Web Analytics Made Easy - StatCounter

Gear Motor Repair Tenders

Get complete information related to latest Gear Motor Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Gear Motor Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Gear Motor Repair Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :43415354 Due date: 09 Jan, 202609 Jan, 2026 19.26 Lacs
Tender For lwss shimla to gumma sh repair rewinding of stator rotor of 2 2 kv induction motor bhel make 690kw 925 hp having special repair no 40091 a 402 11 01 at new gumma pumping station

CTN :43401123 Due date: 12 Jan, 202612 Jan, 2026 49.9 Thousand
Tender For providing of custom bid for services - repair rewinding of three phase induction motor cap of 30 kw of stone crusher 20 tph make parishram

CTN :43376290 Due date: 06 Jan, 202606 Jan, 2026 90.0 Thousand
Tender For repair and maintenance of wss bhadsali tehsil haroli distt una) (sh:- repair of centrifugal pump 40 hp 3 stages ksb make with induction motor. set no i )(b) repair and maintenance of wss saloh distt una (sh:-replacement of ci sluice valve 125mm dia and replacement of hrc fuce with base

CTN :43377352 Due date: 08 Jan, 202608 Jan, 2026 99.2 Thousand
Tender For repair and maintenance of lwss rainsary jhalera (sh:- repair of 10 hp induction set no1 nad b) repair and maintenance of lwss rainsary jhalera of 12.5 hp motor with 2 stages centrifugal pump set no 1)

CTN :43377366 Due date: 08 Jan, 202608 Jan, 2026 88.0 Thousand
Tender For repair and maintenance of wss dhamndri sanjhot (sh:- repair of 60 hp 4 stages centrifugal pump) set no1 b) repair and maintenance of wss badoli tiuri (phase 1st) old (sh:- repair of 20 hp induction motor set no 2)

CTN :43383961 Due date: 08 Jan, 202608 Jan, 2026 NA
Tender For repair and maintenance of lwss rainsary jhalera (sh:- repair of 10 hp induction set no1 nad b) repair and maintenance of lwss rainsary jhalera of 12.5 hp motor with 2 stages centrifugal pump set no 1)

CTN :43383962 Due date: 08 Jan, 202608 Jan, 2026 NA
Tender For repair and maintenance of lwss rainsary jhalera (sh:- repair of 10 hp induction set no1 nad b) repair and maintenance of lwss rainsary jhalera of 12.5 hp motor with 2 stages centrifugal pump set no 1)

CTN :43383967 Due date: 08 Jan, 202608 Jan, 2026 NA
Tender For repair and maintenance of wss dhamndri sanjhot (sh:- repair of 60 hp 4 stages centrifugal pump) set no1 b) repair and maintenance of wss badoli tluri (phase 1st) old (sh:- repair of 20 hp induction motor set no 2)

corporations/Associations/Others

CTN :43287647 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For ttps operation circle mpm i unit i complete dismantling of mill 1f and reassembling the dismantled spares in mill 1b - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin

corporations/Associations/Others

CTN :43287648 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For ttps operation circle mpm i unit i complete dismantling of mill 2f and reassembling the dismantled spares in mill 1c - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin
 Loading, Please wait...

Connect us via What's Up