Tender For corrigendum : supply of repair and maintenance work of ground lighting facilities , providing engineers supervisor having minimum qualification diploma engineering electrical , digging the cable trench for finding the fault in cable , cleaning rubbing the old paint and painting , identification and numbering of airfield lighting fittings , supply and making of heat shrink joint , supply of ss nut bolt and washers , making of threads with helixcoil , providing suitable capacity jcb hydra machine , painting of glf panels highmast panels etc , supply of elevated type omni directional blue , supply of bi directional elevated type high intensity runway edge light , supply of unidirectional elevated type high intensity approach light , supply of unidirectional elevated type high intensity approach side row light , filling the existing kerf having 1 to 2 nos of secondary cables. , filling the existing kerf having 3 to 4 nos of secondary cables. , supply filling and compaction of cold bitumen , carry out photometry testing of airfield ground lighting fittings , dsr items rate above or below
Tender For supply of repair of portable nitrogen purging machine , repair of power output device , repair of power output device heavy , repair of bench grinding machine 8 inch heavy duty , repair of auto elect testing machine
Tender For bid to ras supply of supply of 4x8.5 ton ducable ceiling mount air conditioning plants equipment , supply and installation of 28.60 mm copper pipes of 15 mtr length each with suitable insulating material from indoor unit of 8.5 ton ac plant to outdoor unit. , supply and installation of 15.88mm copper pipes of 15 mtr length each with suitable insulating material from indoor unit of 8.5 ton ac plant to outdoor unit. , supply of 10 sq. mm 4 core copper cables and wiring of equipment upto switch board. , supply of 1.5 sq.mm 8 core copper control cables and wiring of equipment upto switch board. , supply of 4 sqmm 4 core copper cables and wiring of equipment upto switch board. , supply of pvc conduit pipe and other required misc. hardware as per requirement , misc essential work for hanging the machine and proper level with 10mm full threaded g.i. rod includes minor repair work with material of wall and ceiling surface. , providing and fixing of ms stand of proper size suitable for the outdoor unit. the stand should be made up of 50mmx50mmx5mm mild steel. , supply of misc. items required for completion of installation such as nut bolts, rubber gasket, 35mm dia drain pipe with insulation approx 30mtr etc. , providing factory fabricated ducting material in 20 gauge gi sheet, for plenum chamber. , providing factory fabricated ducting material in 22 gauge gi sheet for supply duct , providing factory fabricated ducting material in 24gauge gi sheet for some portion of supply duct and return duct including jointing the different pieces of duct with suitable hardware and rubber , providing and fabricating the 9mm nitrile insulation work inside the supply duct and plenum chamber. acoustic insulation for plenum chamber and machine mouth open cell with 9mm nitrile insulation , providing and fabricating the 9mm nitrile insulation work inside the supply duct and plenum chamber. acoustic insulation for ducting closed cell 9mm nitrile insulation , providing and fixing of 475mm x 475mm canvas of reputed make in between the plenum and machines. , providing and fixing dampers of size 475mm x 475mm , providing, fabrication and fixing of powder coated aluminium grill for supply air , providing, fabrication and fixing of powder coated aluminium grill for return air , installation, testing and commissioning of 4x8.5 ton ductable air conditioning plants. //bid details 2 / 27
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - institution; universal testing machine; service provider
Tender For corrigendum : supply of repair of vehical d d - ramp assembly removing the vehicles and taken to the machine shop stripping all parts cleaning the burning oil seats springs o rings change and ramp assembled and tested , exhaust brake full device and over hauling and testing , transfer case mounting bracket , transfer case mounting bolt male and female , rotating switch , hand brake assembly , the above mentioned old parts removing and servicing new parts fitting mechanical charges and full electrical system checking and service , 4x4 assembly removing and checking electrifying fault defective and mechanical defective rectified and 4x4 assembly system operated and testing , clutch booster , above parts removing and fitting electrical system full checking and burned damaged looms and lighting service and testing electrical and mechanical labour charges , brake shoe lining with rivet , brake cylinder wheel cylinder front and rear , brake m cylinder , clutch cylinder , sleeve cylinder , brake drum skimming , brake system full removing the vehicle brake drum skimming