Get complete information related to latest Filming Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Filming Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Filming Tenders.
Tender For improvement of cbos lab - raised access false flooring system 300 mm height from ground with required material. , pvc wall panelling , double palla wooden door 8 feet x 7.25 feet , aluminium partition with doors and required accessories , shed on panel size 10 ft x 10 ft x 8 ft with ppgi sheet and 2 inch x 2 inch square pipe , roof shed 80 ft x 12 ft with ppgi sheet and 2 inch x 2 inch square pipe , toughened glass partition with frosted filming and required accessories.
Tender For expression of interest (eoi) for production of short films/ documentary film & for demonstration programme of all the schemes (state plan, central sponsored, oiipcra) of bhadrak district for the fy-2026-27.
Tender For bogie frame to drg. no. (a) icf/mrvc/d-0-3-001, alt "n", col-ii (or) (b) icf/mrvc/d/bt-0-3-001, alt "c", col -ii along with damper fixing bracket to drg. no. (339)ac/dcemu/d6-0-1-602,col.i - 4 nos andbolt complete to drg. no. emu/m/3ph-0-2-002, alt "c", col.i - 16 sets bogie frame to be supplied without nylon bushes where ever applicable and shall confirm to rdso/specn.c-9202, rev-2 or latest. the firm shall fulfil the requiremnt as per icf/md/specn/147, issue status 01, rev-02 with amendment no- 02. special condition : - suppliers commitment will be there to supply as per drawing -(a) ( for dash pot arrangement ) or as per new drawing - (b) ( for adoption of conical spring ). - one month notice willbe given to vendor whether he has to supply as per drawing - (a) or drawing - (b). -rate quoted will be applicable to both drawing - (a) and drawing - (b) . i) paint scheme shall be as per drawing. ii) qap to format icf/ims/md/f-31 shall be prepared along with relevant documents and kept ready for developmental/educational order. iii)firm should supply bogie frame along with the dimensional report, stress relieving report and radiography films. iv) firm should have induction/electric furnace for stress relieving of bogie frame. v) prototype inspection is applicable only for first time of developmental/educational order. vi) stage inspection to be done as below. (a) raw material stage 1. ensure the raw material used using portable spectrometer machining stage 1. dimensional checks 2. edge preparations (b)welding stage 1. weld parameter to be checked and recorded. (c) surface preparation and painting stage. 1. short/sand blast to the requirements. 2. painting process as per the specification. 3. final product inspection. [ warrantyperiod: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For corrigendum : bogie frame to drg. no. (a) icf/mrvc/d-0-3-001, alt "n", col-ii (or) (b) icf/mrvc/d/bt-0-3-001, alt "c", col -ii along with damper fixing bracket to drg. no. (339)ac/dcemu/d6-0-1-602,col.i - 4 nos andbolt complete to drg. no. emu/m/3ph-0-2-002, alt "c", col.i - 16 sets bogie frame to be supplied without nylon bushes where ever applicable and shall confirm to rdso/specn.c-9202, rev-2 or latest. the firm shall fulfil the requiremnt as per icf/md/specn/147, issue status 01, rev-02 with amendment no- 02. special condition : - suppliers commitment will be there to supply as per drawing -(a) ( for dash pot arrangement ) or as per new drawing - (b) ( for adoption of conical spring ). - one month notice willbe given to vendor whether he has to supply as per drawing - (a) or drawing - (b). -rate quoted will be applicable to both drawing - (a) and drawing - (b) . i) paint scheme shall be as per drawing. ii) qap to format icf/ims/md/f-31 shall be prepared along with relevant documents and kept ready for developmental/educational order. iii)firm should supply bogie frame along with the dimensional report, stress relieving report and radiography films. iv) firm should have induction/electric furnace for stress relieving of bogie frame. v) prototype inspection is applicable only for first time of developmental/educational order. vi) stage inspection to be done as below. (a) raw material stage 1. ensure the raw material used using portable spectrometer machining stage 1. dimensional checks 2. edge preparations (b)welding stage 1. weld parameter to be checked and recorded. (c) surface preparation and painting stage. 1. short/sand blast to the requirements. 2. painting process as per the specification. 3. final product inspection. [ warrantyperiod: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For bid to ras corrigendum : supply of toughened glass partition incl toughened sliding door with filming and required mtrl , large hanging pool table light , handing focus light , pvc false ceiling incl required material , upholstery work for sofa
