Get complete information related to latest Garbage Removal Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Garbage Removal Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Garbage Removal Tenders.
Tender For strengthening/ repair and other miscellaneous works to cess near br. no 5-a and removal of muck/malba from various yards on snl-juc section in the jurisdiction of aden/ldh.
Tender For providing of custom bid for services - cleaning of railway platforms including garbageremoval,custom bid for services - cleaning of passenger area including garbageremoval,custom bid for services - cleaning of fob, lift & escalator including garbageremoval,custom bid for services - cleaning of station building including garbageremoval,custom bid for services - cleaning of roads circulating area including garbageremoval,custom bid for services - rag picking along track including garbageremoval,custom bid for services - general cleaning of toilet and urinal (excluding pay & use toilet) and water booth & water coolant,custom bid for services - cleaning of septic tanks,custom bid for services - cleaning of cobweb,custom bid for services - collection lifting transportation unloading segregation of garbage & ways of disposal of sonpur railway station premises
Tender For reconstruction & restoration bhatta kuffer to koti km. 0/00 to 5/005 (sh:- construction of breast wall on damaged portion between km.1/640 and muck removal km. 1/610 to 1/640 (under pdna).
Tender For reconstruction & restoration bhatta kuffer to koti km. 0/00 to 5/005 (sh:- construction of breast wall on damaged portion between km.1/580 to 1/610 and muck removal km. 1/580 to 1/610 (under pdna).
Tender For -custom bid for services - tender for attending fire water, raw water and other ug line leakages at mrpl aromatic complex as per boq (bidder has to quote lumpsum price higher or lower than the sor value excluding gst as per boq).-1 1050799 earth work in excavation by manual / mechanical means below ground level in all kinds of works in all types of soils, depth 0 to 1.5 m in any work condition irrespective of magnitude of work, work place, work space, height, degree of complications, temperature, gradient including setting out, removal of vegetation, shrubs and debris, cutting and dressing of sides in slopes, construction of shoring, strutting and bracing, leveling, grading and ramming of bottoms, dewatering up to any extent of accumulated water from any source and keeping the surface dry for subsequent works, disposal or stacking of excavated material within a lead of 2km, . all complete as per standard specifications and diretction of engineer incharge, 2 1050800 earth work in excavation by manual / mechanical means below ground level in all kinds of works in all types of soils, depth 1.5m to 3.0m in any work condition irrespective of magnitude of work, work place, work space, height, degree of complications, temperature, gradient including setting out, removal of vegetation, shrubs and debris, cutting and dressing of sides in slopes, construction of shoring, strutting and bracing, leveling, grading and ramming of bottoms, dewatering up to any extent of accumulated water from any source and keeping the surface dry for subsequent works, disposal or stacking of excavated material within a lead of 2km, etc. all complete as per standard specifications and diretction of engineer incharge, 3 1050801 earth work in excavation by manual / mechanical means below ground level in all kinds of works in all types of soils, depth 3.0m to 4.5m in any work condition irrespective of magnitude of work, work place, work space, height, degree of complications, temperature, gradient including setting out, removal of vegetation, shrubs and debris, cutting and dressing of sides in slopes, construction of shoring, strutting and bracing, leveling, grading and ramming of bottoms, dewatering up to any extent of accumulated water from any source and keeping the surface dry for subsequent works, disposal or stacking of excavated material within a lead of 2km, etc. all complete as per standard specifications and diretction of engineer incharge. 4 1050802 backfilling and compacting the soil in layers of 300mm after execution of the work to proper grade and level with selected materials from available excavated soil from soil heaps within a lead of 2.00km, including re- excavating the deposited soil excavated earlier, breaking clods, loading, transportation, unloading, spreading to required level, watering, rolling and ramming by manual methods/ mechanical compactors, dressing, trimming etc. with all tools & tackles, machinaries, labour etc complete as per standard specifications and diretction of engineer incharge. 5 1050803 transporting & disposal of the surplus earth and excavated material including shrubs and vegetations from construction area to maximum lead of 2.0 km including reexcavating the deposited soil excavated earlier, loading, transportation, unloading, laying at all depths and heights, stacking, leveling and dressing both the area (viz. from where the earth is transported and where it is deposited) to required levels and slopes all complete as per standard specifications and diretction of engineer incharge.(the work volume of surplus material shall be measured as the difference of volume of excavation & the volume of back filling.), 6 1050804 pumping out water including dewatering the water mixed with muck/sludge etc from the trenches, ponds and other miscellaneous areas including supply and installation of dewatering pumps by contractor with all labour, hoses, consumables fuel etc.complete as per the directions of engineer incha