Get complete information related to latest Gi Item Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Gi Item Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Gi Item Tenders.
Tender For 1)printing of different forms, register & envelopes 2) supply of table & office stationery 3) it consumable such as cartridge, ribbon.printerhead. tonner, cd4) computer stationery(paper, prem receipt, payment voucher etc 5) telecommunications equipments eg fax, pbx, telephone equipments 6) water purifier (sales & service (7) supply of towels (bombay dying), curtains & uniforms (roymond's) 8) note counting machine 9) fake note detecting machine 10) gift items 11) electrical equipments inclusive tube light and chock etc 12) stamps preparation 13) preparation of visiting cards and identity cards 14) writing of name plates and marking of inventory 15) pest control 16) fire fighting equipments(supply and service) 17) purchased and lifting of waste papers 18) supply of furniture and fittings 19) recycling of printer head 20) courier services 21) furniture repairing 22) xerox/lamination 23) travel agents 24) suppply of all type of branded fan 25) sign board & glow sign for our offices 26) consultancy service for taxes 27) binders.28) hiring of diesel generator set
Tender For providing of facility management services - lumpsum based - gift item: samuhik:mukhyamantri samuhik vivah(new couple); mukhyamantri samuhik vivah; consumables to be provided by service provider (inclusive in contract cost)
Tender For corrigendum : request for bids for supply, installation and commissioning of slaughter house plant as per apeda standard - a: civil work items, dismantling the reinforcement cement concrete (r.c.c.) work 1:2:4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed etc. complete., dismantling brick masonry in lime or cement mortar and stacking the material as directed with all leads, lifts etc., removing doors and windows with frames and stacking the materials as directed with all leads, lifts etc. complete., removing ventilators and small windows with frame and stacking the materials with all leads, lifts etc. complete., removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. complete, removing purlins from roof including stacking as directed with all leads , lifts etc. complete., removing rafters from roof including the materials as directed with all leads , lifts etc. complete., removing queen post truss from roof and stacking the materials as directed with allleads and lifts etc. complete, removing galvanized iron (g.i.) or asbestos cement (a.c.) sheet roofing including purlins, principal rafters etc. including sorting serviceable and unserviceable materials, stacking the same as and where directed in the compound including scaffolding etc. complete., excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift upto 1.5 m.) by mechanical means, lift upto 1.50 m, excavation for foundation in hard murum including removing the excavated material upto distance of 50 meters beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift upto 1.50 m) by mechanical means, lift upto 1.50 m, excavation for foundation in hard murum including removing the cubic meter (cu.m) excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift from 1.5 to 3.0m.) by mechanical means, excavation for foundation in soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (lift from 1.5m to 3.0 m.) by mechanical means, lift upto 3.0 m, excavation for foundation in hard-rock by blasting including cubic meter (cu.m) trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the building area including dewatering and back filling with available earth/murum watering, ramming etc. complete. (lift from 1.5m to 3.0 m) by mechanical means, filling in plinth and floors with approved excavated materials available at site in 30 cm layers include- ing watering and compaction with plate compactor to required proctor density etc complete., filling in plinth and floors with contractors material/brought from outside and approved by engineer in charge in layers of 15 cm to 20 cm including watering and compaction etc. complete., providing dry trap / granite / quartzite gneiss 200 mm thick hard core metal spread in two layers each of 125mm thick crushed to 100 mm c