Get complete information related to latest Glass Rod Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Glass Rod Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Glass Rod Tenders.
Tender For corrigendum : tender for supply of 7 8 vibration eliminator (oil inlet to comp) , drier ( 2 core 1 5 by8 od) , 1 5 8 vibration element comp suction , 80nb chilled water pump suction bellow , 80nb chilled water pump discrarge bellow , crank shaft , connecting rod with piston , main rotor , valve plate complete , bearing bush , small end bearing , thrust washer , thrust washer , oil flow switch , oil flow switch complete , discharge shut off valve complete , suction shut off valve complete , oil filter , filter with o ring , compressor oil filter including o-ring , integrated check valve complete , o ring for filter element , gasket set , set of gaskets , shaft seal , shaft seal , compression ring , compression ring , oil scrapper ring , piston pin , set of bearings , air break contactor 2no 2no aux contact 240v 16amps , air break contactor , air break contactor , disc hose 65mm a c chill water pump , disc hose 125mm a/c sea water pump , suction hose 150mm a/c sea water pump , mushroom flaps for systems he 1 he 2 he 3 s5s he 18 , mushroom flaps for systems s1s s2e s6e ns , mushroom flaps for systems s21e , mushroom flaps for systems s3s , mushroom flaps for systems s4e , cooling thermosat (danfoss) , socket head screw 1 lot 100 nos , socket head screw 1 lot 100 , socket head screw 1 lot 100 , socket head screw 1 lot 100 , electronic timer 0-60sec with 220v 50z opertaing coil , four pole mcb rated 16 amps mds make , hrc fuse 32a make ee gec , vibration eliminator size 2 5 by 8
Tender For 25 kv earthing/discharge rod assembly for high rise ohe with working voltage 25 kv ac traction with top clamp (suitable for 36 to 50 mm bus bar and also suitable for 10 to 20 mm dia. conductor) . pole made of cast resin or resin-bonded glass fibre, coated with three coats of poly- urethane, the discharge /earthing pole assembly shall have an overall length of not less than 7.5 meters in five equal sections. single core flexible multi strand annealed copper cable should have double insulation, a cross section of 40 sq mm of size 248/0.45 mm and 14 meter long cable (specification is: 1554 (pt. i)- 1988 and is 2071 (pt. 1 and iii). with earthing double clamp drg. no. eti/ohe/sk/482 or latest (each discharge rod is to be supplied with 02 nos. earting clamps), insulated tee junction- insulated tee junction drg no. eti/ohe/sk/481 and re/33/p/530 or latest (the cable should have an insulated tee junction and the tee clamp should be of brass covered in clamp casing of ebonite material). and whole assembly to be supplied in rugged canvas bag and all shall be as per rdso specification no. eti/ohe/51 (9/87) with latest a and c slip no. 1 (10/92) or latest , and additional part required with each discharge rod to be supply. (1) 01 nos. insulated tee junction. (2) 01 nos. top clamp made of copper suitable for 36 to 50 mm bus bar and also suitable 10 -20 mm dia conductor, (3) 01 nos. spare earthing clamp and. (4) special instruction- 1. discharge rod cable lugs should be made of copper. 2. the cable should have double insulation, a cross- section of 40 sq mm, and 248/0.45 mm strands. 3. the discharge rod should be strong enough to prevent swaying or breaking during maximum extension. every nut and bolt used in the discharge rod must include a washer and spring washer to ensure secure fastening. 5. after the award of the p.o., the firm must ensure approval of one sample of the discharge rod from the consignee before rites inspection. 6. the length of cable from the earthing clamp to top clamp shall not be less than 12.5 mtr. in the cable an insulated tee junction shall be provided at a distance of about 3.5 mtr from the earthing clamp. from this insulated tee junction another piece of cable not less than 1.50 m long shall be provided at the end of which other earthing clamp shall be provided. 7. the galvanized steel tube (threaded) used for coupling of pieces of discharge rod should be at least 20 cm or more as required to prevent swaying of pole assembly during erection at site. also at every 5 cm apart two nos steel rivet is required to be provide on galvanized steel tube ( for preventing the galvanized steel tube from coming out from each discharge rod pole end). i.e. about 08 nos. or more steel rivet as required per galvanized steel tube is to be provided for proper fastening of galvanized steel tube inside the each pole of discharge rod. (warranty period- 30 months after the date of delivery). [ warranty period: 30 months after the date of delivery ]