Web Analytics Made Easy - StatCounter

Furnace Transformer Tenders

Get complete information related to latest Furnace Transformer Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Furnace Transformer Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Furnace Transformer Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :45302300 Due date: 16 Jun, 202616 Jun, 2026 NA
Tender For work of electrical & pneumatic actuators overhauling and fabrication of new y piece of various service of furnace flue gas path for unit 3 on as & when required.

State Government

CTN :45161104 Due date: 04 Jun, 202604 Jun, 2026 4.50 Lacs
Tender For supply of electrical and lpg gas plant materials - led bulb 18 watt , led bulb 80 watts, , led bulb 65 watts, , bulb holder, , copper wire 1.5 mm, , copper wire 2.5 mm, , copper wire 4mm, , copper wire 5mm, , multi wire, , feggival wire bundle, , electrical fitting pipe (pvc 0.5"), , electrical fitting pipe (pvc 1"), , electrical fitting pipe (pvc 1.5"), , switch, , power plug, , power pin, , tape roll, , led tube light complete, , inverter bulb 10 watts, , inverter bulb 20 watts, , ceiling fan, , ceiling fan regulator, , ceiling fan condenser, , wall fan medium size, , exhaust fan 09 inch, , exhaust fan 12 inch, , fan winding, , watch cell, , pliers, , tester, , 7 hp motor winding, , needle valve half inch 3/8", , furnace burner t-78, , chapati burner (r-v-3), , copper hose 01 ft, , copper hose 01-1/2 ft, , rubber hose, , regulator, , bering greece, , mill lease, , millstones

Central Government/Public Sector

CTN :45283525 Due date: 08 Jun, 202608 Jun, 2026 NA
Tender For complete repair & rewinding of 01no. deffective 33kv,40mva ngef make furnace transformer

CTN :45209307 Due date: 08 Jun, 202608 Jun, 2026 NA
Tender For 1.complete erection, installation & testing of overhead png pipeline from drs (iocl) to nf, df, sand plant, tube stand & riser cutting station at rwp/bela. 2.design, supply, installation and commissioning of gas trains, valves, pipes and associated components to create standby arrangement for piped natural gas set (png) at rwp/bela as per scope of work (annexure-a & b) to achieve heating cycle of normalizing furnace (nf) & draw furnace (df).

