Web Analytics Made Easy - StatCounter

Flue Gas Duct Tenders

Get complete information related to latest Flue Gas Duct Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Flue Gas Duct Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Flue Gas Duct Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :45063622 Due date: 23 May, 202623 May, 2026 NA
Tender For supply of 25vkoc005 c c - joint , main bolts , inner star , gfl bolts , gfl washer , clamping collar , clamp , valve for water pump , bush , fresh water cooler relience make , spare part kit for fw/sw heat exchanger , starting air conn.inlet , engine inlet pressure connection , governor speed setting air inlet connection , rack position limiter , fuel rack indicator , pressure transmitter p5r-4bar-4-20-1/2-pe , pitch indicator 0-20ma , pl96 , relay 4no-nc 24v dc , solenoid valve (nomo-24 vdc) , cd3 cable (5mm) , safeties reset push button , emerg. stop push button , scanner thermocouple pcb , display pcb , press.sw. (item no.17 of engraved ckt) , pressure regulator , pneu p.b. pneu return red , pneu. switch , s w engine driven pump assembly , stud m12 40 30n j12 nse1 181 , oring an7 31b6 , o ring 151i d 3d nse6.531 21a7 , filtering unit , viton oil seal 15x30x10 , fuel filter element , protect cyl head tie rod , injector body extractor , inj.pump and pump head extractor , flexible hoses , high pressure hand pump , bearing unit , bush sealing , bolt-connecting rod , o ring , thrust -stopper , top spring collar (bar) , bottom spring collar , dunb bushes 25-25 du , shaft , seal bearing housing , coupling pin , sealing joint , bs ring , type c30 , nse 6.51 , 20 , paper insert , o ring , needle roller bearing , rucompensation probe for exh. pyrometric duct , hydraulic jack for cylinder head , tool valve guide extractor , tool cylinder head test pressure , flex hose for hydraulic tool , high pressure hand pump , tee connection , safety valve , water pump impeller , scraper ring , round gasket , flexible hose for air , spare gauge glass 583 , sealing bush , piston ring , safety ring for abb vtr251-2p t/c , gfl washer , pressure switch(p 16 bars) , pressure switch(p 19 bars) , normal stop electro distributor , circuit selector , tt-314 sensor for main engine fresh water temperature , 25 pin sub d female connector , pressure gauge forbes marsh 100ss , ss316 0-4 bar glyf fil , pressure gauge forbes marsh ss316 0-40 bar glyf fil , pressure switch for s/by pp (range 0-4 bar) , pneumatic distributor pneu/pneu , sph card (sph) , lub oil pressure safety , pressure switch-1 to 10 bar , bearings individual alarm card (aip) , convertor module t454 t456 lub oil temp , svae - over speed cards , engine speed indicator 0-1250 rpm 96x96 , cock with filter , distributor iso 541 pneumatic spring , distributor iso 541 pneumatic/spring , iso1 distributor pneu.control/pneu.return , switch 3 pos. (1tc , auto , 2tc) , engine control unit (ecu) , gasket , fuel pipe m14xm14b , parallel , 750l , 9.0 i.d. , sae 100 r6 , booster servo motors with connectors , meta flex gasket , meta flex gasket , meta flex gasket , fuse 0.5a , link cable pc/tsx plc length -3mtr , oil pressure security card (sphem) , speed raise lower actuator 2no contacts , touch screen color display unit , 3 position switch , fuel pipe(return) m12x1.5 male plugxm14 x1.5 banjo(700mm) , universal crimping tool , oil mist detector , time delay relay (off delay) , pyrometric duct bank a

CTN :43859377 Due date: 06 May, 202606 May, 2026 NA
Tender For bid to ras bid to ras corrigendum : tender for supply of feed valve spring , thrust stopper , coupling holder , top spring collar bar , plunger spring , bottom spring collar , scale shim bar , roller , lgc surrated pin bar g2 6x55 , antisplash piece , fuel pump filter , rocker arm pressure arm , o ring , o ring , o ring , hex socket countersunk flat head capscrew m6x16din7991 g8point8 , distributor disk tufftriding co , shaft , metafarm bush bp25 16 20x20 , ring oil seal , nut , ball bearing , spring , stop ring , coupling ring , dunb bushes 25 25 du , rubber ring 25x35x7 din 3760 21a7 , ball joint sfg 12 uniball , uni ball joint ss12 , washer z12u g5point6 , o ring , spring , ball bearing skf no 6308 , bearing , plug bar , o ring ann74 nse 6point5 60c7 , o ring , activator t 7471 , gasket , gasket for exh , gasket flexiket , expansion bellow , flexible joint , expansion bellow , clamping collar , outlet duct , seal housing flange , gasket , o ring , square joint , oval joint , gasket , lub oil pipe , valve air lo pipe , banjo bolt , coupling hollow screw , bs ring bsb d12 nse6point51 20a8 , non return valve assly , sping , gasket , sheathed injection pipe , bush , o ring no an24 nse 6point5 60c7 , flame arrestor , coupling pin , sealing joint , joint , amber bolt , washer , intermediate pinion , pinion on reducer , o ring , gasket , o ring , loctite , o ring for particle detecing filter , o ring , o ring an22 60c7 , spring post on drg 3 , viton oil seal 15x30x10 , o ring , retain valve rk46 dn 15 , seal joint , seal joint , indicator cock assembly , o ring , o ring , o ring 162x8 , o ring for glacier filter gf600 11 , sealing bush , set of gaskets for hyd motor mh 114a , oil pump bearing shell , gasket , oil seal , bearing bush , gasket , flex hose dn8 l 1000 , flex hose , o ring an 7 nse6point5 21a7 , anti vibration mounting

