Web Analytics Made Easy - StatCounter

Earthmover Tenders

Get complete information related to latest Earthmover Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Earthmover Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Earthmover Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :40754113 Due date: 02 Jul, 202502 Jul, 2025 NA
Tender For corrigendum : custom bid for services - non-core maintenance activities in m&s-1. the scope of work includes carrying out the following non-core activities of maintenance and services department at bhelpppu, thirumayam as per instructions of maintenance in-charge. as per bhel estimate, it requires indicative 2 no. of unskilled labours daily to complete all the below activities. 1. cleaning of machines, components, oil spilled area during and after maintenance. 2. movement of spares, components and consumables for maintenance. 3. maintenance assistance for heavy works. 4. handling of lubricants, hydraulic oil, gas cylinders and diesel. contractor's scope: aa) cleaning of machines, components and oil spilled areas during and after maintenance: 1. cleaning of sub-assemblies and dismantled components while attending the break-down of machines. 2. cleaning of machine bottom floor, facility bottom floor and hydraulic power pack surrounding area as and when required. 3. cleaning of the machine surface and other accessories & fixtures of the machines for trouble shooting and to access the machine components during maintenance. 4. cleaning of the machine, floor area after attending the breakdown. all the spillage oil, oil soaked cotton waste, refractory wastes and other scrap wastes generated during maintenance to be removed from the surroundings of the machine and moved to the waste bins. 5. cleaning of oil, chips and dust inside and outside machine pit and intricate areas of machines while attending maintenance. 6. cleaning of machine components, filters and stand-by sub-assemblies with suitable cleaning agents. 7. cleaning of machines under shifting and assisting the fitters & electricians for dismantling, shifting and re-erection activities. 8. cleaning of crane parts at the top of the cranes and at the floor level are to be done as per instruction of maintenance in-charge. bb) movement of spares, components and consumables for maintenance: 1. movement of machine components from machine area to work bench and vice versa. 2. movement of raw materials for spares manufacturing to the respective machine shop. 3. movement of spares, consumables, raw materials, gas cylinders, etc., from stores to respective maintenance sections/areas and vice versa. 4. movement of heavy duty cables and cable drums from storage area to work place and vice versa. 5. movement of waste / scrap material to the respective disposal area. 6. movement of crane parts and lifting tackles during maintenance and for testing. 7. movement of furnace castings, refractory bricks, castables, refractory cement, ceramic wool, etc. for furnace maintenance. cc) maintenance assistance for heavy works: 1. assistance in activities like cable laying, dragging, winding, etc. 2. loading & unloading of lpg cylinders, refractory materials, machine parts, etc. from transport vehicles. 3. assisting in loading & unloading of machines / machine parts during erection and shifting of machines as and when required. 4. assistance in various maintenance activities involving heavy works like tightening / loosening of heavy duty fasteners, removal & assembly of heavy bearings, etc. 5. handling of heavy parts of the machine during maintenance. dd) handling of lubricants, hydraulic oil, gas cylinders and diesel: 1. cleaning of lubrication and hydraulic system of machines fairly without any oil traces. 2. assisting fitters for changing the worn out/damaged parts such as hoses, valves, high pressure pipe fittings, filters, etc., while doing maintenance of the systems. 3. assisting in oil top up/replacement with proper grade of oil in the respective hydraulic / lube oil tanks and gear boxes in the machines / equipments. 4. assisting in greasing of machines, cranes and facility items at pppu. all greasing points in the plummer blocks, pillow blocks, guide ways, machines greasing points are to be filled with necessary grade of grease manually or using grease gun wherever possib

CTN :40568135 Due date: 03 Jul, 202503 Jul, 2025 NA
Tender For corrigendum : supply of vane pump , cabin lifting pump , shock absorber assy , system protection valve , air filter pre , air compressor kit , tail light assy , caliper brake pad , piston ring , clutch plate , pressure plate

CTN :40878378 Due date: 03 Jul, 202503 Jul, 2025 2.50 Lacs
Tender For work of repairing, servicing, painting and testing of 5 ton capacity hot monorail lifting system

State Government

CTN :40360639 Due date: 04 Jul, 202504 Jul, 2025 10.29 Lacs
Tender For corrigendum : hiring of truck / tempo type vehicle above 05 ton with gps system for lifting of material on monthly basis for 24 hour, 12 month instrument under mandvi division. pr no : 779375

