Get complete information related to latest Gangway Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Gangway Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Gangway Tenders.
Tender For supply of gangway bridge mounting assembly as per alstom drg. no.1.10113.0.24.120.001.alt 'br' with bridge sheet to drg no 2 10113.0.24.120.101 alt-ar1 material & spec: aisi-304 [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variationpermitted: max 8 lacs ] ]
Tender For supply of vestibule bellow top complete for gangway of lhb type coaches as per icf drg. no.lwsczac-2-5-005, alt.nil with set of bellow securing fasteners to item nos.8, 9 &10 (qty-09 set) conforming to assy.drg.no.lwsczac-2-5-002 alt.f. note: a) packing condition: covered in transparent polythene and packed in suitable length wooden case as shown in icf drg.no.icf/sk-2-5-090. b) material conforming to rdso spec.no.rdso/2007/cg-05(rev.1). [ warranty period: 60 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For supply of minor overhaul kits of floor system - train 18 gangway (kit detail - annexure a) as per dellner part no. 1166041-oh-kit [ warranty period: 30 months after the date of delivery ] ]
Tender For providing of custom bid for services - mod and inst work in sinter dispatch series; modification and installation works in sinter dispatch series of sp-ii 1.modification of drive platform for conveyors c-74, c-75 and c-76 dismantling of the existing drive system platform and associated structures of conveyors c-74 and c-75 in the sinter dispatch series of sp-ii. decoupling and removal of the existing gearbox and motor drive assemblies of c-74 and c-75. dismantling of the existing drive stools and platform base structures. fabrication of new drive stools and drive platform for installation of motor and gearbox as per drawing. erection and installation of the newly fabricated stool and drive platform, followed by mounting and alignment of the new motor and gearbox assemblies. for conveyor c-76, the scope includes: decoupling and removal of the existing motor. dismantling of the existing motor stool. fabrication of a new motor stool as per drawing. installation and alignment of the new stool and motor, followed by proper coupling. 2.fabrication and installation of plough feeder for conveyor c-72 fabrication and installation of a new plough feeder on conveyor c-72 for diversion of sinter material to the sinter ground storage yard. the plough feeder shall be fabricated and installed as per drawing and site instructions, including all necessary structural supports, fittings, and alignment. the above-mentioned works will be considered and measured as one (01) activity unit. labour,service & like charges % : 100.00 supply comp % : 0.00
Tender For supply of intercar gangway mounting. rcf's drawing no. 1 10113.0.24.100.001, alt. no.-r2, without item no. 4. material & specification: as per drawing and conforming to rdso's specification no. rdso/2007/cg-05. rev.1 of sept 2018. [ warranty period: 60 months after the date of delivery ] ]
Tender For corrigendum : supply of intercar gangway mounting. rcf's drawing no. 1 10113.0.24.100.001, alt. no.-r2, without item no. 4. material & specification: as per drawing and conforming to rdso's specification no. rdso/2007/cg-05. rev.1 of sept 2018. [ warranty period: 60 months after the date of delivery ] ]
Tender For supply of led light fitting for corridor, doorway, gangway, passenger area (cabin) of non ac lhbcoaches, type b-1,9 watts confirming to rdso spec. no. rdso/pe/spec/ tl/0091- 2016 (rev.1) rcfannexure 1,2& 3 & rcf drg.no.cc76453. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of inter-coach gangway without flexible interior system furnishing (including vestibule foot plate) forlhb coaches. gangway material must comply with the fire properties as specified in en 45545 hl-3. installation & commissioning: inclusive, as per mdts-22266 rev-01, packing instruction: pi091 ver. - 3.0. [ warranty period: 60 months after the date of delivery ] ]
Tender For corrigendum : supply of inter-coach gangway without flexible interior system furnishing (including vestibule foot plate) forlhb coaches. gangway material must comply with the fire properties as specified in en 45545 hl-3. installation & commissioning: inclusive, as per mdts-22266 rev-01, packing instruction: pi091 ver. - 3.0. [ warranty period: 60 months after the date of delivery ] ]