Get complete information related to latest Fuel Oil Gauge Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Fuel Oil Gauge Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Fuel Oil Gauge Tenders.
Tender For supply of instrument spare and annual maintenance contract - circular charts:- i) cc-200 (fc-261)range 0-100, ii) 9/d/179/fc-241, range 0-600, iii) 9/d/147/s-8963, range 0-150, iv) 9/d/112/s-3452, range 0-30, disposable pen (red), temperature gauge dial size 6" (h guru) heavy duty with test certificate (mercury filed) :- i) range 0-150 c streight steam 6", ii) range- 0-150 c capillary type (3 meter) bulb length 10" copper/pvc, iii)range 0-300 c streight steam 6", iv) range 0-500 c streight steam 6", vacuum gauge dial size 6" range- 0-30 inch of hg/760 mm bottom feed connection 3/8" bsp, h guru heavy duty with test certificate., pressure gauge dial size 6" bottom feed connection size 3/8" or 1/2" bsp, h guru heavy duty with test certificate :- i) range 0-15 psi 01 kg/cm , ii) range 0-30 psi 02 kg/cm , iii) range 0-60 psi 04 kg/cm , iv) range 0-150 psi 10 kg/cm , v) range 0-300 psi 21 kg/cm , vi) range 0-1030 psi 42 kg/cm /70 kg/cm , pressure gauge, dial size 10" bottom feed connection size 1/2" bsp heavy duty with test certificate:- i) range 0-60 kg/cm h. guru with test certificate, ii) range 0-2 kg/cm2 h. guru with test certificate, pressure gauge for turbines heavy duty with test certificate:- i) 4" dial size side back connection %" bsp range 0-2 kg/cm , ii) 4" dial size side back connection %" bsp range 0-4 kg/cm , iii) 4" dial size side back connection %" bsp range 0-7 kg/cm , iv) 4" dial size side back connection %" bsp range 0-10 kg/cm , teflon coated compensating cable 2 core j type, compensating cable fg/ss 2-core k type, 4 digit digital temperature indicator j & k typ , thermocouple sensor heavy duty:- i. 12" x 8 mm j/k type, ii. 8" x 8 mm j/ k type, iii. 6" x 6 mm j/k type, oil pocket ss 12", 6 digit digital event counter, proximity switch (magnetic sensor) pnp-nc sensing 8 mm,voltage 5-35 vdc, max load 300 ma, on/off pneumatic control valve flange type size- 1" to operate at air pressure 60-80 psi suitable for 20 kg/cm line pressure, on/off solenoid valve for pneumatic valve:- a) air filter " line size female thread, b) air filter with air regulator size 4", digital temperature controller (pid) j & k type, digital tachometer range 0-10000 rpm, 96 x 96 with magnetic sensor., steam flow indicator cum totalizer, drum level controller 4-20 ma input/output model no. 5296at (massibus make), dp transmitter 4-20 ma for boiler drum level, honybell make, positioner for drum level control valve, stroke counter for molasses tank, jumbo digital display with sensor, for juice and water tank, current and previous display size 4" x 4"., ma & mv source meter for temp. indicator calibration, pressure transmiter model tsc 01, range 0 to 40 bar, output 04-20 ma, accuracy 0.25% fs, pressure transmiter model ks-e-e-e b02u-m-v, range 0 to 2 bar, output 04-20 ma, supply 9-32 vdc, port g1/4e, syphon pipe s.s. 304 :- (i) u type, (ii) q type, pressure gauge, model en837-1, ss-316, dail size 6", bottom feed connection size 1/2" bsp, heavy duty with test certificate (tempsens make) :- i) range 0-6 kg/cm , ii) range 0-10 kg/cm , iii) range 0-21 kg/cm , iv) range 0-42 kg/cm , pid controller, size 96 96, model no. dc 1040, make honey bell, pressure recorder range, h-guru make, with test certificate (heany duty) with pipe stand mounted ", socket- ", size 10" :- (i) 0-1 kg./cm2, (ii) 0-2 kg./cm2, (iii) 0-10 kg./cm2, orifice with assembly (nipple), inlet pressure 21 kg/cm , outlet pressure 21 kg/cm , inlet temp. 350 c, outlet temp. 350 c, line size 4", drum level transmitter, range 400 to 400 in h2o, (make- honey bell), steam pressure transmitter, range 14.7 to 3000 psi, (make- honey bell), hade mounted thermocouple, length 450 mm, k-type duplex type, with test certificate (heany duty), signal isolator singal input 4-20ma, double output 4-20ma, repair & calibration work with amc super-heated wash water temp. controlling system- 01 no., d-super heated exhaust steam temp. controlling system- 01 no., temperature control system of transit
