Get complete information related to latest Flange Bearing Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Flange Bearing Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Flange Bearing Tenders.
Tender For corrigendum : supply of - spares for bhel make critical ht motors at cpp terminal box cover 400kw,fr:1la7566-2p, terminal connector 400kw,fr:1la7566-2p, motor cooling fan 400kw,frame:1la7566-2p, motor fan cover 400kw,frame: 1la7566-2p, brg temp detector 400kw,frame:1la7566-2p, bearing housing set 400kw,fr:1la7566-2p, de outer brg cap,400kw,6.6kv,40096a-401-, end shield set,400kw,6.6kv,40096a40121-8, terminal box cover 385kw,fr:1la7566-2p, terminal connector 385kw,fr:1la7566-2p, motor cooling fan 385kw,frame:1la7566-2p, motor fan cover 385kw,frame:1la7566-2p, mtr btd 385kw,fr:1la7566-2p,bhel, bearing housing 385kw,frame:1la7566-2p, outer brg cap,385kw,6.6kv,40096a40131-7, end shield set,385kw,6.6kv,40096a40131-8, mtr tb cvr 600kw,frame:1la7632-4,bhel, motor cooling fan 600kw,frame:1la7632-4, motor fan cover 600kw,frame:1la7632-4, brg housng 600kw,frame:1la7632-4,bhel, mtr brgcap 600kw,frame:1la7632-4,bhel, mtr es set 600kw,frame:1la7632-4,bhel, motor tb cover 2100kw,frame:1rn7632-4p, term connector 2100kw,fr:1rn7632-4p,bhel, motor fan 2100kw,frame:1rn7632-4p,bhel, motor fan cover 2100kw,frame:1rn7632-4p, motor btds de+nde 2100kw,fr:1rn7632-4p, bearing house 2100kw,fr:1rn7632-4p,bhel, bearing cap set 2100kw,frame:1rn7632-4p, end shield set 2100kw,frame:1rn7632-4p, mtr ex gkt,2.1mw,6.6kv,s.n:40096a40111-9, motor tb cover 225kw,frame:1la7502-2p, motor ter connector 225kw,fr:1la7502-2p, motor fan 225kw,frame:1la7502-2p,bhel, motor fan cover 225kw,frame:1la7502-2p, motor btd 225kw,frame:1la7502-2p,bhel, bearing housing 225kw,fr:1la750-2p,bhel, bearing cap 225kw,frame:1la7502-2p,bhel, end shield set 225kw,fr:1la7502-2p,bhel, motor tb covr 855kw,frame:1la7714-2,bhel, motor cooling fan 855kw,frame:1la7714-2, motor fan cover 855kw,frame: 1la7714-2, bearing temp detector 855kw,fr:1la7714-2, end shield set 855kw,fr:1la7714-2,bhel, t. box cover 4100kw,frame:1rn7716-4,bhel, motor cooling fan 4100kw,frame:1rn7716-4, motor fan cover 4100kw,frame:1rn7716-4, brg temp detector 4100kw,fr:1rn7716-4, end shield set 4100kw,frame:1rn7716-4, heat excr gskt set 4100kw,fr:1rn7716-4, mtr tb cvr,800kw,frame:1la7712-6,bhel, mtr tml cn 800kw,frame:1la7712-6,bhel, motor cooling fan 800kw,frame:1la7712-6, motor fan cover 800kw,frame:1la7712-6, mtr btd 800kw,frame:1la7712-6,bhel, brg housng 800kw,frame:1la7712-6,bhel, mtr brgcap 800kw,frame:1la7712-6,bhel, mtr es set 800kw,frame:1la7712-6,bhel, t.box cover 3050kw,frame:1la7905-4,bhel, terminal connector 3050kw,fr:1la7905-4, motor cooling fan 3050kw,frame:1la7905-4, motor fan cover 3050kw,frame:1la7905-4, brg temp. detector 3050kw,fr:1la7905-4, motor brg hsg set 3050kw,fr:1la7905-4, motor end shield set 3050kw,fr:1la7905-4, motor outer brg cap set 3050kw,1la7905-4, motor nde side sleeve brg assy 855kw, mtr de brg sleeve assy 855kw,1la7714-2, - quantity | 1 - msme exemption | no - startup exemption | no
Tender For corrigendum : supply of other section , m and l for two coats of synthetic enamel paint over a coat of red oxide primer on new steel surfaces width or girth exc 10 cm including preparation of surfaces all as specified and as directed. , m and l for three coats of white washing on new plaster and unplaster of wall surfaces including preparation of wall surfaces complete all as specified and as directed. , s and f steel stainer for sewage sumps of different pores as specified and directed by engineer in charge , suppy of stand by non clogging pump of 5hp 1520 lpm with all