Tender For corrigendum : supply of cuplock scaffold from goose neck to furnace roof of boiler for 500mw power plant , additional scaffolding below goose neck for boiler of 500 mw powerplant
Tender For corrigendum : fabrication / extension of platforms near aph area, id fans intel damper area, esp top roof shed structure extension, esp platform extension and boiler area etc. of unit-i at dcrtpp, hpgcl, yamuna nagar
Tender For work of dismantling & removal of damaged precast rcc roof panels of boiler penthouse with associated fabrication work @62 metre height for safety purpose at unit 6 tps, parli-v.
Tender For supply of aluminum cladding sheet, 0.7mm thick and 1.2m wide, weight of 1 roll 1014 kg , gi corrugated sheet for boiler outer side surface, galvanized color coated roof profiled trap sheets
Tender For supply of repairing of furnace with setting of nozzles and correcting its dot and slope, so that bagasse may fall in furnace without any interruption. , dismantling of bent and swollen wall of furnace of feed pump side above side wall header and again correct it by repairing of boiler 1 and 2. , checking the baffle from screen tube to back wall of both boilers and correcting it by reconstructing and fixing the broken baffle. , repairing the leaky or broken roof of both boilers. , repairing doors, windows etc. of both boilers by applying castable and completing the work found during checking on time and giving satisfactory trial.
Tender For corrigendum : supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bot
Tender For roof treatment works by bituminous water proofing membrene ( app ) over the roof of transformer room, panel room, boiler rooms,analytical chemistry room and staff quarter room in institute jute technology building under university of calcutta.
Tender For supply and infusing work of high temperature fill pad material in furnace roof and aph guide bearing area of boiler during coh of unit-5 at bhusawal tps. - roof casing sealing membrane, work of infusing of ht fill pad material, pent, dog, cat house sealing from furnac