Get complete information related to latest Freezol 15 Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Freezol 15 Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Freezol 15 Tenders.
Tender For nctps i se mi circle aoh 25 26 tm dn unit i ii iii overhauling of turbine lube oil coolers and cleaning of main oil tank during annual overhaul works of turbine for the year 2025 26
Tender For bid to ras bid to ras bid to ras corrigendum : tender for supply of contontrol valves - gland steam inlet control valve , gland steam dump control valve , dearator steam control valve , turbine exhaust hood spray cv , vacuum breakar control valve , lube oil temperature control valve , feed water control valve , auxiliary steam control valve , hp heater-2 level control valve-1 , hp heater-2 level control valve-2 , hp heater-1 level control valve-1 , hp heater-1 level control valve-2 , lp heater level control valve , control valves spares
Tender For -e-tender forcomprehensive repair of worm gear assembly in turbine oil filtration plant with supporting works including pump installation, oil seal fabrication, and valve overhaul at andhra power house, hpsebl, chirgaon.
Tender For re babbiting-dismantling of bearings and pads from housing,rebabbiting of 10 nos tgb thrust pad along with all accessories,rebabbiting of turbine guide bearing, mid bearing & end bearing along with floating seals and all accessories,material composite test, ut test and dp test should be done for re-babbitted material,assembly of re-babbited bearings with blue match,submitting the video graphs of re-babbiting and reports of re-babbiting.re-alignment-the reason for shifting of generator shaft by 2 to 3 mm shall be analyzed and rectification works needs to be carried out,complete dismantling, assembling, painting and re-alignment of machine shaft,inspection of turbine shaft journal surface and repairs if required,inspection/replacement of worn out bushes and seals of guide vane, if necessary,inspection and repair of labyrinth ring, face plates, guide vanes and runner,guide vanes bed setting,tgb water cooler descaling work to improve the efficiency of cooler,complete assembly of machine,checking the magnetic axis of the generator and to ensure its alignment, checking of the unit leveling at all places and complete alignment of machine shaft,testing & commissioning of complete machine,painting of entire machine,checking of vibration & site balancing of machine,submission of vibration, balancing & alignment reports.flow switch-supply and installation of flow switch (flow rate110 lpm) along with 01 no 01 nc contact for inlet and outlet lubrication oil pipelines,supply and installation of pressure switch (30bar) for inlet and outlet lubrication oil pipelines,supply and installation of level switch for in tgb oil sump.replacement of new miv trunion shaft-dismantling of miv counter weight, miv servomotor assembly, and other related parts,lifting of miv from the bed,transportation of miv to the firms place, if required,replacing old nitrile rubber trunnion seals with existing profile by new one on both sides,replacements of miv trunnion shaft. providing of necessary drawings,material composite test, ut test and dp test should be done for new trunnion shaft & trunnion seals, bushes etc,all related fasteners and dowel pin to be replacing by new one,drive and non drive end trunnion bush, cupseals, stop end plate, washer ring etc need to be replacing by new one,repair of miv discand main body to be attended, if required,supply and replacement of miv disc rubber seal,pressure testing and commissioning should be carried out as per standard in presence of kpcl engineers,all tools & tackles required for the above mentioned works shall be arranged by contactor only.
Tender For nctps ii - m ii circle - turbine maintenance division sub dn. i - unit - ii - cleaning of main oil tank, oil centrifuges, duplex filters its accessories, control fluid oil tank pit, main oil tank pit, ip control valve pit and overhauling of alfa laval oil centrifuges in main turbine lube oil system, overhauling of inlet & outlet water line valves of mot cooler and overhauling/replacement of wafer type butterfly valves & nrvs in main turbine lube oil tank vapour exhaust lines, pedestal vapour exhaust line, gland steam outlet lines, control fluid tank vapour exhaust including the cost of consumables & t&ps during the unit-ii aoh of the year 25-26.