Tender For corrigendum : supply of boiler steam drum direct water gauge spare for cpp at bpcl bina refinery : : - repair port assy boiler drum level gauge , retaining ring boiler drum level gauge 7 , flat washer f boiler drum level gauge 8 , cover plate f boiler drum level gauge 10 , cap screw f boiler drum level gauge 12
Tender For the detail of works includes:a. the tenderer shall carryout the following works during annual maintenance contract period along with the servicing of the diesel generator set.1. general checkup & preventive maintenance and to fill up preventive checkup schedule as follows:a) check lube oil level and conditioning of lube oil, top up/refill if required.b) the oil filters shall be replaced whenever oil is changed.c) the air filters shall be cleaned periodically with compressed air, check batteries and top up the distilled water if required.d) check functioning of changing alternator.e) engine safety viz. high water temperature gauge, oil temperature gauge and high speed gauge shall be checked for their functions and repaired/replaced if required.f) coolant level and conditioning of coolant shall be checked and refilled if required.g) check fan and alternator drive belts and tightened if required.h) the governor shall be checked and tuned for proper functioning.i) check for leaks if any and shall be rectified.j) check reports shall be submitted every month/every breakdown calls.2. checking and servicing of engine for smooth running, its unusual sound and color of smoke and exhaust and set it right in case of deviations.3. checking and repairing and leakage of fuel, lubricating oil and coolant.4. cleaning and changing of air filters as per requirement.5. setting of valves tappets whenever required.6. checking and repairing of accessories drive, turbo charger and crankshaft endplay whenever required.7. checking of alignment of engine & alternator as per requirement.8. checking of throttle control and its setting.9. checking of instrument panel including replacement as and when required.10. checking of rotating diodes assembly in brushless alternator including replacement as and when required.11. checking of wiring system and repairing/replacement as and when required.12. repair and maintenance of relays including contractors in control panel.13. checking of battery terminal and de-sulphating.14. diagnosis of faults in engine and alternator and its rectification.15. breakdown calls to be attended on priority within 6 hrs.16. providing spare avrs, self-starter and accessories, free of charge, if the repair/overhaul/replacement is expected to be taken in more than two days.17. checking/repair/adjustment/replacement/servicing shall be carried under annual maintenance contract except cost of component/parts to be replaced due to wear & tear.18. the firm should undertake to arrange genuine spares of the diesel engine, alternator and amf panel as and when required within two working days.19. the tenderer’s service engineer shall visit the site for attending the generator sets not less than twelve times during the contract period (minimum once in a month) and shall inspect the generator set thoroughly. each visit shall take place during 1st week of each month.20. the tenderer’s service engineer shall visit once in two month for checking of electrical side viz. alternator, amf control panel, if any.21. the engine shall be run on no load or at available load, and should be checked for any leakage and abnormal noise. if any such abnormality noticed shall be diagnosed and remedial action shall be taken.22. standard check list:a) replace minor parts (i.e hoses and filters etc) sub-assemblies as and when required.b) service engineers during the visit will report on the performance or any other abnormality and inform parts requirement. he shall also submit the report on work done and recommendations as well as spare parts required.c) attend emergency call on priority (usually same day). however, if the engineer is required or any particular date and time, it would be the responsibility of the customer to intimate the contractor in advance.d) major overhauling/ top overhauling / pt pump & injector calibration /replacement of major parts/ rewinding of alternator or repairs or breakdown of the diesel generator set are to be charge