Get complete information related to latest Field Control Panel Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Field Control Panel Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Field Control Panel Tenders.
Tender For supply of volvo pax coach materials - air conditioning panel board , blower motor , condenser fan motor , spring brake cylinder , pneumatic control unit 24v , bellow level solenoid
Tender For routine monitoring/preventive maintenance/breakdown/ emergency/regular servicing of pneumatic cylinders,solenoid valves,limit switches & pressures switches pertains to units-5,6&7 mill reject handling system(mrhs).2.operation and maintenance of dense phase mill reject handling system of unit-8.the work involves a) operation and maintenance of dpmrhs plc system. b) i&c maintenance works of air compressor.c) servicing/recalibration of solenoid valves,limit/proximity switches & pressures switches etc.3.routine monitoring/maintenance of spm analyzer systems pertains to unit-5 to 8.the work involves a)cleaning/servicing of transmitters & reflector units and blower filters of spm analyzers, pertains to units- 5 to 8.b)carrying out maintenance works under the supervision of i&c engineer. regular monitoring/checking healthiness of unit-7&8 coal bunker level monitoring systems.4.routine maintenance of bunker level monitoring systems.the work involves a)cleaning/checking of 3d level sensors.b)cleaning/checking healthiness of local controlpanel at bunker floor.c)ensuring healthiness of signals to control room pc,dcs&chp control room digital indicators.5.regular monitoring/maintenance of hfo tanks level measurement systems.the work involves a)cleaning/checking healthiness of radar level transmitters installed at hfo tanks.b)cleaning/checking healthiness of local digital indicators installed at foph.c)cleaning/checking healthiness of plc unit installed at ucb-7.6.the nature of work is round the clock maintenance.7.the cleaning/servicing and maintenance works of all the above mentioned systems shall be carried out during units aoh period.8.the required t&p and ppe for carrying out maintenance works shall be arranged by the contractor/agency itself.
Tender For supply of spares for afdss system of cat make 992k wheel loaders - controlpanel asm. for two zone system, part no. - acfz29222 , sensor cable assembly, part no. - ac42522030 , dry chemical powder, part no. - ac42511001 , cyl cap with pneumatic manual operation, part no. - ac502023 , co2 expellant gas cartridge 300 gm, part no. - acfz11002 , actuation device, part no. - acfz11001 , nozzle conical -brass, part no. - acfz13008 , horn unit for zone wise, part no. - acfz22002 , harness cable assembly with connector, part no. - acfz21001 , rupture disc assembly, part no. - ac505032 , zone selector switch, part no. - acfz69222 , dcp cylinder 15 kg, part no. - ac502014 , harness cable assy complete with connector, part no. - ac505033 , dust cap for nozzle, part no. - acfz14010 , safety clip, part no. - acfz12007 , sensor end assembly for zone wise, part no. - acfz23003 , expellant gas cartridge 200gm, part no. - ac501025 , fuse 5 amps, part no. - ac509066 , 3by4 hose assembly 9ft, part no. - ac506056 , hp hose assembly 2.1m long, part no. - ac506044 , 3by4 hose assly 1500mm, part no. - ac506053 , hp hose assembly 2 75 m long, part no. - ac506047 , hp hose assy. 1-1by2 inch x 3ft, part no. - ac506041 , elbow 1by2 inch - inner threaded, part no. - ac507029 , hp 1 inch hose 12ft long, part no. - ac506062 , hp1 inch hose 9ft long, part no. - ac506060
Tender For tender for supply of engine mounting fixture , installation trolley for operation , hydraulic controlpanel , fixture for charging of shock , hydraulic panel , ground support equipment , ground support equipment , case for hoses , cooling turbine plant filling with , pneumatic panel for ground , suitcase , fixture for measurement of pressure , engine internal preservation and depreservation , hydraulic installation gu 3 hsn 88