Get complete information related to latest Earth Dam Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Earth Dam Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Earth Dam Repair Tenders.
Tender For restoration of disturbed stone pitching in the u/s rip rap within rd 1120.00 mtr to rd 1175.00 mtr between rl 605.00 ft..to 630.00 ft. of left earthdam for the year 2026-27
Tender For restoration of disturbed stone pitching in the u/s rip rap within rd 7400.00 ft. to rd 7920.00 ft. between rl 605.00 ft. to 630.00 ft. of right earthdam for the year 2026-27
Tender For restoration of disturbed stone pitching in the u/s rip rap within rd 12290.00 ft. to rd 12820.00 ft. between rl 605.00 ft. to 630.00 ft. of right earthdam for the year 2026-27
Tender For restoration of disturbed stone pitching in the u/s rip rap within rd 6600.00 ft. to rd 7120.00 ft. between rl 605.00 ft. to 630.00 ft. of right earthdam for the year 2026-27
Tender For restoration of disturbed stone pitching in the u/s rip rap within rd 7930.00 ft. to rd 8400.00 ft. between rl 605.00 ft. to 630.00 ft. of right earthdam for the year 2026-27
Tender For improvement to u/s riprap such as removing and repacking of disturbed stone pitching within rd 1222.00 mtr. to rd 1300.00 mtr between rl 605.00 ft. to 630.00 ft. of left earthdam for the year 2026-27
Tender For restoration of disturbed stone pitching in the u/s rip rap within rd 7130.00 ft. to rd 7390.00 ft. between rl 605.00 ft. to 630.00 ft. of right earthdam for the year 2026-27
Tender For supply of din rail mounted earth leakage device (residual current monitor relay) with operatingvoltage 12-48 v ac/dc, conforming to iec 62020-1, suitable for sbc 2 of lhb power car. make: abb (rd3m-48) or bender (rcm470ly-21) or fanox (elr-3c) only as per rcf specification edts-103 rev-dam-1. [ warranty period: 30 months after the date of delivery ]
Tender For silt cleaning and embankment repair at various points of asni distributary and repair and protective work of hr, fall, fall cum bridge and bridge, culvert located at various points, silt cleaning and embankment repair and renovation of one outlet at various points of dhanupra distributary, silt cleaning and damrepair work at various points from 68.73 km to 84.05 km of ara main canal, repair work, outlet construction and earth work on hr of rpc-b, protective work and outlet construction work in diliyanarayanpur distributary, damrepair and silt cleaning work at various points of ara main canal, damrepair and silt cleaning and outlet construction work at various points of kumhari canal, protective wall construction and repair work at various points of panwari distributary, g.e.o bag at various points between 21.724 km to 30.554 km of ara main canal pitching, damrepair and construction of protective wall, outlet construction and silt cleaning work at various points between 0.00 km to 15.00 km of sakala distributary, damrepair and construction of protective wall with g.e.o bag at various points of kataiya distributary, damrepair and construction of protective wall with g.e.o bag of gadhani sub-distributary, damrepair and construction of protective wall with g.e.o bag at khelaria fall of bihiya branch canal, protective wall cc block and siphon construction of 1200 mm diameter at 4.7 km of keshari distributary and silt cleaning work, construction of damaged outlet at various points, construction of 10 more outlets at various points of taar distributary, construction of 4 more damaged face walls and pcc work in the bed of 2 more siphons, dam at various points of lpc-b repair and silt cleaning work, damrepair and silt cleaning and protective wall construction work between 0.00 km to 04.50 km of amuna distributary, repair work near 0.00 km hr of kori sub-distributary, damrepair and silt cleaning work at various points of lpc-d, damrepair and silt cleaning work at various points of chaurai sub-distributary, damrepair and silt cleaning work at various points of bichhiyaon sub-distributary, renovation work of one outlet in belaur sub-distributary, construction work of outlet at various points of hetampur distributary, construction work of 3 more outlets and construction of 2 more face walls at various points of r.p.c-3 and 2 more outlets at various points of r.p.c-4 construction work