Get complete information related to latest Gas Cartridge Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Gas Cartridge Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Gas Cartridge Tenders.
Tender For supply of mechanical form (m-foam) fire extinguisher suitable for flammable liquid & petroleum products, trolley type 45 ltrs. capacity, with inbuilt gascartridge complete set, isi mark. is 16018 [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of procurement of stiffener plate complete of front carrier plate for aar-h type cbc with bdg as per rds0 drg. no. rdso/cg/drg/24034, alt-2 (item 1 to 5) note: 1. supply qty of stiffener plate of pitch p100=70% and pitch p90=30% 2. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of mechanical foam fire extinguisher 9 ltrs capacity, gascartridge portable type with initial charges, , abc 6kg fire extinguisher stored, pressure type, as per is: 15683
Tender For corrigendum : supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bot