accessories and fittings as specified and directed by engr in charge , heavy duty double tank type chemical dosing system consist of service tank 150 ltrs capacity with dosing system plunger type , s and f gi strip 25x4mm as earthing lead bolts nuts checknuts and washers all as specified and directed , material and labour for earthing complete with galvanized steel plate electrodes of size 600mm x 600mm x 6mm thick , pumping out sewage water from the existing sumps of sewage plant pump house with the help of non clogging of pump any kind capacity of pump set not less than 2160 lpm , lifting the non clogging pump set electrically operated by 15hp 20 hp 3 phase motor incl column pipe line shaft etc , dismantling of non clogging submersible pump of capacity 15hp 20 hp for comprerhensive maintenance and if required taking out burnout old winding from the stator , lowering complete the non clogging pumping set and reflixing the motor carefully including connection and testing , pumping out sewage water from the existing sumps tanks of stps mbbr technology with the help of non clogging , cleaning of 1.2 mld sewage treatment plant after pumping out sewage water from the existing sumps , lifting the non clogging submersible pump set electrically operated by 3.7 hp 3 phase motor incl column pipe line , dismantling of non clogging submersible pump of capacity 3.7 hp and taking out burnout winding from the stator of motor and rewinding with pvc copper wire , dismantling of electric sewage induction motor 3.0 hp ac 3 phase 415 volts from site after disconnecting from pump , dismantling non clogging pump set of centrifugal type 3.0 hp induction motor ac 3 phase 415 volts , dismantling of electric induction blower motor 5.0 hp ac 3 phase 415 volts for comprehensive maintenance from site after disconnecting , dismantling of electric induction blower motor 30.0 hp ac 3 phase 415 volts for comprehensive maintenace from site after disconnecting from blower electric connection , material and labour for pcc 1 3 6 type c2 using 40mm graded stone aggregate for foundation etc , m and l for taking out comprehensive maintenance of existing unserviceable air blower of any make of capacity 125 cubic hr to 188 cubic hr with taking out of electric cable , supply only gear oil ep 90 complete all as specified and as directed by engineer in charge. , supply only air filter suitable for existing one complete all as specified and as directed by engineer in charge. , supply only belt as per existing model complete all as specified and as directed by engineer in charge. , supply only bearing as per existing complete all as specified and as directed by engineer in charge. , supply only set of rotor with hub as per existing model complete all as specified and as directed by engineer in charge. , m and l for finding out defect of stps panel and taking out burnt interconnection wiring including u.s and serviceable component for re use including rewiring of panel , supply and fix in repairs flexible flat pvc copper couductor stranded submersible cable cores 1100 volt grade 4 sqmm 3 bid details/ 2 / 41 core , supply and fix in repairs flexible flat pvc insulated pvc couductor stranded submersible cable cores 1100 volt grade 10 sqmm 3 core , s and f round strand steel wire rope dia 12 mm and connected clamp nut bolts fixed complete all as specified and as directed by engineer in charge. , s and f submer
Tender For corrigendum : providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; power house equipment, contract of re-babbiting and final machining of bearing bore and its torus piece and journal bearing no. 2,3,4,5 of 250mw of unit8,..
