Tender For operation and routine maintenance of clear water and dewatering pump sets, d.g. sets, mechanical ventilation system, street lighting, common area lighting and repairing of fire fighting systemetc.
Tender For providing and installation of power supply line 1phase lt for street lighting system in nagar panchayat kunihar from existing s-stns., 250kva talab, 100kva uchagaon in e section kunihar under electrical sub-division hpsebl kunihar.
Tender For corrigendum : supply, installation, testing, commissioning, operation and maintenance of centralized control and monitoring system (ccms) for street lighting on (i) zirakpur-end of sangrur bypass section of nh-64 (new nh-07) from km. 0.000 to km. 123.900 and (ii) start of sangrur
Tender For corrigendum : supply of various types of cables for smooth functioning of the city street lighting system. - शहर की पथ प्रकाश व्यवस्था सुचारू किये जाने हेतु वभिन्न प्रकार की केबिल की आपूर्ति का कार्य।
Tender For planning, design, construction, testing and commissioning, certification, validation of biosafety level-3 (bsl-3) laboratory (g plus 1 floor) in epc mode-i under pm-abhim for national centre for disease control (ncdc) at kims, hubballi, karnataka inclusive of (i) obtaining of all local body approvals, eia, consultancy services (architectural, structural & mep), modular pre-fabricated wall panel & pre fabricated ceiling panel, epoxy flooring, doors, drains, water supply piping in bsl-2/3 lab containment area, sanitary installation, internal roads, parking facilitation, ug sump, terrace water tank, water supply lines, storm water drains, external sewerage system, service trenches, demolishing of existing structure, retaining walls, internal electrical installations, fire alarm system, fire fighting system, lifts, sub station, dg sets, ups, air conditioning system (hvac & vrv/vrf), cctv, access control system , ibms, lan, ip based epabx system, audio visual system, boom barriers,subwork/packages:etp equipment and street lighting etc., (ii) design, supply, installation, testing and commissioning of all equipment for bsl-3 & bsl-2 lab. (iii) certification, validation, commissioning of bsl-3 lab facility from third party validation agency. (iv) operation of complete facility for 5 years, annual maintenance during 3 years defect liability period plus 2 years comprehensive maintenance of complete bsl-3 lab facility including all equipment after 3 years dlp including annual validation