Web Analytics Made Easy - StatCounter

Gas Ducting Tenders

Get complete information related to latest Gas Ducting Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Gas Ducting Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Gas Ducting Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :45432437 Due date: 22 Jun, 202622 Jun, 2026 NA
Tender For corrigendum : providing of custom bid for services - 200154955 cfd analysis of boiler flue gas ducting in one unit of kudgi stage 01 3x8000mw, ntpc kudgi

CTN :45057581 Due date: 04 Jun, 202604 Jun, 2026 9.50 Lacs
Tender For corrigendum : supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bot

CTN :45349762 Due date: 09 Jun, 202609 Jun, 2026 2.95 Lacs
Tender For procurement of materials for repair of various components used in the fixing of light poles installed across of the failure different wards within municipal area - 61.13 p/l of double wall corrugated hdpe pipe confirming to is 16205 p-24, stiffness class 750 n, externally corrugated and having smooth surface inside with hdpe coupler, elbow, tee at required depth below the ground for laying cable of following nominal outer dia. mfr test report from nabl accrediated is to be submitted. (excavation of earth & back filling with compaction is to be paid extra) all as per pre approved by engineer in-charge.. for additional technical parameters of products/ work, refer annexure "a" attached with this bsr 50mm dia. , providing & laying p.v.c. / xlpe insulated & p.v.c. sheathed unarmoured copper cable confirming to is:1554 p-i / is:7098 p -i of 1.1 kv with electrolytic grade copper made of copper rods confirming to is 613-1964, of purity >99.7%, inner/outer sheath confirming to is:5831 in existing rcc/hume/stoneware / pvc pipe/open duct/cable trench/cable tray (with cable tie) including testing etc. as required of following size. oem must have it's own in house nabl accrediated laboratory for testing procedure as per is:10810 for additional technical parameters of product / work refer annexure 'a' attached with this bsr 3 core , supplying and making one end termination with nickel plated heavy duty brass single compression gland (as per is 12943-1990)) sibg type consisting of check nut, gland body, metal washer(3 nos.), outer seal rubber ring, compression nut, heavy duty aluminium lugs (as per is 8309-1993) duly crimped with crimping tool, pvc tape as per is 8337-1976 of following size of pvc insulated & pvc sheathed/ xlpe aluminium conductor cable of 1100 volt grade as required.all as per pre approved by engineer in-charge. for additional technical parameters of products/work, refer annexure "a" attached with this bsr 4 x 10.0 sq.mm pvc tape roll , supply and fixing of following lt supporting accessories with nut bolt & clamps made out as per standard discom's specifications with two coats of red oxide and two coats of aluminium paint etc. as required. all as per pre approved by engineer in-charge.for additional technical parameters of product / work refer annexure "a' attached with this bsr type a lt connector for aerial bunched cable each 73.00

corporations/Associations/Others

CTN :45178613 Due date: 03 Jun, 202603 Jun, 2026 NA
Tender For supply of two way switch 22pt5 mm size , oil burner sequence controller obsc , flow meter for flue gas ducting obsc , pneumatic flow control valve , temp controller 96 x 96 , temp indicator 96 x 96 , main switch 32 amp , ignition transformer 12000 volts , ignition transformer mounting box for oil , thermocouple k type 600 degree c , thermocouple k type 1200 degree c , k type thermocouple , photo cell steel body l d r 20mm , ignition rod 300 x 10mm , ignition rod 250mm x 8mm , ignition rod connector push type plug , burner cable connector 2x2 way ceramic , id fan belt drive ss304 , fd fan direct drive ms2062 , auto burner primary chamber 1pt35 , auto burner secondary chamber 1pt0

CTN :44757118 Due date: 27 Apr, 202627 Apr, 2026 9.00 Lacs
Tender For corrigendum : fabrication work d d - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of sulfur f

State Government

CTN :43678357 Due date: 15 Apr, 202615 Apr, 2026 NA
Tender For corrigendum : work of fabrication and erection of rubber expansion compensator for expansion bellows of flue gas ducting in boiler unit no. 3 & 4 on as and when required basis.
 Loading, Please wait...

Connect us via What's Up