Get complete information related to latest Flue Gas Duct Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Flue Gas Duct Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Flue Gas Duct Tenders.
Tender For bid to ras bid to ras corrigendum : tender for supply of feed valve spring , thrust stopper , coupling holder , top spring collar bar , plunger spring , bottom spring collar , scale shim bar , roller , lgc surrated pin bar g2 6x55 , antisplash piece , fuel pump filter , rocker arm pressure arm , o ring , o ring , o ring , hex socket countersunk flat head capscrew m6x16din7991 g8point8 , distributor disk tufftriding co , shaft , metafarm bush bp25 16 20x20 , ring oil seal , nut , ball bearing , spring , stop ring , coupling ring , dunb bushes 25 25 du , rubber ring 25x35x7 din 3760 21a7 , ball joint sfg 12 uniball , uni ball joint ss12 , washer z12u g5point6 , o ring , spring , ball bearing skf no 6308 , bearing , plug bar , o ring ann74 nse 6point5 60c7 , o ring , activator t 7471 , gasket , gasket for exh , gasket flexiket , expansion bellow , flexible joint , expansion bellow , clamping collar , outlet duct , seal housing flange , gasket , o ring , square joint , oval joint , gasket , lub oil pipe , valve air lo pipe , banjo bolt , coupling hollow screw , bs ring bsb d12 nse6point51 20a8 , non return valve assly , sping , gasket , sheathed injection pipe , bush , o ring no an24 nse 6point5 60c7 , flame arrestor , coupling pin , sealing joint , joint , amber bolt , washer , intermediate pinion , pinion on reducer , o ring , gasket , o ring , loctite , o ring for particle detecing filter , o ring , o ring an22 60c7 , spring post on drg 3 , viton oil seal 15x30x10 , o ring , retain valve rk46 dn 15 , seal joint , seal joint , indicator cock assembly , o ring , o ring , o ring 162x8 , o ring for glacier filter gf600 11 , sealing bush , set of gaskets for hyd motor mh 114a , oil pump bearing shell , gasket , oil seal , bearing bush , gasket , flex hose dn8 l 1000 , flex hose , o ring an 7 nse6point5 21a7 , anti vibration mounting
Tender For supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout fluegasducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of
Tender For supply of duct assembly air traction motor as per drawing no. dsl/ubl/tm-0517/2a for wdg4 locomotives. [ warranty period: 30 months after the date of delivery ]
Tender For supply of scavenger duct assembly (oil cooler ventilation) as per clw specification no.clw/ms/3/099 alt-8 and clw drg. no.1209-11.144.037 alt.2 or latest if any for 3-phase locos [ warranty period: 30 months after the date of delivery ]
Tender For supply of wiper blade and arm , combi switch ms harness , kit stater motor cinsisting of , brush carrier assy , brake shoe assy front and rear , main leaf with bush lh , bush king pin , hose assembly air duct
Tender For corrigendum : fabrication work d d - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout fluegasducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of sulfur f