Central Government/Public Sector

CTN :40874240 Due date: 18 Jul, 202518 Jul, 2025 NA
Tender For supply , installation and commissioning of 25 ton (universal ) synchronized lifting jack elect rically operated , remote control system from a distance of 50 mtrs from the location of jack ( set of 5 /jmp jack) (specification as per attached design of jamalpur workshops) [ warranty period: 30 months after th e date of delivery ]

CTN :40843053 Due date: 10 Jul, 202510 Jul, 2025 NA
Tender For supply of breathing air compressor,folding scoop stretcher,floating stretcher,spin board stretcher,inflatable shelter,air tight chemical protection suit type 8,throwa8le emergency rescue inflatable survival rescue stick,large double webbed layer nylon rescue nets,light warning jackets,electricians gloves 20v size 10 length 36 cm,heat protection gloves aluminized length 430 mm one size certified as,3 layer aluminium fire proximity suit with b a set arrangement,water gel blanket,pelican 3315 elpel 3315,rope launcher,rope ladder of polypropylene 20 m,tripod system with winch decenders and ascenders,pelican 2410n dive light nemow water proof underwater use,chain lifting 3 ton complete with end rings and shackles with 6 mtrs chain,pulling and lifting machine 5 ton capacity complete with wire rope and hook,pulling and lifting machine 3 ton capacity complete with wire rope and hook,safety belt with hook full body harness karam make,longline 30 meter size 50mm circumference,lowering line 30 meter size 50mm circumference,manila

Central Government/Public Sector

CTN :40665021 Due date: 30 Jun, 202530 Jun, 2025 NA
Tender For corrigendum : supply of rocker fork etc e e - rocker fork for 2650t press as per drawing 01 05 130 , thread coupling as per drawing 01 05 005 r2 item no 1 to 4 , lifting rod as per drawing 01 05 236 , mu 25 valve cone for 2650t press as per drawing 01 05 237 sheet 1 , mu 25 valve seat for 2650t press as per drawing 01 05 237 sheet 2 , h c clamp 12 inch copper insert as per drawing 02 01 008 r5 , lift rod of drive system as per drawing 021 01 172 sheet 4 of 9 , rod end of drive system as per drawing 021 01 172 sheet 3 of 9 , screw fitting of drive system as per drawing 021 01 172 sheet 01 of 9 , safety plate of drive system as per drawing 021 01 172 sheet 7 of 9 , guide of drive system as per drawing 021 01 172 sheet 2 of 9 , bushing and ring item no 1 and 2 of drive system as per drawing 021 01 172 sheet 6 of 9 , bolt of drive system as per drawing 021 01 172 sheet 9 of 9 , ball socket of drive system as per drawing 021 01 172 sheet 5 of 9

Central Government / Public Sector

CTN :40685457 Due date: 03 Jul, 202503 Jul, 2025 24.49 Lacs
Tender For corrigendum : custom bid for services - rpnc252027 support service for swing extruder vfd installation-shifting, foundation and installation of power transformer- 1. the power transformer is to be installed by construction of new transformer foundation, dismantling/modification of surface, providing chain link fencing on all other 4 sides, cleaning and refurbishment of bay area is in the scope of contractor only. all necessary manpower, tools & tackles, shifting machinery like hydra/crane etc shall be in the scope of contractor only. 2. shifting of power transformer of 7.2 mva onan from store to site, loading-unloading, erection, site storage are in scope of contractor. 3. the basic data sheet and ga drawing of the proposed transformer is attached in scope only. 4. the bidder if required must construct bay width, height and fire walls as per relevant is/iec/oisd standards and site conditions such that adequate clearances for maintenance shall be maintained. bidder to submit the plot plan of equipment layout of transformer layout along with the bid. the bidder shall carryout the site visit for assessment of the available installation space. the total length of the transformer bay should be such that the radiator can be accommodated on either side of transformer tank in the specified bay width. 5. all necessary earth pit provisions, & fire barriers/wall modifications, provision of new hvws water sprinklerbased firefighting system having suitable capacity for protection against the fire & explosion as per the design of supplied transformer and applicable standards & direction of eic. provision of all necessary fire protection system for transformers shall be in the scope of lstk contractor. 6. construction of oil drain facility of transformer as per is standard and hookup with existing burn oil pit. 7. the erection to be certified by contractor as per its recommended procedures which is to be submitted prior to erection. qap for erection and site commissioning shall also to be endorsed by contractor. 8. all kind of lifting, rigging work for loading-unloading, erection work including supply of hydra/ cranes, lifting rigging materials, manpower, tools and tackles as required are in scope of contractor. 9. all kind of skilled, semi-skilled, unskilled manpower as per itc of transformer requirement will be in the scope of contractor. 10. erection includes entire vacuum by proper capacity of vacuum pump, for not less than 48 hours, or more if required as per the instruction of engineer in charge. 11. first filling up of the transformer oil at site, its filtration, site testing oil sample, any refiltration required during final commissioning shall be in the scope of contractor including all tools, tackles and including oil filtration machines. oil may be supplied in drums, which should be properly sealed during transportation and storage. seal shall be verified and opened in front of iocl representative before filling in transformer. contractor should have enough storage capacity for handling oil. filling the oil from drums to the transformer through suitable capacity of high-quality filter machine and filtration of the same to get desired bdv &ppm as specified by engineer in charge and transformer manual. 12. contractor must replace all the gaskets by new ones if required by engineer in charge. 13. the contractor shall arrange nitrogen cylinder required at site for above work. 14. contractor must repaint the transformer tank with two coats of anti-rusting good finish ltbs grey shade 631 of is:5 by spray painting if required and as per the direction of engineer in charge..

