b,17 a/b,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement/removing/refitting of various size and type of fluid coupling , replacement or removing & refitting of any internal/bearing/input/ output oil seal of various size and type of gear box , overhauling of dismantles old/used gearbox in all respect with fitment of input and output coupling. , replacement of drive pulley , replacement of drive end side bearing of drive pulley or repositioning of dislocated drive pulley , replacement of non drive end side bearing/any side pedestal of conveyor drive/non drive pulley , alignment of motor/ gearbox/drive pulley including decouple/couple of coupling , nut bolt and drive system checking with replacement of broken nut bolt in all 04 wagon tipplers no.1/2/3/4 as per scope , lifting and releasing of gravity take up of any conveyor belt for locking and de locking of belts for other than belt replacement work , loosening and tightening of horizontal type screw take assembly of any conveyor belts for other than belt replacement work , work of dismantling and re erection of new/repaired apron pan from existing apron feeder of wagon tippler , repairing of upper/lower structure/cone plates of damaged/bend apron pan , replacement of carrying roller of apron feeder , replacement of worn out/ damaged ti roller and garland rollers. , replacement of worn out/ damaged impact rollers , replacement of worn out/ damaged return rollers , replacement of various worn out/ damaged ti roller stands , replacement of various worn out/ damaged impact roller stands , replacements of various worn out/ damaged return roller stands , replacement of various worn out skirt rubbers [10 m each] and skirt rubber with angle , preparation and replacement of guide rollers with bracket in place of worn out/ damaged gu
 Loading, Please wait...

Connect us via What's Up