Get complete information related to latest Electrical System Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Electrical System Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Electrical System Tenders.
Tender For corrigendum : tender for provision of ss plate drain tray over switch board cabinet (sbc) of lhb coaches to prevent entry of rainwater into electricalsystem over ddn (72 nos.), ynrk (15 nos.) & be (30 nos.) coaching depots of moradabad division.
Tender For corrigendum : tender for dehydration of bank i 220/66kv 100 mva 3x33.33mva power transformer and 1 x 33.33 mva spare power transformer (make bharat bijlee) installed at 220/66/22 kv substation kotla under electricalsystem division hpsebl, kotla (jeori)
Tender For corrigendum : providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - laboratory; substation, electricalsystem or installation; service provider
Tender For bid to ras corrigendum : providing of operation and maintenance of electricalsystems/electrical installations - distribution panel retrofitting work and jb fitting work in each block at gtps
Tender For providing of custom bid for services - 200153117 deployment of contract manpower for round the clock repair and maintenance of electricalsystem in fgd of ntpc lara
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - nuclear power plant kaiga generating station kgs 3 and 4; electricalsystem or installation, power house equipment, servicing of ms schneider make 415v ac air circuit br..
Tender For regular operation and maintenance of street lights (with material) at all industrial areas under riico ranpur kota(for 2 years) - regular operation and maintenance of high mast light in ranpur , kota including supply and replacing the required material and labour etc. complete as per the following terms and conditions:- i at any moment a minimum of 90% of total fixture must be in order. the defective fixture must be repaired within 3 days, falling which deduction for number of light which are not functioning in the industrial area shall be made at one time of the rate (accordingly deduction for lights which are not functioning becomes two times of the rates from total payment due for total number of lights whose operation and maintenance was awarded to the contractor ). ii contractor shall arrange at his cost for put on & off the street light fixture at appropriate time regularly as per instructions of engineer-in charge. a register shall be maintained at riico/association office and complaint lodged must be attended by contractor within 24 hours. the person deputed by contractor shall attend the riico/association office daily and comply the instructions and attend complaints regularly. iii contractor will have to employ trained and qualified electricians for the work. iv corporation shall not be responsible for any kind of accident during execution of work. v contractor will be responsible for safety and security of fixtures and all concerned materials. vi contractor will be responsible for arrangement of all t&p required for the work vii cost of all labour and material like lamp / balllast wire etc. will be born by contractor. all material required for the work shall not be below the category-ii of concerned bsr item. contractor has to repair and maintenance of fixture with material in all cases like short circuit, phase to phase of jvvnl line etc. viii no extra payment will be made for fixing/removal of extra/existing fixture in the industrial area. ix contractor will be responsible for timely collection and deposition of electric bills of areas in each month. in case of delay in payment and jvvnl impose surcharge for delay payment the same will be recovered from the running bill fo the contractor. payment of electricity bill will be made by riico. x contractor will be responsible for rebate of timer provided by jvvnl. hence contractor will maintain the on/off system by timer properly. in case no rebate is provided by jvvnl due to failure of timer then rebate will be deducted from contractor payment. xi contractor will be responsible for any theft of electricity through poles and he will make necessary arrangements for this. in case of any theft is found suitable penalty will be imposed on the contractor. xii contractor will maintain cubical panel board and assessories fitted in it. in case of any fault repair/replace of material will be done by the contractor at his own cost. no extra payment will be made on behalf of material. xiii contractor has to keep ready total fixtures. in case of fault of fixture a penalty of rs.100/- per fixture per day will be imposed on the contractor., regular operation and maintenance of street light fixtures hpsv/ hpmv (70w/150w) in ranpur, kota including supply and replacing the required material and labour etc. complete as per the following terms and conditions:- i at any moment a minimum of 90% of total fixture must be in order. the defective fixture must be repaired within 3 days, falling which deduction for number of light which are not functioning in the industrial area shall be made at one time of the rate (accordingly deduction for lights which are not functioning becomes two times of the rates from total payment due for total number of lights whose operation and maintenance was awarded to the contractor ). ii contractor shall arrange at his cost for put on & off the street light fixture at appropriate time regularly as per instructions of engineer-in charge. a register sh