Get complete information related to latest Earth Leveling Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Earth Leveling Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Earth Leveling Tenders.
Tender For supply of material and job work under special repair to restoration and conservation of tomb of saiyed saif khan and his mother majhera muzaffarnagar 2025 2026 - items to be executed, unslaked lime, surkhi, c. sand, gur, belgiri, gum, brick aggregate 20-25 mm, 2nd class brick, kakkar stone, white marble, 65mm thick red sand stone 10 sqm, grey/white sand stone, rr stone, 65mm thick red sand stone 10 sqm (for arch), lakhori brick, tile bricks, mud including top finish, kail wood sleeper, raking out joints in lime or cement mortar and preparing the surface for re-pointing or replastering, including disposal of rubbish to the dumping ground, all complete as per direction of engineer-in-charge., ruled/ flush pointing on white sand stone masonry surface with lime, surkhi and marble dust mortar in the ratio of 1:1.5:1/2 {one lime : 1.5 surkhi (15% dark red and 85% light yellow surkhi) : 1/2 marble dust}. (the rate is inclusive of all materials & labours involved except scaffolding)., demolishing lime concrete manually/ by mechanical means and disposal of material within 50 metres lead as per direction of engineerin- charge., providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia m.s. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with m.s. tubes, m.s. tube challis, m.s. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. the scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of engineer-in-charge. note:- (1) the elevational area of the scaffolding shall be measured for payment purpose. (2) the payment will be made once only for execution of all items for such works., "earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 2.8.1 all kinds of soil.", surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. 2.28.1 all kinds of soil, "demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in - charge. nominal concrete 1:4:8 or leaner mix (including equivalent design mix)", provision for providing & making lime slacking & mortar pit by means of pit excavation, brick masonry & plastering over it. the size of the over all pit is 8.00m x 3.00m & depth is 1.00m. the pit is divided in to three parts & cement plastere, provision for removal of malba for cleaning the sites including collecting, staking and disposal of the rubbish /malba upto 100 meter lead including all the labour and transportation etc complete. out of the monuments premises and further, provision for the purchasing of essential article and t & p for the proper execution of the work i) pvc sheet, ii) pvc pan (tasla), iii) hammer with handle 1kg, iv) iron chisel 4",6", 8", v) pvc bucket, vi) pvc mug, vii)wire & coir brush, viii) wire & coir brush, ix) gum boot pvc in pair, x) pvc pipe 1", xi) wooden handle (fawra, hammer), xii) first aid box with medicine, provision for drawing and documentation charges including inspection of exis
Tender For a/mtc. of sewerage scheme in sector-9, charkhi dadri 2025-26. `providing, laying and jointing of new sewer line of suitable size in place of damaged line, including excavation in all kinds of soil, disposal of surplus earth, lowering of pipes in trenches, making proper joints, refilling with available earth, compaction, restoration of road berm in sector-9, charkhi dadri and all other works contingent thereto. a/c rs. 1.00 lacs
Tender For desilting work of kathauta and bharwara lake including dewatering, carting and disposal of silt within nn lucknow limit including loading and unloading with earth movers, dumpers, trucks with necessary arrangements as per direction of engg. in charge
Tender For bioremediation of legacy waste scientific dumpsite land reclamation through bio-mining and resource recovery including screening maintenance manpower involvement hiring of earth moving equipment spraying of bio-culture transportation and disposal o
Tender For corrigendum : supply of digital radiography system type c (qty:10) - digital radiography system 50kw ceiling suspended type, single detector with all accessories as per specifications except the following, x-ray table 6 way floating table, dry imager with 2 online trays, additional detector (rate fixed for three years from the date of price bid opening), light weight lead apron with thyroid gaurd, additional workstation, x-ray trolley table (not taken for evaluation), x-ray table four way (not taken for evaluation), x-ray view box double film (not taken for evaluation), cost of one viewing station (hardware) with necessary software and ups (not taken for evaluation), fully automated full length image stitching on table and vertical bucky necessary hardware and software (not taken for evaluation), 15.12.2:dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:of area beyond 3 sq. metres, 15.12.1:dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:of area 3 sq. metres and below, 15.23.1:dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.for thickness of tiles 10 mm to 25 mm, 15.3:demolishing r.c.c. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of engineer -in-charge., 15.57:dismantling aluminium / gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 metres lead as directed by engineer - in-charge, 15.7.4:demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge.in cement mortar, 15.60:disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved, 2.1.1:earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:all kinds of soil, 50.2.25.1:filling with contractors own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site engineer-in-charge, 2.34.1:supplying chemical emulsion in sealed containers including delivery as specified.chlorpyriphos / lindane emulsifiable concentrate of 20%, 2.35.1.1:diluting and injecting chemical emulsion for post -constructional anti-termite treatment (excluding the cost of chemical emulsion):along external wall where the apron is not provided using chemical emulsion @ 7.5 litres / sqm of the vertical surface of the substructure to a depth of 300mm including excavation channel along the wall & rodding etc. complete:with chlorpyriphos /lindane e.c. 20% with 1% concentration, 50.4.1.1:providing and laying in position cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size) up to floor five level excluding the cost of centering, shuttering, finishing for leveling coarse of floor and roof etc., 50.5.33.2:providing and laying in position machine batched and machine mixed design mix m-20 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the
