Get complete information related to latest Gi Conduit Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Gi Conduit Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Gi Conduit Tenders.
Tender For corrigendum : supply of 24 mtrs. of 200nb and 12mtrs. of 150nb galvanized iron erw heavy grade pipes required for shiva project, kpcl, malavalli - 571437
Tender For corrigendum : iron material supply for the fin year 2025 26 - iron mesh (rate per kg) , iron chamber (rate per kg) , iron window (rate per kg) , iron door (rate per kg) , iron ventilation (rate per kg) , iron corrugated sheet galvanized , iron corrugated sheet plain cr/hr , iron pipes all sizes (rate per kg) , anchor bolts (rate per kg) , j hooks & visors (rate per kg) , iron angles (rate per kg) , iron strips (rate per kg) , iron girders (rate per kg) , iron galvanized wire barbette wire (rate per kg) , iron tree guard mesh (rate per kg) , iron shutters (rate per kg) , iron channel gates (rate per kg) , other iron materials (rate per kg) , iron profile sheet all sizes (rate per kg) , chain link mesh all sizes (rate per kg) , screws j hooks & screws, visor all sizes(rate per kg) , iron pipe frame all sizes(rate per kg) , iron fencing pole angle all sizes(rate per kg) , angle + sheet information board all sizes(rate per kg) , garbage cart iron (two wheeler) wheel iron , garbage cart iron (two wheeler) wheel rubber , iron plate all sizes(rate per kg) , tin shed construction and installation rate per square feet , tin shed construction and installation rate per running feet
Tender For supply of for nursery maintanance - installation of green net including labour and material 75 percentage, installation of galvanized profile including labour and material , 4 meters, installationof spring including labour and material w. type, installation of screw including labour and material three-quarters 25mm, installation of 16 mm isi lateral pipe including labour and material, installation of 63 mm pvc pipe including labour and material 4 k.g isi, installation of 63 mm elbow including labour and material 4 k.g, installation of63 mm valve including labour and material, installation of 1"m.s. pipe square including labour and material, installation of 16 mm lateral cock including labour and material, installation of 16 mm elbow including labour and material, installing pole by digging pit and filling rcc, installation of galvanized wire including labour and material (16 gauge), installation of oil paint color including labour and material, installation of 63 mm t including labour and material, installation of uv film including labour and material (200 micron), repair of fogger system with labour and material 4 ply, repair root trainer stand, installation of white net including labour and material (75 percantage), installation of galvanized pipe 32 mm including labour and material thickness 2 mm, installation of galvanized pipe 40 mm including labour and material thickness 2 mm, installation of galvanized pipe 50 mm including labour and material thickness 2 mm, installation of galvanized pipe 63 mm including labour and material thickness 2 mm, installation of galvanized pipe 20 mm including labour and material thickness 2 mm, installation of nut bolt 1.5 inch including labour and material 8 m.m, installation of nut bolt 2 inch including labour and material 8 m.m, installation of nut bolt 4 inch including labour and material 8 m.m, repairs and installation of net house including labour and material, installation of pump set with labour and material 2 h.p, repairs of polyhouse gutter fiber including labour and material, repair mother bed including material and labor, installation of channeling mesh with material and labour, installation of micro sprinkler with material and labour, installing of micro tube with material and labour, installation of cycling timer set with material and labour, installation of sensor in high teck nuresery including material and labour cost, repair turpentine and installation with material and labour, repair exhoast fan and installation with material and labour (48 inch), repair cooling pad panel with labour and material (galvanized), installarion of cooling pad (4 feet * 2feet) with material and labour, installation door for greenhouse/polyhouse, installation 32 mm pvc pipe with labour & material 10 kg isi, installation 32 mm valve with material and labour, service screen filter (63mm) with material and labour, repirs air valve (32mm) with material and labour, installation foundation pipes (2mm) with material and labour, electrical work (wiring, board, price including labor and material), service one hp submersible pump with labour and material, service two hp submersible pump with material and labour