Central Government/Public Sector

CTN :45292060 Due date: 12 Jun, 202612 Jun, 2026 NA
Tender For supply of points for first year , calibration of glueing m c 8930 by 3 sensor 3 cal points for first year , calibration of vul kettle 8760 by 3 sensor 3 cal points for first year , calibration of hot swaging m c plant no 6229 by 1 sensor 3 cal points for first year , calibration of salt peter n 5 by 3 sensor 3 cal points for first year , calibration of temp gauge by 1 sensor 3 cal points for first year , calibration of gas nitric 35 by 1 sensor 3 cal points for first year , calibration of air circulation by 3 sensor 3 cal pointsfor first year , calibration of high frequency 41 by 1 sensor 3 cal points for first year , calibration of digital graph recorder 1 16 ch without sensor by simulatrion 3 cal points for first year , calibration of hot swill n2 by 1 sensor 3 cal points for first year , calibration of anodising e6 by 1 sensor 1 cal points for first year , calibration of auto film proce 6768 by 1 sensor 3 cal points for first year , calibration of hot air blower 70 by 3 sensor 3 cal points for first year , calibration of hot water anodizing 20 by 1 sensor 3 cal points for first year , calibration of temp control of hot water 02 by 1 sensor 3 cal points for first year , calibration of digital temp. gauge with rtd sensor by 1 sensor 3 cal points for first year , calibration of tvc trolly by 3 sensor 3 cal points for first year , calibration of industrial freezer by 1 sensor 3 cal points for first year , calibration of industrial freezer 2019-14 by 1 sensor 3 cal points for first year , calibration of thermo lab 3c36 and 2c temp and rh measurement by 1 sensor 3 cal points for first year , calibration of oscilation disc rpm measurment for first year , calibration of grese drop point tester 538 1110 by 1 sensor 3 cal points for first year , calibration of quv by 1 sensor 3 cal points for first year , calibration of hot air dryer d1 and d2 by 1 sensor 3 cal points for first year , calibration of hot water cleaning station by 1 sensor 3 cal points for first year , calibration of temp clock for first year , calibration of ir gun up to 500 dec c for first year , calibration of furnace range upto 500 deg c by 1 sensor 3 cal points for second year , calibration of furnace range upto 500 deg c by 3 sensor 3 cal points for second year , calibration of furnace range upto 1250 deg c by 1 sensor 3 cal points for second year , calibration of furnace range upto 1250 deg c by 3 sensor 3 cal points for second year , calibration of furnace range upto 1250 deg c by 6 sensor 3 cal points for second year , calibration of bath range upto 400 deg c by 1 sensor 3 cal points for second year , calibration of bath range upto 400 deg c by 3 sensor 3 cal points for second year , calibration of bath range upto 400 deg c by 6 sensor 3 cal points for second year , calibration of thermometer range upto 100 deg c 3 cal points for second year , calibration of tank range by 1 sensor 3 cal points for second year , calibration of tank range by 3 sensor 3 cal points for second year , calibration of oven range upto 350 deg c by 1 sensor 3 cal points for second year , calibration of oven range upto 350 deg c by 3 sensor 3 cal points for second year , calibration of oven range upto 350 deg c by 6 sensor 3 cal points for second year , calibration of themohygrometer 3 cal points for second year , calibration of hydraulic press range upto 180 deg c by 1 sensor 3 cal points for second year , calibration of hydraulic press range upto 180 deg c by 3 sensor 3 cal points for second year , calibration of chambers furnace range upto 200 deg c by 1 sensor 3 cal points for second year , calibration of chambers furnace range upto 200 deg c by 3 sensor 3 cal points for second year , calibration of //bid details 2 / 81 chambers furnace range upto 200 deg c by 6 sensor 3 cal points for second year , calibration of auto film proce 6760 by 1 sensor 3 cal points for second year , calibration of extrasion mc 6580 by 1 sensor 3 cal points for second year , calibration of spot vulcanising

CTN :45295697 Due date: 15 Jun, 202615 Jun, 2026 NA
Tender For procurement of high temperature tube furnace with vacuum and controlled gas flow facilities

CTN :45057581 Due date: 27 May, 202627 May, 2026 9.50 Lacs
Tender For corrigendum : supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bot

State Government

CTN :44943510 Due date: 01 Jun, 202601 Jun, 2026 22.54 Crore
Tender For corrigendum : tender for the supply of various equipments required for upgradation of district food laborartory, karnal - bottle dispenser, deep freezer -20°, 400 l, deep freezer -40°c, capacity 400 l, abbe, refractometer, automated solid, phase extraction, system, electro magnetic, sieve shaker, solvent filtration, unit, automatic, glassware, washers and, dryers, rotary evaporator, with chiller, homogenizer, ultra sonic bath, digital butyro, refractometer, analytical balance, (0.0001 gram, (accuracy), hot air oven, polarimeter, ph meter, muffle furnace, vacuum oven, deep freezer -80°c, micro balance, refrigerator 700 l, (double door &, frost free), water purification, system, inductively coupled, plasma – mass, spectrometer (icpms), microwave digestor, gas chromatography, with tandem mass, spectrometry (gcmsms), lc-ms/ms, ics aquion - specs, ultra performance, liquid, chromatography, (uplc) with photo, diode array, (pda),fluorescence, (fld) and, refractive index, detector(rid)

