Get complete information related to latest Ground Leveling Work Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Ground Leveling Work Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Ground Leveling Work Tenders.
Tender For corrigendum : supply of flood fighting materials with utilisation as an when required basis during the monsoon period 2025 for the jurisdiction of ranaghat irrigation section i under ranaghat irrigation sub-division ranaghat nadia. - supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg)., earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same onembankments, clannels, filling depressions in requisite profile, levelling as per direction of the engineer-in-charge within a lead of (d) beyond 3.00 km and upto 4.00 km (this rate inclussive royalty @ rs.29.00 per m3, compensation @ rs.25.00 per m3 & cess @ rs.5.30 per m3 with the basic rate). assembled=rs. (229.00+29.00+25.00+5.30)=rs. 288.30, labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,(tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per irection of engr-in-charge (cost is excluding the cost of any types of filling materials).nb:- volume of earth/ sand filled bags should not be less than 0.028cum/ bag., extra rate for item no above for each additional lead of 60 metre or partthereof beyond the initial lead of 30 metre., dumping in position earth / sand filled gunny / poly bags (capacity 50kg) within a lead of 30 metre inclusive of all lifts, cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by engineer-in-charge
Tender For corrigendum : supply of flood fighting materials with utilisation as an when required basis for coming monsoon 2025 under the jurisdiction of ranaghat irrigation section ii under ranaghat irrigation sub division. - supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg)., earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same onembankments, clannels, filling depressions in requisite profile, levelling as per direction of the engineer-in-charge within a lead of (d) beyond 3.00 km and upto 4.00 km (this rate inclussive royalty @ rs.29.00 per m3, compensation @ rs.25.00 per m3 & cess @ rs.5.30 per m3 with the basic rate). assembled=rs. (229.00+29.00+25.00+5.30)=rs. 288.30, labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,(tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per irection of engr-in-charge (cost is excluding the cost of any types of filling materials).nb:- volume of earth/ sand filled bags should not be less than 0.028cum/ bag., extra rate for item no above for each additional lead of 60 metre or partthereof beyond the initial lead of 30 metre., dumping in position earth / sand filled gunny / poly bags (capacity 50kg) within a lead of 30 metre inclusive of all lifts, cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by engineer-in-charge
Tender For corrigendum : procurement of flood fighting materials along with cutting cleaningofjungles along withclosesurveillance of the banks of river bhagirathi attarapur embankment durinng the monsoonperiod of theyear2025under thejurisdictionofranaghat irrigation sub div. - supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg)., earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same onembankments, clannels, filling depressions in requisite profile, levelling as per direction of the engineer-in-charge within a lead of (d) beyond 3.00 km and upto 4.00 km (this rate inclussive royalty @ rs.29.00 per m3, compensation @ rs.25.00 per m3 & cess @ rs.5.30 per m3 with the basic rate). assembled=rs. (229.00+29.00+25.00+5.30)=rs. 288.30, labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,(tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per irection of engr-in-charge (cost is excluding the cost of any types of filling materials).nb:- volume of earth/ sand filled bags should not be less than 0.028cum/ bag., extra rate for item no above for each additional lead of 60 metre or partthereof beyond the initial lead of 30 metre., dumping in position earth / sand filled gunny / poly bags (capacity 50kg) within a lead of 30 metre inclusive of all lifts, cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by engineer-in-charge
Tender For custom bid for services - 9040c25b02 disposal of excess earth and debris from dump yard of haldia refinery-1. contour survey of the entire dump yard by experienced and competent surveyor and submission of survey report to engineer-in-charge (hereafter mentioned as eic). 2. excavation work,(sor item no. 10) shall be operated for any depth or height or lift or stacked material area without any extra cost other than contract sor rate. 3. the job will be executed at dumping yard or any other locations inside refinery as per direction of eic / site engineer without any extra cost. 4. excavation and segregation of debris and earth of the entire yard up to ground level after acceptance of contour survey report. 5. surface dressing and levelling the top of ground according to top of road-a level. again, similar contour survey is to be done, disposal volume to be calculated and report to be submitted to eic. 6. shifting of metallic and other re-usable materials (if any) inside refinery premises as per instruction of eic. 7. disposal of earth & debris in municipal land under haldia municipality or any other location inside/ outside haldia refinery as per instruction of eic. disposed material are to be levelled and arranged by contractor as per requirement at no extra cost.contractor has to find disposal site within a lead of 10 km from debris yard.if lead is more than 10 km, extra payment for lead beyond 10 km will not be admissible. 8. land for disposal/dumping of rubbish/ debris /excess earth is to be arranged by the contractor and arrangement of noc, statutory fees/ duties/ cess etc ,royalty applicable for this job is to be borne by contractor. the same will not be reimbursed by iocl. however, contractor has to submit documentary evidence for submission of such statutory fees/ duties/ cess is engineer-in-charge. 9. any other job which is required for successful completion of overall work are to be executed by the contractor as per instruction of eic..