CTN :40841527 Due date: 02 Jul, 202502 Jul, 2025 2.46 Lacs
Tender For maintenance and operation of electrical and and mechanical services for gpra at bangalore. sh: servicing of submersible pump set including lifting, lowering and repairing of cctv surveillance system.

State Government

CTN :40227801 Due date: 08 Jul, 202508 Jul, 2025 49.58 Lacs
Tender For corrigendum : various routine/preventive and breakdown maintenance work on as and when require basis at chp-gtps - replacement of hammer rings for stage ii crusher , replacement of hammer rings for stage i crusher , replacement of screen plate / breaker plate/kick off plate of stage i and ii crushers , replacement of rotor of stage i crusher with disassembling of removed rotor and assembling of new/repaired rotor , replacement of drive end side bearing / pedestal of crusher rotor or complete gear coupling set of crusher or repositioning of dislocated rotor of crusher , replacement of non drive end side bearing/pedestal of crusher rotor or complete alignment of crusher motor with crusher rotor , replacement of broken hammer rings of stage i and ii crushers (stage i crusher up to 12 nos.of hammer rings and stage ii crusher up to 06 nos. of hammer rings at a time) , replacement of rail of rail table of wagon tipplers 1/2/3/4 (in one side full length) , replacement of clamping rubber pads of clamp for wagon of wagon tipplers , replacement of whole resting pads for wagon of side beam of wagon tipplers , replacement of spill plate roller of wagon tipplers , repairing/preparation/ fitting and replacement of hooks/rods/turn buckle, chain, sling rope ,spring assembly etc. of vibrating trays and crusher house trays , spillage control at various locations , miscellaneous cutting/welding work require at various locations , replacement of gearbox in conveyor no. 2a/b,11a/b,12a/b,13,14/15,16a/b,17a/b ,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of gearbox in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement of slow speed coupling set (two halves) of drive pulley , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.2a/b,11a/b,12a/b,13,14/15,16a/b,17 a/b,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement/removing/refitting of various size and type of fluid coupling , replacement or removing & refitting of any internal/bearing/input/ output oil seal of various size and type of gear box , overhauling of dismantles old/used gearbox in all respect with fitment of input and output coupling. , replacement of drive pulley , replacement of drive end side bearing of drive pulley or repositioning of dislocated drive pulley , replacement of non drive end side bearing/any side pedestal of conveyor drive/non drive pulley , alignment of motor/ gearbox/drive pulley including decouple/couple of coupling , nut bolt and drive system checking with replacement of broken nut bolt in all 04 wagon tipplers no.1/2/3/4 as per scope , lifting and releasing of gravity take up of any conveyor belt for locking and de locking of belts for other than belt replacement work , loosening and tightening of horizontal type screw take assembly of any conveyor belts for other than belt replacement work , work of dismantling and re erection of new/repaired apron pan from existing apron feeder of wagon tippler , repairing of upper/lower structure/cone plates of damaged/bend apron pan , replacement of carrying roller of apron feeder , replacement of worn out/ damaged ti roller and garland rollers. , replacement of worn out/ damaged impact rollers , replacement of worn out/ damaged return rollers , replacement of various worn out/ damaged ti roller stands , replacement of various worn out/ damaged impact roller stands , replacements of various worn out/ damaged return roller stands , replacement of various worn out skirt rubbers [10 m each] and skirt rubber with angle , preparation and replacement of guide rollers with bracket in place of worn out/ damaged gu
 Loading, Please wait...

Connect us via What's Up