Tender For supply of single mode single fibre to ethernetmediaconverter, make: syrotech digisol or similartp link as per annexure-a [ warranty period: 30 months after the date of delivery ] ]
Tender For bid to ras corrigendum : supply of cp plus 32ch nvr , cp plus 2 mp 25x 100 mtr ir ptz camera , wd 4 tb surveillance hard disk , cp plus 4 plus 2 poe switch , cp plus cat 6 24 awg outdoor double jacket copper cable , blue rack small outdoor enclosure with pole mont accessories and clamp , blue rack pdu 5 amp 3 socket , ptz pole mount bracket 7 x 6 with 2 nos steel looping ring , d link rj45 connector , bulltronics 9u rack , 6 port power distribution unit , d link 16 port gigabit switch , fyber 20km fiber to ethernetmediaconverter 10 by 100 , mediaconverter 14 port chasis tray , optical fiber cable 6 core 2 steel , fiber optic joint enclosure box 2 way , 12f fully loaded rack mount drawer type liu , fiber optic patch cable 3 to 5 mtr , 2 core wire 1.5mm submersible cable , installation charges , lg 55 inch 4k led lv , portronics 5 mtr 4k60hz hdmi cable , logitech wireless mouse m170 , portronics unconnect 1.5m usb extension cable , micro tech ups 5 kva , iron pole 20ft height 4 inch ) /bid number : gem/2026/b/7480203 * /dated: 04-05-2026 & & / bid document 1 / 24
Tender For corrigendum : selection of agency for providing network management system (nms) and help desk solution (hds) for monitoring extended connectivity nodes under goa broadband network (gbbn)
Tender For supply of mediaconverters, multi mode, gigabit to ethernetmediaconverter 10/100/1000 mbps :- make d-link 1000m series dmc-g550sc multi mode converter , cisco, tp-link, nova star or equivalent [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of optical to ethernetmediaconverter for single mode single fiber as per rdsospecificationno.rdso/spn/tc/103/2013 rev.2. make :mrotek/cygnus/digisol/dlink).warranty upto 30 monthsfrom date of supply. [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : broadband connectivity with new isps/ aggregators broadband services at hmwssb locations for a period of two years under gm(it).