Tender For corrigendum : various routine/preventive and breakdown maintenance work on as and when require basis at chp-gtps - replacement of hammer rings for stage ii crusher , replacement of hammer rings for stage i crusher , replacement of screen plate / breaker plate/kick off plate of stage i and ii crushers , replacement of rotor of stage i crusher with disassembling of removed rotor and assembling of new/repaired rotor , replacement of drive end side bearing / pedestal of crusher rotor or complete gear coupling set of crusher or repositioning of dislocated rotor of crusher , replacement of non drive end side bearing/pedestal of crusher rotor or complete alignment of crusher motor with crusher rotor , replacement of broken hammer rings of stage i and ii crushers (stage i crusher up to 12 nos.of hammer rings and stage ii crusher up to 06 nos. of hammer rings at a time) , replacement of rail of rail table of wagon tipplers 1/2/3/4 (in one side full length) , replacement of clamping rubber pads of clamp for wagon of wagon tipplers , replacement of whole resting pads for wagon of side beam of wagon tipplers , replacement of spill plate roller of wagon tipplers , repairing/preparation/ fitting and replacement of hooks/rods/turn buckle, chain, sling rope ,spring assembly etc. of vibrating trays and crusher house trays , spillage control at various locations , miscellaneous cutting/welding work require at various locations , replacement of gearbox in conveyor no. 2a/b,11a/b,12a/b,13,14/15,16a/b,17a/b ,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of gearbox in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement of slow speed coupling set (two halves) of drive pulley , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.2a/b,11a/b,12a/b,13,14/15,16a/b,17 a/b,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement/removing/refitting of various size and type of fluid coupling , replacement or removing & refitting of any internal/bearing/input/ output oil seal of various size and type of gear box , overhauling of dismantles old/used gearbox in all respect with fitment of input and output coupling. , replacement of drive pulley , replacement of drive end side bearing of drive pulley or repositioning of dislocated drive pulley , replacement of non drive end side bearing/any side pedestal of conveyor drive/non drive pulley , alignment of motor/ gearbox/drive pulley including decouple/couple of coupling , nut bolt and drive system checking with replacement of broken nut bolt in all 04 wagon tipplers no.1/2/3/4 as per scope , lifting and releasing of gravity take up of any conveyor belt for locking and de locking of belts for other than belt replacement work , loosening and tightening of horizontal type screw take assembly of any conveyor belts for other than belt replacement work , work of dismantling and re erection of new/repaired apron pan from existing apron feeder of wagon tippler , repairing of upper/lower structure/cone plates of damaged/bend apron pan , replacement of carrying roller of apron feeder , replacement of worn out/ damaged ti roller and garland rollers. , replacement of worn out/ damaged impact rollers , replacement of worn out/ damaged return rollers , replacement of various worn out/ damaged ti roller stands , replacement of various worn out/ damaged impact roller stands , replacements of various worn out/ damaged return roller stands , replacement of various worn out skirt rubbers [10 m each] and skirt rubber with angle , preparation and replacement of guide rollers with bracket in place of worn out/ damaged gu
Tender For supply of jyoti make spares for cooling water pump for dehar power house bbmb slapper - spare 1_top shaft , spare 2_impeller shaft , spare 3_impeller_ line shaft coupling socket , spare 4_suction case , spare 5_motor coupling bolts with rubber bush and nuts , spare 6_bowl bearing bush , spare 7_discharge case bearing , spare 8_suction case bearing , spare 9_rubber bearing , spare 10_rubber bearing holder , spare 11_complete stuffing box , spare 12_gland_ gland cup , spare 13_bearing housing
Tender For supply of flangebearing model no. yar 211-203-2f of make : skf. required make : ntn,skf,dodge,r exnord,timken,fag [ warranty period: 12 months after the date of delivery ]