Tender For comprehensive annual maintenance contract of fireprotectionsystem and detection system at site-1 and site-2 in raiganj gmch for the year 2026-27
Tender For comprehensive annual maintenance contract of fireprotectionsystem and detection system at raiganj ssh (g plus 9), raiganj for the year 2026-27
Tender For comprehensive annual maintenance contract of fireprotectionsystem and detection system at islampur ssh (g plus 4), islampur for the year 2026-27
Tender For corrigendum : day-to-day laying, jointing, dismantling of 4-inch and 6-inch dia. ms pipelines at different coal stocks for firefighting and dust suppression at chhal ocm, secl raigarh area for a period of one year
Tender For corrigendum : repairing and fixing of water supply arrangement through 50mm ball valve, strainer and pipes to fog cannons and coal stock firefighting system from nearest pipeline at different locations for dust suppression n quenching of coal fire at kulda ocp, ba
Tender For construction of 400 bedded boys hostel building at jipmer campus, puducherry. (civil work): building portion including internal water supply line, sanitary installations, drainage, demolition of existing quarters & other development works. (electrical and mechanical installations: package c1: providing inetrnal e1, c2: providing fire alarm system, c3, providing firefighting system, c4: providing cctv, c5: providing 3 nos 13 passenger lift, c6: providing 5000 lpd solar water heater, c7: providing networking, (agreement no.32/ee(puducherry)/cpwd/2023-24) sub head: risk & cost under clause 14 for execution of masonry worl, finishing work, sanitary installations and fittings, water supply installations and fittings, drainage and water proofing work treatment on sunken flooring.subwork/packages:risk & cost under clause 14 for execution of masonry work, finishing work, sanitary installations and fittings, water supply intallations and fittings, drainage and water proofing work treatment on sunken flooring.
Tender For providing of facility management services - lumpsum based - as per scope of work; hiring of services for carrying out miscellaneous piping jobs for fireprotectionsystems and new projects; consumables to be provided by buyer
Tender For auction sale of rolling stock - coaches -scrap cond. under aged/over aged bg 8 wheeler icf/rcf coaches 15 nos without wheel sets cum trolley and r.c items .coach nos. 1] 021014 accn rcf sc scr, 2] 997328 gs scr, 3] 047404 gs sc scr, 4] 047409 wgs sc scr, 5] 037230 wgscn sc scr, 6] 997241 wgscn scr, 7] 031108 wgaccn sc scr, 8] 997636 wgscz scr, 9] 994133 wgscn scr, 10] 997431 gs scr, 11] 047028 wgfcwc sc scr, 12] 97494 gs rcf, 13] 96271 cn rcf, 14] 047609 wgscz sc scr, 15] 007217 gs scr. ds-8 nos 013328-26-00291, 00302, 00297, 00296, 00294, 00293, 00292, 00298, 00290, 00299, 00295, 00289, 00288, 00300, 00301 dt.16.04.2026. total weight of 15 coaches. 365.13998 mt approx. [fe-312.29458 mt approx, aluminium-6.7312 mt approx., stainless steel -20.5732 mt approx, copper- 0.041 mt approx, decolumns, compreg sheet, wool and limpet, berths seats and rexene -25.5 mt approx]. loc. lying on the ground 13 coaches at kzj yard and 02 coaches on track at sick line kzj. note- 1] the purchaser is instructed to remove all debris arising from cutting of the lot purchased, from the cutting/loading spot and keep the delivery spot neat and clean before the final lorry delivery, failing which, the final lorry will be stopped. 2] the purchaser is strictly instructed to stack all the rc items at one location well away from the cut-up parts of the coaches and the custodian is advised to lift the same on the day of delivery affected. [before affecting/commencing/starting of the delivery itself]. 3] the purchaser is responsible for providing adequate safety firefighting equipment on the spot at the time of cutting and delivery. the purchaser shall be liable to make good any damage/loss caused to railway property during cutting or delivery.4] railways are not responsible for any shortage.5] any reclaimable items found in excess to the below, at the time of cutting and delivery of coaches should be returned to railways 6] berths available in coaches are also part of the lot.7] it is a advised that all witnessing officials has to sign the noc at the time of closing delivery order.8] any concealed cables and items found at the time of gas cutting the same should be returned to railways.8] while loading the material cut up parts has to shift crossing two dead line tracks.8] bronze wearing pieces of all the 13 coaches which are grounded were removed and kept in the custody of custodian. in two coaches 047609 wgsz sc and 007217 gs scr they are in intact which can be seen after coach cutting.9] 13 nos coaches rc items are removed as per l no. cb and uf/stores/18ma dt.22.12.2025 and 24.12.2025. 10]sse cnw kzj to take care the rc items while cutting the coaches by the firm not to damage. 11] while loading material cutup parts has to shift crossing two dead line tracks. delivery by number basis pl no. 98111061. hsn code 72042910. available under sse cnw kzj, state tg.