Web Analytics Made Easy - StatCounter

Gas Pipe Fittings Tenders

Get complete information related to latest Gas Pipe Fittings Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Gas Pipe Fittings Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Gas Pipe Fittings Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :43400813 Due date: 16 Jan, 202616 Jan, 2026 NA
Tender For tender for supply of tools for trademans d d -digital clamp meter (600 amp , ) , digital battery tester 13ct 700 , hydro meter , battery pole die +ve , -ve , alternator test bench , 1/4 inch square drive matrix socket set(46 pcs) , multimeter 600v (ac/dc) , refracto meter for def checking 6 in 1 function , alternator regulator tester (vegas) v 414 , safety goggles , torx key set -kth95 (9nos) , distilled water plant (aqua works (3000 watts (5 ltr /hr) , lathe carbide inserts cutting tool for machine steel parts(tnmg 331- maus) , insert cutting tool holder , magnise cnc tools holder(6/7/8/10/12mm lathe boring bar set ccmt carbide insert) , cnc lathe turning tools holder mgehr 1212-2 12x100mm boring bar 10pcs mgmn 200-g carbide inserts high hardness cutter dz10 , cobalt step drill bit spiral size 3mm to 25mm , hss drill bit 1 mm to 6mm 10pcs set , carbide threding inserts gbj-10 pcs 16 erag 60 , carbide threding inserts gbj-10 pcs 16 irag 60 3/8 inch , insert holder(16er ag60 , 16 irag 60 gold) , tap & die (8x1.25mm) , tap & die (10x1.5mm) , tap & die (12x1.5mm) , tap & die (14x1.5mm) , tap & die (16x1.5mm) , tap & die( 18x1.5mm) , tap & die (20x1.5mm) , tap & die (22x2.5mm) , tap & die a nf 1/4 inch , 3/8 inch , 1/2 inch , 5/8 inch , 3/4 inch , 5/16 inch , tap & die bsp 5/16 inch , 3/8 inch , 1/2 inch , 5/8 inch , 3/4 inch , steel rule 24 inch , reamer (adjustable) size- 22mm to 28mm , reamer (adjustable) size- 28mm to 35mm , reamer (adjustable) size- 35mm to 40mm , reamer (adjustable) size- 38mm to 45mm , straight shank drill bit 10.5 , 12 , 12.5 , 14 , 16 , tapper shank drill bit 16mm , 17.5mm , 18mm , 19mm , 20mm , 22mm , 24mm , 32mm , 45mm , marking block magnetic base with dial gauge (for lathe machine) , hss cutting tool size 1/4x100mm , 3/8x100mm , 1/2x100mm , niddle grinder 600w , drill sleeve 1-2 size , drill sleeve 1-2 size , drill sleeve 3-4 size , cutting disc 1.5x100mm , grinding disc 4x100mm , painting brush 2 inch , 4 inch , helmet mask , writing brush , pilot spray gun (cup type) 1 ltr capacity , nozzle tip cleaner (gas cutting nozzle) , spark lighter , angle grinder light duty 600w , anvil heavy duty (akt 25) , hand drill machine heavy duty 750w (size 1 to 30mm) , bench grinder , criclip plier (in side) , criclip plier (out side) , nose plier 10 inch , socket heavy duty 34 mm , socket heavy duty 55 mm , socket heavy duty 60mm , socket heavy duty 65 mm , socket heavy duty 70mm , socket heavy duty 80mm , injector opening box spanner 24 mm , injector opening box spanner 27 mm , allen key set (in inch) , allen key set (mm) , micro mete 0 to 25mm , micro mete 26 to 50 mm , micro mete 51 to 75 mm , micro mete 76 to 100 mm , dial gauge set for inner bore dia checking 02 mm to 200 mm , hyd pressure gauge test kit 100 to 600 bar , diesel engine compression pressure gauge test kit , mechanical jack 30 inch , pipe wrench 12 inch , fip high pressure line removing/fitting spanner 17 no & 19 no , fip opening ring spanner 14x15 & 12x13 , pre stroke tool for all inline/rotary diesel engine , injector testing pipe for fip test bench (600x6x2) , dropping tube for pump testing , fip test bench mini compressor for testing of pressure boost portable , fip gear removal tool for engine , c type ring spanner 10x11mm & 12x13mm , scissors 12 inch , claw hammer 200 gms , hammer 1/2 kg , hammer 1 kg , hammer 5 kg , chisel 6 inch-9 inch , center punch 4mm x 4 inch , adjustable oil filter wrench , light duty socket set , havy duty socket set , single end spanner 17 , 19 for fitting / removing of injecter pipe , hand press machine 50 ton capacity , bench vice 8 inch heavy duty , light duty drill machine , light duty hand grinder , nose plier 12 inch , electric planner 550w , hand drill machine 800w , electric rotary hammer machine 720w

CTN :42858438 Due date: 02 Jan, 202602 Jan, 2026 NA
Tender For bid to ras supply of repair of vehicle - steering oil pipe als , hood lifting ramp assy oh als , clutch plate repeating als , ball joint als , wheel alignment tata safari , wiper blade tata safari , uj cross maruti gypsy , front break pad maruti gypsy , found hub bearing maruti gypsy , hub seal maruti gypsy , circlip lock maruti gypsy , rear hub seal army bus , high pressure line brazing als , hose pipe als , mounting bolt als , clutch cable maruti ciaz , clutch master cylinder assy maruti ciaz , labour charge maruti ciaz , cabin lifting pump oh als , clutch booster als , door regulator assy maruti gypsy , side channel beading maruti gypsy , hose pipe maruti gypsy , reverse light switch maruti gypsy , front break cable royal enfield , side mirror royal enfield , self armature sx4 , solenoid switch sx4 , copper bush sx4 , brush carrier sx4 , wiper relay 2.5 ton , rotating gear 2.5 ton , pressure pipe als , reverse light switch als , head light bulb hero honda , rear door lock assy maruti gypsy , water pump assy als , thermostat valve als , door regulator assy als , u bolt army bus , hub seal als , door light switch maruti gypsy , clutch master cylinder assy als , self bush 2.5 ton , clutch master cylinder assy tata safari , clutch cable tata safari , labour charge tata safari , break light switch maruti gypsy , release bearing maruti gypsy , clutch plate new fitted maruti gypsy , pressure plate maruti gypsy , wiper motor gear 2.5 ton , temperature sensor als , battery lead als , ac compressor assy new fitted tata safari , ac clutch assy tata safari , ac gas filling tata safari , air compressor fitting and clutch fitting and checking and fitting all parts tata safari , glow box maruti ciaz , clutch cable royal enfield ) /bid number : gem/2025/b/6907572 * /dated: 21-11-2025 & & / bid document 1 / 45

corporations/Associations/Others

CTN :43287647 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For ttps operation circle mpm i unit i complete dismantling of mill 1f and reassembling the dismantled spares in mill 1b - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin

corporations/Associations/Others

CTN :43287648 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For ttps operation circle mpm i unit i complete dismantling of mill 2f and reassembling the dismantled spares in mill 1c - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin
 Loading, Please wait...

Connect us via What's Up