Tender For providing of raw water supplies item, filter water supplies item-1) providing and laying including testing ductile iron mechanical joint collar with follower glands conforming to is: 9523/2000 having dimension as per table 24 of is: 9523/2000 in the following nominal diameter/sizes with external bitumen and internal cement mortar lining. 2) providing and laying including testing ductile iron double socket 90 bends conforming to is: 9523/2000 having dimension as per table 15 of is: 9523/2000 in the following nominal diameter/sizes with external bitumen coating and internal cement mortar lining. 3) providing and laying including testing ductile iron double socket 45 bends conforming to is: 9523/2000 having dimension as per table 16 of is: 9523/2000 in the following nominal diameter/sizes with external bitumen coating and internal cement mortar lining. 4) providing and laying including testing ductile iron double socket 22.5 bends conforming to is: 9523/2000 having dimension as per table 17 of is: 9523/2000 in the following nominal diameter/sizes with external bitumen coating and internal cement mortar lining. 5) providing laying and jointing of following galvanized iron (ms) pipes with specials (such as bends, elbows, tees etc) class light, medium & heavy including testing ofjoints, cost of pipes, specials and jointing materials all complete. pipes and sockets conforming to 1s:1239/2011 part 6) providing and fixing g. i. union in g.i. pipe line i/c cutting threading testing etc. complete (new work) confirming to is 1879. 7) providing and fixing g. 1. socket in g.i. pipe line i/c cutting threading testing etc. complete (old work) confirming to is 1879 .8) providing and fixing g. 1. bend 90 degree in g.i. pipe line ife cutting threading testing etc. complete (old work) confirming to is 1879 .9)_ supplying & installation star of energy efficient tive bee rating isi marked required capacity of three phase. 50 hz. 415v. deep well submersible pump steel body, suitable for 6"tube well with control panel starter suitable for submersible pump with dry run protection, single phase preventer, connections, including clamps, bore cap etc, as required as per specifications but excluding pipe and connection cable. .10) .
Tender For providing and installation /fixing of children play equipment at navkunj apartment in patparganj ac-57. - providing and fixing double arch swing of make kompan/ leo/koochie/hugo/arihant. the arch shaped side frame of the double arch swing is made up of 80 nb gi pipe and top pipe is made up of 50 nb gi pipe. the frame is powder coated to give an aesthetic look. seats-belt type seats made of synthetic rubberized material/fiber reinforced fabric materials of virgin reinforced material. the belt seat is suspended on 6 mm rubber coated gi chain. the ball bearings are mounted inside a specially designed nylon clamp. all complete as per the direction of engineer in charge or as per approved drawing & design given by manufacturer including earth work, c:c work up to plinth level, cc block 1:2:4 (1 cement:2 coarse sand :4 graded stone aggregate 20mm nominal size ) of required size as per department / manufacturers specifications and guidelines including maintenance cost for 1st year. for the laying of foundation of equipment cc work shall be paid separately., providing & fixing of animal mgr of make kompan/ leo/koochie/hugo/arihant.. bearing heavy duty ball bearing, capacity 4 child, center pipe 2 inch g.i. pipe, diameter 2.0 mtr. dia, handle2 5 mm od g.i pipe, outer frame 32mm od g.i pipe, size dia 2.0 mtr. , height-4 ft, usage/application outdoor playground. the center support of the is made up of 50 nb gi pipe. the pure polyester powder coating done on the pipes extends the life of equipment. all complete as per the direction of engineer in charge or as per approved drawing & design given by manufacturer including earth work, c:c work up to plinth level, c:c block 1:2:4 (1cement 2 coarse sand 4 graded stone aggregate 20mm nominal size) of required size as per department / manufacturers specifications. for the laying of foundation of equipment cc work shall be paid separately., providing and fixing of multi seater see saw of make kompan/ leo/koochie/hugo/arihant.. size (0.300 m 2.50 m product area) with plank fabricated from 76 mm od pipe and support stand from 58mm od galvanized-iron pipe, complete with roto molded seats and handles. the entire unit is securely anchored into a cement-concrete block foundation after deep excavation and earthwork, including all necessary fixing arrangements. the designated safe play zone measures 2.8 m 4 m, and the see-saw is designed for children aged 3 10 years, accommodating up to four friends riding simultaneously. all complete as per the direction of engineer in charge or as per approved drawing & design given by manufacturer including earth work, c:c work up to plinth level, c:c block 1:2:4 (1) cement :2 coarse sand:4 graded stone aggregate 20 mm nominal size) of required size as per department / manufacturers specifications. for the laying of foundation of equipment cc work shall be paid separately., providing & installing of a swing of make kompan/ leo/koochie/hugo/arihant.. size 3.10x 1.50mtr. main frame: - main cross bar made of round 76 o.d. pipe and legs made of 58 od pipe legs. t pipe will be required for the cross bar. all the pipes should be isi marked as per the is 1239/2004 ) & of reputed brand. ensuring the strength, durability, stability & pan long life to the kids. structure with safety as paramount. seats-belt type seats made of synthetic rubberized material/fiber reinforced fabric materials of virgin reinforced material & also duly with uv resistant colors, chain made of approx. 