Get complete information related to latest Fire Clay Powder Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Fire Clay Powder Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Fire Clay Powder Tenders.
Tender For procurement of castable refractory fire crete n, castable refractory whytheat grade-a or its equivalent and chemical bonded plastic refractory for aoh of 210 mw abl boiler of unit no. 4, htps, korba west.
Tender For competitive e-bidding for supply refactory material for year 2025-26 - description, special fire bricks for furnace is-08 above 45% alumina as per drg., fire cement dry, fireclay morter above 45% al., fire crete castable, calcium silicate bricks 600x150x50mm, standard fire bricks, insulation bricks, fire crate castable acco set 50 super suncast make refractory 55% alumina pack in 50kg. bag suitable for heating resistance 1200 0c
Tender For corrigendum : supply of refractory material for 2x250 mw ptpp parichha - refractory supercastable alumina 68-72%, super castable refractory as per following specification:al2o3:68-72%, cao:5.2-6%, fe2o3:4.8-5.5%, max service temp:1450 c, max grain size:5mm, water required for casting:10-11%, dry density:2.50-2.65 g/cc, (after drying at 110 c/24 hrs), ccs:350-450 kg/cm2( after drying at 110 c/24 hrs) refractoriness, orton/ c plc, % (after heating at 1100 deg c/3hrs: -0.30 to +0.30) after heating at 1400 deg c/3 hrs: -1.60 to +1.70), plastic refractory as per following specification:al2o3:82.5-85.5%, fe2o3:0.50-0.85, max service temp:1700 c, max grain size:3mm, pre-8 liquid for ramming:9.7-10.7%, dry density :2.70-2.85 g/cc, (after drying at 110 c/24 hrs), ccs:260-430 kg/cm2( after drying at 110 c/24 hrs) refractoriness, orton/ c plc, % (after heating at 550 c/3hrs: -0.3 to +0.3) after heating at 815 c/3 hrs: -0.3 to +0.3)
Tender For refractory castable (size : 25 kg bag) which contains 90% alumina. make: dalmia dalcast/rhi/ calderys/ arora. firm should submit necessary c ertificate along with the material supply. [ warranty period: 12 months after the date of delivery ]