Web Analytics Made Easy - StatCounter

Flap Door Assembly Tenders

Get complete information related to latest Flap Door Assembly Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Flap Door Assembly Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Flap Door Assembly Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

corporations/Associations/Others

CTN :45308491 Due date: 01 Jun, 202601 Jun, 2026 42.51 Lacs
Tender For upgradation of market area and reconstruction of pedestrian path from gate no.3 to underpass at mhc, manimajra.

CTN :45336193 Due date: 02 Jul, 202602 Jul, 2026 NA
Tender For supply of flap door assembly (modified) for boxn wagon. drawing no.- rdso,s drg. no. wd-23018-s-01, alt. 2, item nos. 1,4,5,6,7,9,10 & 19 are in assembled condition. material and specification- as per drawing. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variationpermitted: max 8 lacs ] ]

CTN :45336855 Due date: 10 Jun, 202610 Jun, 2026 NA
Tender For supply of flap door assembly (modified) for boxn wagon. drawing no. : rdso,s drg. no. wd-23018-s-01, alt. 2 , item nos. 1, 4,5,6, 7, 9, 10 & 19 are in assembled condition. material and specification : as per drawing. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variationpermitted: max 8 lacs ] ]

corporations/Associations/Others

CTN :45168944 Due date: 20 May, 202620 May, 2026 42.51 Lacs
Tender For upgradation of market area and reconstruction of pedestrian path from gate no.3 to underpass at mhc, manimajra.

Central Government/Public Sector

CTN :45115387 Due date: 29 May, 202629 May, 2026 NA
Tender For 1)sbc-tk-spgr section- proposed construction of rob at lc.no50 @km:85/700-800 42m composite girder 2)proposed construction of rub at lc gate no.48 @km 81/500-600 between mallasandra and gubbi stations in aden/ypr sub division 3)sbc-tk-spgr section-proposed limited height subway at old lc43 (rub n0.297 b at km:73/000-100 near bheemasandra - rcc box of size 1x5x2.25 by rolling/ launching method 4)ypr-spgr section-proposed subway at old shettyhalli gate km 67/700-800 neat shettyhalli- (bridge no.308-d) rcc box of size 1x4x2.25 by rolling/launching method 5)provision of lifts at gbd railway station for pf-1 & pf-2&3 6)provision of two escalators (down direction) at pf-1 & pf-2&3 of kengeri railway station (pid: 14.01.53.25.3.50.008) 7)jtj-sbcsection- proposed pedestrian subways to facilitate crossing of railway alignment by cattle, pedestrians and smaller vehicles in various locations as rcc box of size 1x5mx2.65m (barrel length = 18.36 mtrs) by rolling/launching method 8)sbc-spgr section- proposed pedestrian subways to facilitate crossing of railway alignment by cattle, pedestrians and smaller vehicles in various locations as rcc box of size 1x5mx2.65m (barrel length = 18.36 mtrs) by rolling/launching method (total 11 nos) 9)ypr-ynk section- proposed pedestrain subway at sahakara nagara at km 13/200-300 near nti layout- rcc box of size 1x4x2.25 by rolling/launching method in aden/ypr sub-division 10)provision of dg sets at running rooms and crew rest rooms over sbc division 11)improvement of illumination in tunnel (600m length) near tasa at km 42/750 - 43/350 12)sbc-spgr section - proposed extension of fob at ndv station to accommodate raod-1a with stair & lift 13)implementation of investment grade energy audit (igea) recommendations at 30 locations over sbc division

corporations/Associations/Others

CTN :45051732 Due date: 08 May, 202608 May, 2026 42.51 Lacs
Tender For upgradation of market area and reconstruction of pedestrian path from gate no.3 to underpass at mhc, manimajra.

Central Government/Public Sector

CTN :44950540 Due date: 11 May, 202611 May, 2026 4.05 Crore
Tender For upgrade and augmentation of the pedestrian corridor and drainage system from d-gate to bel road gate, including the relocation of existing chain link fencing, construction of tree guards, streetlights, etc. at iisc, bangalore

State Government

CTN :44933673 Due date: 24 Apr, 202624 Apr, 2026 8.57 Lacs
Tender For repair/ renovation of pedestrian walkway from gate no.5 to chhatra chowk in pgims, rohtak

Central Government/Public Sector

CTN :44332122 Due date: 31 Mar, 202631 Mar, 2026 NA
Tender For 1)sbc-tk-spgr section- proposed construction of rob at lc.no50 @km:85/700-800 42m composite girder 2)proposed construction of rub at lc gate no.48 @km 81/500-600 between mallasandra and gubbi stations in aden/ypr sub division 3)sbc-tk-spgr section-proposed limited height subway at old lc43 (rub n0.297 b at km:73/000-100 near bheemasandra - rcc box of size 1x5x2.25 by rolling/ launching method 4)ypr-spgr section-proposed subway at old shettyhalli gate km 67/700-800 neat shettyhalli- (bridge no.308-d) rcc box of size 1x4x2.25 by rolling/launching method 5)provision of lifts at gbd railway station for pf-1 & pf-2&3 6)provision of two escalators (down direction) at pf-1 & pf-2&3 of kengeri railway station (pid: 14.01.53.25.3.50.008) 7)jtj-sbcsection- proposed pedestrian subways to facilitate crossing of railway alignment by cattle, pedestrians and smaller vehicles in various locations as rcc box of size 1x5mx2.65m (barrel length = 18.36 mtrs) by rolling/launching method 8)sbc-spgr section- proposed pedestrian subways to facilitate crossing of railway alignment by cattle, pedestrians and smaller vehicles in various locations as rcc box of size 1x5mx2.65m (barrel length = 18.36 mtrs) by rolling/launching method (total 11 nos) 9)ypr-ynk section- proposed pedestrain subway at sahakara nagara at km 13/200-300 near nti layout- rcc box of size 1x4x2.25 by rolling/launching method in aden/ypr sub-division 10)provision of dg sets at running rooms and crew rest rooms over sbc division 11)improvement of illumination in tunnel (600m length) near tasa at km 42/750 - 43/350
 Loading, Please wait...

Connect us via What's Up