CTN :45057581 Due date: 16 May, 202616 May, 2026 9.50 Lacs
Tender For supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of

Central Government / Public Sector

CTN :45056724 Due date: 22 May, 202622 May, 2026 NA
Tender For supply of duct assembly air traction motor as per drawing no. dsl/ubl/tm-0517/2a for wdg4 locomotives. [ warranty period: 30 months after the date of delivery ]

CTN :44823266 Due date: 07 May, 202607 May, 2026 NA
Tender For corrigendum : tender for supply of bush (bar) , assembly valve gear , rocker cover with o ring(w/o inj.cooler) , copper washer 8x22x1.5 , adjusting screw(bar) , metafram bush bp25-16/20x20 , oil seal 25x42x8 , exhaust manifold(lag) , sheathed injection pipe , stud m12-40/30n j12 nse1.181 , oring an7 , 31b6 , mb 40x30 bearing bush , o ring 151i.d.3d nse6.531 21a7 , set of gaskets for pd filter , sealing ring , pin , fuel filter element , bush bearing , sealing bush , piston ring(p3712) , ring saftey , bush , cap , locating pin , lgc pin (bar)lgc g5 8x30 , plut , cam shaft plug , roller bearing 110 60 22 , loctite 641 , con rod small end bush , piston pin , chrome plated piston ring , compression ring , cyl.liner (light fuel) assy , pin roller , roller , rocking arm assembly , snap ring , ring nse6.531 21a7no ms 229 , washer , stud , exhaust valve seat , outside spring , tappet , plug , valve rockers assly , sealing product glue 1005l , copper washer 8x22x1.5 , piston ring , needle , coupling-holder , o ring , shaft , nut , ball bearing skf6307 , ball bearing , bearing , cyclam seal , bs ring , lipped seal , expansion bellow , o ring , pump tappet lo pipe , lub oil pipe , valve air lo pipe , coupling hollow screw , gasket , joint , flame arrestor , sealing joint , washer , pinion on reducer , bs ring , type c30 , nse 6.51 , 20 , loctite , filter ing element for particle detecting filt , o ring , indicator cock assembly , adaptor , fuel feed pump ccw tg0s , set of gaskets for fuel feed pump , set of oil seals for fuel feed pump , rucompensation probe for exh. pyrometric duct , flex hose for hydraulic tool , flexible hose for breather , pressure switch , overspeed air solenoid valve (241 no 24v)

CTN :45021687 Due date: 22 May, 202622 May, 2026 NA
Tender For supply of supply, installation and commissioning of rig inlet duct assembly

Central Government / Public Sector

CTN :45037584 Due date: 20 May, 202620 May, 2026 NA
Tender For supply of scavenger duct assembly (oil cooler ventilation) as per clw specification no.clw/ms/3/099 alt-8 and clw drg. no.1209-11.144.037 alt.2 or latest if any for 3-phase locos [ warranty period: 30 months after the date of delivery ]

CTN :44005646 Due date: 30 Apr, 202630 Apr, 2026 NA
Tender For bid to ras supply of lv2icvs 765-12-402 shaft left , lv2icvs 765-22sb-112 sarvo booster cylinders , lv1r90 184.04.017sb 3rd rh shield , lv1r72 gost 11371.78 washer 4.01.016 , lv1r72 gost 6958.78 oversize washer 6.01.016 , lv1r72 172.04.127sb duct screening , lv2icvs 4710720408004 765-08-sb473 pipe assembly 765-08- sb473 , lv2icvs 5365720138513 700-37-205 plug screwed

CTN :44993444 Due date: 04 May, 202604 May, 2026 NA
Tender For supply of wiper blade and arm , combi switch ms harness , kit stater motor cinsisting of , brush carrier assy , brake shoe assy front and rear , main leaf with bush lh , bush king pin , hose assembly air duct

CTN :44757118 Due date: 27 Apr, 202627 Apr, 2026 9.00 Lacs
Tender For corrigendum : fabrication work d d - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of sulfur f
 Loading, Please wait...

Connect us via What's Up