after fitting the drum, brake shoe lining fitting and above brake m cylinder , self starter assembly stripping checking armature field coil solenoid bendex brush brush holder damaged armature re-winding , self assembly removing the vehicle stripping checking all parts armature field coil solenoid burned armature re- winding field coil , clutch plate , pressure plate , release bearing , clutch master cylinder , bty cult of switch 24v , ignition switch , fly wheel skimming and service , cabin shock absorber , 4x4 assembly , the vehicle electrical system full checking and burned damaged looms change ignition switch battery cut off switch fitting and full light system service and testing charges , gear box assembly removing the vehicle old clutch plate pressure plate release bearing fly wheel removing and gear box service , exhaust brake system removing and electrical fault rectified and mechanical fault removing and brake system mounting the vehicle and brake tested , ramp assembly repair service with damaged and burned oil seal springs o rings change and ramp assembled and tested , van pump assembly not working repair service with new packing kit and pressure testing , door lock assembly , relay 12v and 24v , door mechanism , the above mentioned all parts removing and new parts fitting and vehicle testing mechanical charges , all electrical system repair service burned looms and relay change full lighting system head lights tail lights indicators cabinets lights checking and service labour charge , rotary switch , ramp assembly repairs and service with damage seal kit spring and o rings , the above mentioned parts removing and new parts fitting
Tender For corrigendum : providing of custom bid for services - custom bid for services - valce salvaging job; f work covers salvaging of defective sc valves and restoring them for reuse as per standard procedures and instructions of the officer-in-charge. the contractor shall carry out the following activities in a safe, systematic, and accountable manner: 1. salvaging operations salvaging of defective sc valves shall be carried out as per laid-down procedures using the valve test bench and/or any other equipment or method advised by the officer-incharge. the contractor shall collect defective sc valves from the store after obtaining necessary approvals. 2. cleaning & preparation clean all defective sc valves in the ultrasonic valve cleaning machine and/or other approved valve cleaning systems. ensure all valves are thoroughly cleaned to remove dirt, oil, or contaminants before testing. segregate cleaned valves properly for further inspection and testing. 3. segregation & testing segregate valves based on their source (e.g. hot repair, defective, pin leak, scrapable cylinders, etc.). perform low pressure and high pressure testing of the valves as per laid-down procedures and test parameters. identify valves that are fit for reuse and those that are defective/rejects. 4. salvaging & assembly replace the old o -ring washer of all good salvaged valves with new o -ring washers (to be provided by hpcl). fit safety caps and back covers on the salvaged valves to protect them from dust and contamination. ensure salvaged valves are clean, properly assembled, and ready for storage. 5. storage & documentation arrange salvaged valves type-wise in a countable and organized manner and deposit them in the stores. ensure proper handling to avoid damage or mixing of valve categories. maintain shift-wise records of: o number of valves received, o number of valves cleaned, tested and salvaged, o number of valves rejected. 6. manpower & productivity contractor shall provide minimum one manpower per shift. a minimum target of 400 sc valves shall be salvaged per manpower per shift. inventory of defective valves pending salvaging shall not exceed one day s generation. 7. materials & consumables hpcl shall provide o -ring washers, safety caps, back covers, and other reusable fittings. kerosene and other cleaning consumables shall be supplied by the vendor. contractor shall ensure availability of all tools and accessories required for smooth execution. 8. certification & payment the shift officer shall certify the salvaged quantity at the end of each shift. payment shall be made strictly on actual quantity salvaged and accepted by hpcl. any deviation or failure to meet daily targets may attract penalty as per tender terms. 9. safety & compliance all activities shall be carried out in compliance with hpcl safety norms and oisd guidelines. personnel shall wear required ppe (gloves, goggles, shoes, helmet) during operations. all salvaging and testing activities shall be conducted under the supervision of hpcl personnel.
Tender For one time repair with up-gradation of software & 2 years camc of enkay make shock absorber testing machine (m & p no. 3780221) and coil spring scragging & load deflection testing machine (m & p no. 3750322)