Tender For corrigendum : providing of custom bid for services - relocation and recommissioning of abro dynamicbalancingmachine from h3 building to d1 d2 building of pinaka rocket complex
Tender For vaccum filtration assembly technical specification and other details as per attached revised annexur , infra-red (ir) moisture balance / analyser technical specification, other details and required acces
Tender For supply of set of welded partition frame for non ac bangladesh coach. note: make/manufacturer of raw material shall be m/s jsl or m/s sail., as per drawing: mp25parnabang version 3, packing instruction: `packing condition of set of partition frame and procedure to achieve best possible protection during transportation: 1. surface preparation: - thoroughly clean the components to remove any dirt, grease or contaminants - apply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches and environmental factor. 2. packing materials: - wooden crates: construct sturdy wooden cage tailored to the component's dimensions. - steel strapping: utilize rust-proof steel straps to securely bundle components, preventing movement during transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plastic film or water proof ability paper, to guard against corrosion. 4. component arrangement: - place components on wooden pallets or within custom-designed supports to distribute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. securingthe components: - use steel straps or ropes to fimly anchor the components within thewooden crate, minimizing internal movement. - for added stability, employ bracing or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorbshocks. - hardware items to be suitably packed separately inside the crate. 6. labeling and documentation: - clearly label each package with essential information, including pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firm's & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - secure the packages to the container's structure using lashing ties or additional bracing as needed. 8. final inspection and sealing: - conduct a thorough inspection to verify thatall components are securely packed and that packaging materials are intact. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of set of welded partition frame for bangladesh ac chair car coaches.note: make/manufacturer of raw material shall be m/s jsl or m/s sail., as per drawing: mp25paraccbang version 2, packing instruction: `packing condition of set of partition frame and procedure to achieve best possible protection during transportation: 1. surface preparation: - thoroughly clean the components to remove any dirt, grease or contaminants - apply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches and environmental factor. 2. packing materials: - wooden crates: construct sturdy wooden cage tailored to the component's dimensions. - steel strapping: utilize rust-proof steel straps to securely bundle components, preventing movement during transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plasticfilm or water proof ability paper, to guard against corrosion. 4. componentarrangement: - place components on wooden pallets or within custom-designed supports to distribute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. securing the components: - use steel straps or ropes to fimly anchor the components within the wooden crate, minimizing internal movement. - for added stability, employ bracing or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorb shocks. - hardware items to be suitably packed separately inside the crate. 6. labeling and documentation: - clearly label each package with essential information, including pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firm's & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - secure the packages to the container's structure using lashing ties or additional bracing as needed. 8. final inspection and sealing: - conduct a thorough inspection to verify that all components are securely packed and that packaging materials are intact. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of set of partition frame for lsdd amrit bharat 3.0 ( (note- colour scheme is as per design letter no md48161 dated- 15/05/2026 ), as per drawing: mp26pfgsab3.0 version 0, packing instruction: `packing condition of set of partition frame and procedure to achieve best possible protection during transportation: 1. surface preparation: - thoroughly clean the components to remove any dirt, grease or contaminants - apply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches and environmental factor. 2. packing materials: - wooden crates: construct sturdy wooden cage tailored to the component's dimensions. - steel strapping: utilize rust-proof steel straps to securely bundle components, preventing movement during transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plastic film or water proof ability paper, to guard against corrosion. 4. component arrangement: - place components on wooden pallets or within custom-designed supports to distribute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. securing the components: - use steel straps or ropes to fimly anchor the components within the wooden crate, minimizing internal movement. - for added stability, employ bracing or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorb shocks. - hardware items to be suitably packed separately inside the crate. 6. labeling and documentation: - clearly label each package with essential information, including pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firm's & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - secure the packages to the container's structure using lashing ties or additional bracing as needed.8. final inspection and sealing: - conduct a thorough inspection to verify that all components are securely packed and that packaging materials are intact. [ warranty period:30 months after the date of delivery ] ]
Tender For procurement and installation of seed testing lab equipment at dr. ysr seed research and training centre, gannavaram, krishna dt. - digital moisture meter (gac gi 2100 or equivalent), cabinet type germinator, single chamber germinator, sample steel trolleys, vacuum seed counter, digital thermo hygrometer, armed illuminated magnifier, petri dishes, sample trays, moisture meter (dickey john small) m20p, ro unit (purified water), weighing balance, purity work boards, computer system, seed divider (boerner type), table top balance, forceps 6inches, spatula 6 (nickel plated), brush, seed sampling probes (triers set), hand screen, stereo scopic binocular microscope, seed blower, watch glass, desiccator, moisture bottle, hot air oven, portable humidifier, spray pump, refrigerator, seed scarifier, rakes and scrapers for seed germination in sand, walk-in germination chamber (15ft*11ft*9ft), x-ray machine / unit, incubator (plant growth chamber), dark chamber setup, weighing balance (analytical), documentation cabinet, autoclave, hot plate, hd trend microscope tagerino, smart phone based grain vernier, planting and counting boards (small/ medium/ large), laminar air flow cabinet, steel racks, storage cabinets, germination racks, lead seals