6mm thick gi chain with rubberized coating of with 3 mm minimum thickness, chrome plated supporting hook for belts hooks for convenience & height adjustment/ seat movement, self lubricated council type bush baring clamps provided with rubber coated chain to be hang the complete belt assembly. the complete structure double art swing should be powder coated with minimum powder coating thickness of 60-80 microns. accessories: nut bolts to be used all approved gi nut bolts
Tender For procurement of galvanized iron (gi) pipes with polyester powder coating of various sizes on annual rate contract basis for a period of 02 years
Tender For supply of supply of 2 mega pixel network dome camera with power adaptor , supply of 2 mega pixel network indoor ir ptz camera , supply of 2 mega pixel network outdoor ir ptz camera , providing camera recording licenses for existing video management software , supply of 8tb hard driver , supply of spf plus sr optic 10gbe 850nm module for existing storage , supply of om4 lc or lc fiber cable , supply of workstation , supply of 55 inch display unit , supply of layer-2 24 ports poe plus managed switch , supply of 1g single mode sfp transceiver module , supply of 12 core single mode armoured optical fiber cable , supply of 12 port loaded optical fiber liu , supply of optical fiber patch cord , supply of cat6 4 pair unshielded twisted pair cable , supply of cat6 4 pair shielded twisted pair cable , supply of cat6 24 port u or utp patch panel , supply of cat6 u or utp patch cord , supply of rj 45 connector , supply of 6u wall mount network rack , supply of 3 core 2.5mm copper electrical cable , supply of electrical box with 25 amp mcb 15 or 16 amp socket at rack end , supply of 5 or 6 amp shuttered switch socket combined with cover plate and back box , supply of 4 way waterproof electrical cable junction box with terminal block , supply of 25mm ms conduit with all fixing accessories , supply of 25mm pvc pipe with all fixing accessories for indoor , supply of 25mm pvc flexible pipe for indoor , supply of 32mm pvc pipe with all fixing accessories for indoor , supply of 32mm pvc flexible pipe for indoor , supply of 25 or 32mm pvc reinforceable flexible pipe , laying of 25mm pvc pipe for indoor with all fixing accessories , laying of 25mm pvc flexible pipe for indoor , laying of 32mm pvc pipe with all fixing accessories for indoor , laying of 32mm pvc flexible pipe for indoor , laying of 25 or 32mm pvc reinforceable flexible pipe , laying or fixing of ms conduit including fixing ) /bid number : gem/2025/b/6504064 * /dated: 28-07-2025 & & / bid document 1 / 37 & & ' ' /item category of suitable saddle or screws etc , laying of optical fibre cable end to end ferruling labeling and termination through hdpe or ms conduit or giconduit or pvc pipe , laying of cat6 u or utp end to end ferruling labeling and termination through pvc pipe , laying of cat6 stp end to end ferruling labeling and termination through hdpe or ms conduit or giconduit or pvc pipe complete as required , laying of electrical cable end to end ferruling labeling and termination through hdpe or ms conduit or giconduit or pvc pipe complete as required , mounting, fixing, labeling and dressing of 6u wall mount rack complete as required , mounting, fixing and labeling of all types of cameras complete as required , installation splicing of all ofc core rack to server rack, labelling, testing and commissioning of 12 or 24 port liu with all its accessories complete as required , installation of 5 or 6 amp shuttered switch socket combined with cover plate and back box complete as required , installation of electrical box with 25 amp mcb 15 or 16 amp socket at rack end complete as required , installation, testing and commissioning of hdd storage complete as required , mounting, fixing, installation, testing, labeling and commissioning on the network rack side of u or utp 24 port patch panel complete as required , mounting, fixing, installation and configuration of all types of switches complete as required , installation and configuration of workstation complete as required , mounting, fixing, installation and configuration of all types of display unit complete as required , configuration of cameras recording licenses for existing video management software primary and redundary server complete as required , relocation of existing cameras with accessories complete as required , testing, commissioning ,certification, providing 3 sets of completion diagram and documentation of entire project complete as required