Get complete information related to latest Duct Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Duct Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Duct Repair Tenders.
Tender For corrigendum : supply of 1.5 tr invertor ductable ac , itc of 1.5 tr ductable ac , supply fixing copper piping for 1.5 tr , supply fixing ms stand , sf upvc drain pipe 25 mm dia , sf upvc drain pipe 40 mm dia , supply laying of 3x1.5 sqmm cable , supply laying of 3x2.5 sqmm cable , sf dp sheet steel enclosure with dp mcb , sf 5 amps to 32 amps 240 volts spmcb , gi ducting of thickness 0.63 mm sheet , gi ducting of thickness 0.80 mm sheet , providing fixing aluminium grill , providing fixing canvass connection
Tender For corrigendum : supply of 1.5 tr invertor ductable ac , itc of 1.5 tr ductable ac , supply fixing copper piping for 1.5 tr , supply fixing ms stand , sf upvc drain pipe 25 mm dia , sf upvc drain pipe 40 mm dia , supply laying of 3x1.5 sqmm cable , supply laying of 3x2.5 sqmm cable , sf dp sheet steel enclosure with dp mcb , sf 5 amps to 32 amps 240 volts spmcb , gi ducting of thickness 0.63 mm sheet , gi ducting of thickness 0.80 mm sheet , providing fixing aluminium grill , providing fixing canvass connection
Tender For supply, installation, testing and commissioning of 3x7tr microprocessor based hpac for phase ix.2 project mini dc at arera telephone exchange bhopal (sh s/f of damper, canvas connection including ducting and miscellaneous work)
Tender For corrigendum : execution of all st works including supply of materials under schedules c d e including trenching ducting cable laying jointing installation earthing testing and commissioning for jharkhand and odisha
Tender For corrigendum : supply of furniture and kitchen equipment 03 nos emrs d d - dual desk class 6 8 , dual desk class 9 12 , principal table , vice principal table , office table , teachers table , meeting table , library table , computer work station , one side book shelf , steel glass door almirah , steel almirah , 5 seater sofa , 4 seater sofa , metal bed , metal table with integrated storage , 8 seater ss top fixed canteen table , 6 seater ss top fixed canteen table , lab stool , high back chair , medium back chair , visitor chair , chair without arm , personal locker unit , magnetic white board , melamine surface non magnetic chalk board , tea table , physics table , ss one burner stock pot range , ss 2 burner indian cooking range. , ss single sink unit. , ss tilting type bulk cooker , ss tilting type boiling pan. , ss spice trolly . , ss work table with 1 bottom shelf. , chapati hot plate . , semi automatic chapati making machine . , conveyor type toaster . , ss 4 door vertical chiller. , deep freezer. , dry masala grinder . , pulveriser . , dough kneader. , ss 6 vessel hot bain marie with 1per1 gastro norm pan with front tray rail. , platfrom trolly . , kitchen utility trolly . , ss pot rack 4 shelf . , ss storage rack 4 shelf . , hdpe pallet of capacity 2200 to 2500 kg. , potato piller . , ss hood with ss filter , gi ducting for hot air suction . , fan for hot air suction . , 10 cylinder 5 x 2 10 lpg gas. , 1per 2 inchi dia lpg pipe line
Tender For fabrication work d d - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of sulfur furnace , makin