Get complete information related to latest Go Switch Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Go Switch Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Go Switch Tenders.
Tender For supply of pressure governor switch kbi part no. 192268/00502 or ftrtil part no. ft0051023-000. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of pressure governor switch kbi part no. 1135829/05545 or ftrtil part no.ft0051023-004. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of pressure governor switch (rgcp) kbi part no. 181649/10080 or ftrtil part no.ft0051023-008. [ warranty period: 30 months after the date of delivery ] ]
Tender For auction sale of conveyor belt etc.,aph basket scrap etc.,misc.iron scrap mixed etc.,instrumentation/control cable etc.,ci pipe scrap etc.,old & used survey off 145kv etc.,empty steel drum etc.,ms iron etc.,ht wire & iron scrap etc.,gi scrap of tower scrap etc.,goswitches defective,u/s tyres etc.
Tender For “supply of pedestal, is required inoperation circlekangraunder chief engineer (op.) kangra zone,dharamshala”the estimated cost put to tender rs.1,99,900.00/-only - male and female goswitch
Tender For supply of material as per annexure-i, is required in operation circle dalhousie under chief engineer (op.) kangra zone, dharamshala -"mounting arrangement unit made of polymeric material suitable for male / female contacts of 11 kv goswitches as per specification"
Tender For supply of as per annexure i required in operation circle kangraunder chief engineer (op.) kz, dharamshala -"400 amp male contact for 11kv goswitches as per tender specification"
Tender For corrigendum : tender for supply of equipment material design erection testing commissioning for sop to ms shyam indus pvt ltd co prittam singh at vill baghni by prov 1104kv 25kva sstn aw 3ph lt line in vill baghni in e section bhadwar under esd hpsebl nurpur. t - 25 kva trsanformer, prov. distribution transformer (ordinary), 11/0.4 kv, 25 kva ., prov. steel tubular poles (9 m, working load > 200 kgf/m ) ., prov. muffs with concerete filling, prov. x-arm: [channel iron (100x50x6 mm), length : 2800 mm x 2 nos] for incomer line, prov. ms angle iron (50x50x6 mm), length: (2800 mm) x1 nos for las, prov. x-arm: [channel iron (75x40x6 mm), length : (2800 mm x 4 nos] for supporting do fuse unit & goswitch, prov. transformer bed, belting & knee bracing, prov. x-arm: [channel iron (100x50x6 mm), length : 2800 mm x 2 nos] for transformer bed, prov. x-arm [channel iron (100x50x6 mm), length : (460 mm) x 2 nos for supporting main channel of transformer], prov. ms angle iron (50x50x6 mm), length : (2800 mm) x 2 nos, prov. ms angle iron (35x35x5 mm), length : (460 ) x 2 nos, prov. ms angle iron (50x50x6 mm), length : (950 mm) x 2 nos for bed knee bracing, prov. transformer lt distribution box and goswitch fixing assembly, prov. ms angle iron (50x50x6 mm), length : (2800 mm) x 2 nos, prov. ms angle iron (50x50x6 mm), length : (450 mm) x 1 nos, prov. goswitch handle supporting: [channel iron (75x40x6 mm), length : 460 mm, prov. go ab switch unit (11kv, 400a, 25 ka ) tripple pole o/d type, prov. d.o fuse unit, prov. lighting arrester, 9 kv station class (porcelain type), prov. discs insulator sets (comprising 1 no. disc: ^^(porcelain, bs, 12 kv, 90 kn) including dead end clamps etc.), prov. stay set complete, prov. stay wire (7/3.15 mm) (6.0 kg per stay set), prov. pipe earthing set, prov. lt distribution panel box with mccb(160a, 10ka, 4p, 1no) & sfu(32a, 5no, rewirable), prov. half clamp (m.s. flat 50x6 mm), prov. full clamps (m.s. flat 50x6 mm), prov. nuts and bolts of various sizes (galvanised / coated) [preferably 16 mm or more (with flat and spring washers)], prov. aluminium thimble, prov. copper thimble 35 amp, prov. danger plate, prov. barbed wire, prov. lt cable (3.5 core) 50 mm , prov. energy meter 3- , 4 wire ct operated static tri-vector meter with box(ct-100a), prov. aluminum paint., prov. 6/1/3.35, 50mm ., prov. construction of foundation of transformer, erection of 25 kva s/stn. i.e. digging of pit for pole & earthing two no. poles & 3 nos. for earth drilling of holes in x-arms, preparation of plateform str. members c.i., a.l. i.e. x-arms & k.b. set, errection of d/p, concreating of rcc muff errection of plateform, errection of x-arms, d.o., l.a., mccb, switch lt box, energy meter, errection of transformer, earthing connection to g.o. switch, transformer l.a. etc., errection of stay set, jumper, pipe earthing 3 nos set, l.t. cable, barbed wire and painting complete in all respect., transportation charges @10490/-, prov. transportation charges & mannual carriage of 25 kva pole mounted distribution s/stn. (line length 0.500km), erection of 3- ph. lt line, prov. aaac (7/3.15 50mm ) { neutral conductor including 1% (sag, jumpering and wastage}, prov. steel tubular poles (8 m, working load > 200 kgf/m )., prov. muffs with concerete filling, prov. shackle insulator with d-iron, prov. lt stay set i/c egg insulator., prov. nuts and bolts of various sizes (galvanised / coated) [preferably 16 mm or more (with flat and spring washers)], prov. stay wire, prov. g.i wire no 8swg, erection of 8 mtr. st pole single structure i.e. digging of pit, fixing of insulator, x-arms, k.b. set, top clamp, barbed wire, danger plate, drilling of holes and filling of pit + ramming complete in all respect., sagging of conductor i.e. laying, stringing and sagging & binding with insulator (single wire per km)., sagging of g.i i.e. laying, stringing and sagging & binding with insulator (single wire per km)., erection of stay