Tender For corrigendum : providing of hiring of consultants - milestone/deliverable based - selection of geo-technicalinvestigation agency for preparation of dpr for integrated flood and erosion management of river torsa and its tributaries in district alipurduar and cooch behar under b..
Tender For providing consultancy services for for preparation of detailed project report dpr including architectural structural designing and geo-technicalinvestigation third party vetting of structural engineering designs and all other services preparati
Tender For geo-technicalinvestigation for proposed important railway bridge no.195 across krishna river with gadag wadi new bg railway line project. - geo-technicalinvestigation for proposed important railway bridge no.195 across krishna river and other bridges for foundation, substructure & superstructure and other ancillary works from km 145950 to km 149225 (3.275 km) in connection with gadag–wadi new bg railway line project & proposed tunnel from km 85125 to km 86100 (approx. 975 m) in connection with belur–hassan (alur) new bg railway line project.
Tender For geotechnicalinvestigations at mori-tiuni hep at district- uttarkashi/dehradun. - "geotechnicalinvestigations at mori-tiuni hep at district- uttarkashi/dehradun".
Tender For (1) geo-technicalinvestigation survey of starter dyke & ngl of lagoon-1b of ash dyke dindolbhata 1x500mw htps, cspgcl, korba west.(2) geo-technicalinvestigation survey at top of 1st stage & 2nd stage raising of lagoon1a & 1b of ash dyke dindolbhata 1x500mw korba west
Tender For geo-technicalinvestigation for the construction of underground and elevated metro corridors from kr circle station (excl.) to hebbal station (ch 27.273 to ch 36.089 km) under phase-3a of the bangalore metro rail project.
Tender For final location survey (fls) for new bg railway line of various projects like gazol-itahar(approx 27.2 km), itahar-raiganj( approx-21.825 km), itahar-buniadpur( approx-39 km) and raiganj-dalkhola (approx 43.43 km) including submission of dpr , preparation of l-section, esp, gad of all bridges, land plans, hydrological survey, traffic survey, geo-technicalinvestigation , revised estimate etc as per railway board's latest guide lines complete in all respect of n. f. railway (construction).