State Government

CTN :45263804 Due date: 03 Jun, 202603 Jun, 2026 4.63 Crore
Tender For tender for the supply of various equipments - muffle furnace, "al2o3 sample plate, al2o3 furnace door block, protection glove, crucible clip, crucibles, karl fischer titrator, "titration vessel, detector electrode with lead, generator electrode (with frit) with lead, desiccant tube and cap, injection septa (pack of 10), gas tight syringe 1.0ml , luer needle 17-gauge, dust cover, results manager software, main power pack, fuse, karl fischer titration reagent(s), nist calibration standard, refrigerated centrifuge (bench top), bottles/falcon tubes/adapters for 0.2ml tubes, one set of other items (adapters) required for improving the applicability/system performance should to be quoted, nitrogen evaporator, evaporation tubes, gas fuse , water purification system including water softner, cartridges, filters etc. for , bomb calorimeter, "ignition wire, cotton thread, combustion crucible, bomb, nist certified benzoic for calibration, any other accessories required for analysis of food samples., gas chromatograph with ecd, tcd, fid with autosampler, "pesticide column (30 m x 0.250mm x 0.25m (5ms (95% dimethyl-, 5% diphenyl-polysiloxane / 1ms (100% dimethyl polysiloxane or equivalent) 100 mm column for fatty acid profiling with main concern of trans fatty acid application, column for cholesterol application, stationary phase: 95% dimethyl-, 5% diphenyl-polysiloxane (30 m x 0.250mm x 0.25m),, "vial sets (1, 2 ml, crimp type, amber and clear glass), vials (10, 20ml crimp type with cap & septa), 300/500 l recovery vials, septa ptfe/silicone (for 1, 2 ml vials), septa ptfe/silicone (for 10, 20 ml headspace vials), ergonomic crimping tools for different vial types, ergonomic decapping tools for different vial types, head space vials 10,20 ml capacity, suitable syringes for quoted autosampler, suitable headspace syringe /valve/loop, quechers kits for pesticides and herbicides in following matrices:, matrices with high fat, matrices with high water content, matrices with high pigmented, spe cartridges for water., ultra performance liquid chromatography (uplc) with photodiode array (pda), fluorescence (fld) and refractive index detector (rid), sample vials with 1.5 ml or greater, stainless steel ultra sonic bath with the capacity of 5 l or more, with time setting (min) 1-30min or continuous operation with led and push button (should be ip 33 protection class) for sonication of spare parts as well as solvents, fittings, frits, ferules and tubings, tubing cutter, solvent bottles (1000 ml capacity), solvent filters (glass & ss both, compatible manual syringes -10 l, 20 l, 50 l, standards for hplc calibration for pda, ri and fluorescence detector, consumables required for each detector must be provided., "hplc columns: one each of, c8 = 250 4.6 5m c18 = 250 4.6 5m, cyano = 250 4.6 5m. amino = 250 4.6 5m, phenyl = 250 4.6 5m. silica = 250 4.6 5m., all columns must be supplied with respective guard column and holder. ", uv-visible spectrophotometer, ",0.5, 1 and 3-ml quartz cuvettes 10 mm path length, 0.5, 1, and 3 ml glass cuvettes 10 mm path length, cuvette holder, suitable certified standards for validation including holmium oxide glass filters for wavelength calibration & nist traceable, nist traceable potassium dichromate., uv-visible spectrophotometer, ",0.5, 1 and 3-ml quartz cuvettes 10 mm path length, 0.5, 1, and 3 ml glass cuvettes 10 mm path length, cuvette holder, suitable certified standards for validation including holmium oxide glass filters for wavelength calibration & nist traceable, nist traceable potassium dichromate., ft-ir with atr & liquid cell, " hydraulic press with kbr die and pellet holder, suitable mortar pestle (dia 5-6 cm), suitable portable de humidifier to maintain 30- 60% rh, temperature and relative humidity digital indicator with calibration certificate from iso 17025 accredited lab., reference nist standard polystyrene film (0.3 mm) over the range of 3800 cm-1 to 650 cm-1., abbes refractometer,

Central Government/Public Sector

CTN :45239094 Due date: 28 May, 202628 May, 2026 NA
Tender For providing of custom bid for services - re-tuning of 10t lpg furnace system in building 50 to natural gas application at bhel, trichy
 Loading, Please wait...

Connect us via What's Up