Tender For corrigendum : supply of bogie frame to drg. no. (a) icf/mrvc/d-0-3-001, alt "n", col-ii (or) (b) icf/mrvc/d/bt-0-3-001, alt "c", col -ii along with damper fixing bracket to drg. no. (339)ac/dcemu/d6-0-1-602,col.i - 4 nos andbolt complete to drg. no. emu/m/3ph-0-2-002, alt "c", col.i - 16 sets bogie frame to be supplied without nylon bushes where ever applicable and shall confirm to rdso/specn.c-9202, rev-2 or latest. the firm shall fulfil the requiremnt as per icf/md/specn/147, issue status 01, rev-02 with amendment no- 02. special condition : - suppliers commitment will be there to supply as per drawing -(a) ( for dash pot arrangement ) or as per new drawing - (b) ( for adoption of conical spring ). - one month notice willbe given to vendor whether he has to supply as per drawing - (a) or drawing - (b). -rate quoted will be applicable to both drawing - (a) and drawing - (b) . i) paint scheme shall be as per drawing. ii) qap to format icf/ims/md/f-31 shall be prepared along with relevant documents and kept ready for developmental/educational order. iii)firm should supply bogie frame along with the dimensional report, stress relieving report and radiography films. iv) firm should have induction/electric furnace for stress relieving of bogie frame. v) prototype inspection is applicable only for first time of developmental/educational order. vi) stage inspection to be done as below. (a) raw material stage 1. ensure the raw material used using portable spectrometer machining stage 1. dimensional checks 2. edge preparations (b)welding stage 1. weld parameter to be checked and recorded. (c) surface preparation and painting stage. 1. short/sand blast to the requirements. 2. painting process as per the specification. 3. final product inspection. [ warrantyperiod: 30 months after the date of delivery ]
Tender For bogie frame to drg. no. (a) icf/mrvc/d-0-3-001, alt "n", col-ii (or) (b) icf/mrvc/d/bt-0-3-001, alt "c", col -ii along with damper fixing bracket to drg. no. (339)ac/dcemu/d6-0-1-602,col.i - 4 nos andbolt complete to drg. no. emu/m/3ph-0-2-002, alt "c", col.i - 16 sets bogie frame to be supplied without nylon bushes where ever applicable and shall confirm to rdso/specn.c-9202, rev-2 or latest. the firm shall fulfil the requiremnt as per icf/md/specn/147, issue status 01, rev-02 with amendment no- 02. special condition : - suppliers commitment will be there to supply as per drawing -(a) ( for dash pot arrangement ) or as per new drawing - (b) ( for adoption of conical spring ). - one month notice willbe given to vendor whether he has to supply as per drawing - (a) or drawing - (b). -rate quoted will be applicable to both drawing - (a) and drawing - (b) . i) paint scheme shall be as per drawing. ii) qap to format icf/ims/md/f-31 shall be prepared along with relevant documents and kept ready for developmental/educational order. iii)firm should supply bogie frame along with the dimensional report, stress relieving report and radiography films. iv) firm should have induction/electric furnace for stress relieving of bogie frame. v) prototype inspection is applicable only for first time of developmental/educational order. vi) stage inspection to be done as below. (a) raw material stage 1. ensure the raw material used using portable spectrometer machining stage 1. dimensional checks 2. edge preparations (b)welding stage 1. weld parameter to be checked and recorded. (c) surface preparation and painting stage. 1. short/sand blast to the requirements. 2. painting process as per the specification. 3. final product inspection. [ warrantyperiod: 30 months after the date of delivery ]