Web Analytics Made Easy - StatCounter

Fire Prevention System Tenders

Get complete information related to latest Fire Prevention System Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Fire Prevention System Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Fire Prevention System Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :40901754 Due date: 10 Jul, 202510 Jul, 2025 NA
Tender For supply of n2 injection and fire prevention system.

Central Government And Public Sector

CTN :40902437 Due date: 07 Jul, 202507 Jul, 2025 30.0 Thousand
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - office space; firefighting system; service provider

State Government

CTN :40727828 Due date: 07 Jul, 202507 Jul, 2025 2.80 Crore
Tender For corrigendum : development of integrated firefighting network system, fire extinguishers, automated water distribution system for iiit campus at sector-24 of nava raipur atal nagar, dist. raipur (cg) (1st call)

CTN :40881125 Due date: 17 Jul, 202517 Jul, 2025 NA
Tender For supply, installation and fittings of firefighting system along with related accessories for 5tph rice processing unit at hojai under apart project.

Central Government/Public Sector

CTN :40882446 Due date: 19 Jul, 202519 Jul, 2025 30.00 Lacs
Tender For repair maint and replacement of firefighting system including hydrants sprinklers pipes nozzles and allied items at ctvs and adc under ge e/m rr hosp delhi cantt-10

CTN :40893880 Due date: 07 Jul, 202507 Jul, 2025 3.16 Lacs
Tender For construction of multi-storied academic building at niepa campus, 17-b aurobindo marg, new delhi i/c water supply, sanitary installation, electrical installation, dg set, sub-station, lifts, hvac, firefighting system, fire alarm, lan and external development work (sh:- hiring of inspection vehicle for office of iitped)subwork/packages:hiring of inspection vehicle

CTN :40871626 Due date: 30 Jun, 202530 Jun, 2025 NA
Tender For repairing and servicing of firefighting equipments, fire alarm system, and painting of fire fighting ms pipes with connected allied works for auditorium & library block, jipmer campus, puducherry.subwork/packages:electrical

CTN :40864512 Due date: 17 Jul, 202517 Jul, 2025 69.74 Lacs
Tender For special repair work of 50 bedded esic hospital at c.b. ganj, bareilly (sh: fire works) : supply, installation, testing and commissioning of firefighting and fire alarm system)subwork/packages:electrical works

CTN :40663816 Due date: 04 Jul, 202504 Jul, 2025 NA
Tender For corrigendum : supply and installation of firefighting system

Central Government / Public Sector

CTN :40685457 Due date: 03 Jul, 202503 Jul, 2025 24.49 Lacs
Tender For corrigendum : custom bid for services - rpnc252027 support service for swing extruder vfd installation-shifting, foundation and installation of power transformer- 1. the power transformer is to be installed by construction of new transformer foundation, dismantling/modification of surface, providing chain link fencing on all other 4 sides, cleaning and refurbishment of bay area is in the scope of contractor only. all necessary manpower, tools & tackles, shifting machinery like hydra/crane etc shall be in the scope of contractor only. 2. shifting of power transformer of 7.2 mva onan from store to site, loading-unloading, erection, site storage are in scope of contractor. 3. the basic data sheet and ga drawing of the proposed transformer is attached in scope only. 4. the bidder if required must construct bay width, height and fire walls as per relevant is/iec/oisd standards and site conditions such that adequate clearances for maintenance shall be maintained. bidder to submit the plot plan of equipment layout of transformer layout along with the bid. the bidder shall carryout the site visit for assessment of the available installation space. the total length of the transformer bay should be such that the radiator can be accommodated on either side of transformer tank in the specified bay width. 5. all necessary earth pit provisions, & fire barriers/wall modifications, provision of new hvws water sprinklerbased firefighting system having suitable capacity for protection against the fire & explosion as per the design of supplied transformer and applicable standards & direction of eic. provision of all necessary fire protection system for transformers shall be in the scope of lstk contractor. 6. construction of oil drain facility of transformer as per is standard and hookup with existing burn oil pit. 7. the erection to be certified by contractor as per its recommended procedures which is to be submitted prior to erection. qap for erection and site commissioning shall also to be endorsed by contractor. 8. all kind of lifting, rigging work for loading-unloading, erection work including supply of hydra/ cranes, lifting rigging materials, manpower, tools and tackles as required are in scope of contractor. 9. all kind of skilled, semi-skilled, unskilled manpower as per itc of transformer requirement will be in the scope of contractor. 10. erection includes entire vacuum by proper capacity of vacuum pump, for not less than 48 hours, or more if required as per the instruction of engineer in charge. 11. first filling up of the transformer oil at site, its filtration, site testing oil sample, any refiltration required during final commissioning shall be in the scope of contractor including all tools, tackles and including oil filtration machines. oil may be supplied in drums, which should be properly sealed during transportation and storage. seal shall be verified and opened in front of iocl representative before filling in transformer. contractor should have enough storage capacity for handling oil. filling the oil from drums to the transformer through suitable capacity of high-quality filter machine and filtration of the same to get desired bdv &ppm as specified by engineer in charge and transformer manual. 12. contractor must replace all the gaskets by new ones if required by engineer in charge. 13. the contractor shall arrange nitrogen cylinder required at site for above work. 14. contractor must repaint the transformer tank with two coats of anti-rusting good finish ltbs grey shade 631 of is:5 by spray painting if required and as per the direction of engineer in charge..
 Loading, Please wait...

Connect us via What's Up