Get complete information related to latest Foot Stand Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Foot Stand Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Foot Stand Tenders.
Tender For supply and installation of multifunction gym machines as per enclosed specification. qty. -01 set. , football drg:football (standard size) make brand-nivia. ,
Tender For corrigendum : supply of dee shackle of swl 1.0 tonne , dee shackle of swl2.0 tonne , dee shackle of swl 4.0 tonne , dee shackle of swl 5.0 tonne , dee shackle of swl 10.0 tonne , dee shackle of swl 8.0 tonne
Tender For corrigendum : tender for supply of lifting device wire rope load shackle dee shackle m -lifting device , wire rope sling with eye bolt , wire rope sling eye bolt , load shackle kun 693.10-m24 , load shackle kun 693.10-m30 , dee shackle
Tender For polyster multi leg (4 legged) sling of swl 2 tons capacity. each leg made of duplex flat webbing sling with eye loop at both end of 2 ton capacity (code: sdw2000) fully covered and stitched with anti abrasive sleeve except eye loop. one end of each leg will be fitted with a common "o" ring (+/- 25 mm x 135 mm id) along with 2 number of intermediate ring of 2 ton capacity and other individual end of each leg fitted with 800 mm long metal chain (chain link size: 14mm x 40 mm x 100 mm) along with a dee shackle will be fitted in extreme end of each leg. length of each leg: 3.8 mtrs. ( 3 mtr polyster sling + 0.8 mtr metal chain) excluding 'o' ring along with intermediate ring & dee shackle. slings conform to specifications: american standards- ansi/asme b30-9. load test certificate from the manufacturer must be provided along with the supply. [ warranty period: 30 months after the date of delivery ]
Tender For supply of dee shackle assembled with connection pin and locking washer dia 30mm toclw drg no 06/3/10/4 ref-2 & ref-3 and clw spec no. clw/ac/112. [ warranty period: 30 months after the date of delivery ]