Tender For corrigendum : supply of digital radiography system type b (qty:10) - digital radiography system 80kw ceiling suspended type, single detector with all accessories as per specifications except the following, x-ray table 6 way floating table, dry imager with 2 online trays, additional detector (rate fixed for three years from the date of price bid opening), light weight lead apron with thyroid gaurd, additional workstation, x-ray trolley table (not taken for evaluation), x-ray table four way (not taken for evaluation), x-ray view box double film (not taken for evaluation), cost of one viewing station (hardware) with necessary software and ups (not taken for evaluation), fully automated full length image stitching on table and vertical bucky necessary hardware and software (not taken for evaluation), 15.12.2:dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:of area beyond 3 sq. metres, 15.12.1:dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:of area 3 sq. metres and below, 15.23.1:dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.for thickness of tiles 10 mm to 25 mm, 15.3:demolishing r.c.c. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of engineer -in-charge., 15.57:dismantling aluminium / gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 metres lead as directed by engineer - in-charge, 15.7.4:demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge.in cement mortar, 15.60:disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved, 2.1.1:earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:all kinds of soil, 50.2.25.1:filling with contractors own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site engineer-in-charge, 2.34.1:supplying chemical emulsion in sealed containers including delivery as specified.chlorpyriphos / lindane emulsifiable concentrate of 20%, 2.35.1.1:diluting and injecting chemical emulsion for post -constructional anti-termite treatment (excluding the cost of chemical emulsion):along external wall where the apron is not provided using chemical emulsion @ 7.5 litres / sqm of the vertical surface of the substructure to a depth of 300mm including excavation channel along the wall & rodding etc. complete:with chlorpyriphos /lindane e.c. 20% with 1% concentration, 50.4.1.1:providing and laying in position cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size) up to floor five level excluding the cost of centering, shuttering, finishing for leveling coarse of floor and roof etc., 50.5.33.2:providing and laying in position machine batched and machine mixed design mix m-20 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the
Tender For -custom bid for services - tender for attending fire water, raw water and other ug line leakages at mrpl aromatic complex as per boq (bidder has to quote lumpsum price higher or lower than the sor value excluding gst as per boq).-1 1050799 earth work in excavation by manual / mechanical means below ground level in all kinds of works in all types of soils, depth 0 to 1.5 m in any work condition irrespective of magnitude of work, work place, work space, height, degree of complications, temperature, gradient including setting out, removal of vegetation, shrubs and debris, cutting and dressing of sides in slopes, construction of shoring, strutting and bracing, leveling, grading and ramming of bottoms, dewatering up to any extent of accumulated water from any source and keeping the surface dry for subsequent works, disposal or stacking of excavated material within a lead of 2km, . all complete as per standard specifications and diretction of engineer incharge, 2 1050800 earth work in excavation by manual / mechanical means below ground level in all kinds of works in all types of soils, depth 1.5m to 3.0m in any work condition irrespective of magnitude of work, work place, work space, height, degree of complications, temperature, gradient including setting out, removal of vegetation, shrubs and debris, cutting and dressing of sides in slopes, construction of shoring, strutting and bracing, leveling, grading and ramming of bottoms, dewatering up to any extent of accumulated water from any source and keeping the surface dry for subsequent works, disposal or stacking of excavated material within a lead of 2km, etc. all complete as per standard specifications and diretction of engineer incharge, 3 1050801 earth work in excavation by manual / mechanical means below ground level in all kinds of works in all types of soils, depth 3.0m to 4.5m in any work condition irrespective of magnitude of work, work place, work space, height, degree of complications, temperature, gradient including setting out, removal of vegetation, shrubs and debris, cutting and dressing of sides in slopes, construction of shoring, strutting and bracing, leveling, grading and ramming of bottoms, dewatering up to any extent of accumulated water from any source and keeping the surface dry for subsequent works, disposal or stacking of excavated material within a lead of 2km, etc. all complete as per standard specifications and diretction of engineer incharge. 4 1050802 backfilling and compacting the soil in layers of 300mm after execution of the work to proper grade and level with selected materials from available excavated soil from soil heaps within a lead of 2.00km, including re- excavating the deposited soil excavated earlier, breaking clods, loading, transportation, unloading, spreading to required level, watering, rolling and ramming by manual methods/ mechanical compactors, dressing, trimming etc. with all tools & tackles, machinaries, labour etc complete as per standard specifications and diretction of engineer incharge. 5 1050803 transporting & disposal of the surplus earth and excavated material including shrubs and vegetations from construction area to maximum lead of 2.0 km including reexcavating the deposited soil excavated earlier, loading, transportation, unloading, laying at all depths and heights, stacking, leveling and dressing both the area (viz. from where the earth is transported and where it is deposited) to required levels and slopes all complete as per standard specifications and diretction of engineer incharge.(the work volume of surplus material shall be measured as the difference of volume of excavation & the volume of back filling.), 6 1050804 pumping out water including dewatering the water mixed with muck/sludge etc from the trenches, ponds and other miscellaneous areas including supply and installation of dewatering pumps by contractor with all labour, hoses, consumables fuel etc.complete as per the directions of engineer incha
Tender For corrigendum : removal of mill rejection coal dust debris earth etc and disposal of stone boulders and assorted refuses at btps - removal of mill rejection, coal dust, debris, earth etc. and disposal of stone boulders & assorted refuses at btps