Tender For corrigendum : procurement of low temperature moisture separation system (shell and tube heatexchanger and csystem) for development of condensate removal system (dehydration system) and the associated facilities
Tender For corrigendum : supply of bi facial solar panel 550 watt , topcon solar panel 610 watt , cut section of gate valve,globe valve,ball valve,diapharm valve,needle valve,check valve,safety valve,butterfly valve,pnematic control valve 4 inch diameter , cut section of centrifugal pump,gear pump,multistage c f pump,reciprocating pump,screw pump , cut section of shell and tube heatexchanger acrylic material , cut section of reactor with accessories motor,agitatot,support leg,nozzle,manhole,baffels,thermo well,bottom valve , vrf or vrv unit with two indoor unit 2 point 5 tr each and 5 tr capacity out door unit complete with air cooled condenser,accessories and controls,harmetic shield type compresor,r410 a single phase , evacuating and charging station as above but fitted with weighing scale 0 point 25 hp,230v,50 hz with gauge manifold , gauge manifold with gauges different size of hoses for r134a,r22,r32 and r 410 , wash bag cover jacket for ac service indore 1 point 5 ton,2 point 5 ton capacity , safety belt, industrial type full body protection double rope double hook,100 kg human weight , embroidery machine , double needle lock stitch machine , hydraulic trainer kit , brake test arrangement with two spring balance 0 to 25 kg rating , automatic motor coil winding machine with step arbor , three phase variable auto transformer ac varic 3 phase , 0 to 440v, 25a, 50 hz , synchronous motor, with accessories , vfd ac drive ac motor drive with vvvf control 3 phase , single phase transformer, core type, air cooled,1 kva,240 or 415 v,50hz , stepper motor with digital controller , bipolar , 12v dc , input pulse 5v, step angle 1 point 8 , power supply 230 v ac , oprating condition 0 to 40 deg c , bldc motor fan with controller 40 watt , servo motor with contoller 300rpm,12v dc,6mm dia and 15mm legth shaft ,holding torque 30kg cm,no load current 0 point 8 amp,full load current 7 point 5 amp , electrical test bench integrated with 0 to270v ac variac 25a , synchronization trainer for laboratory , solid flow measurement set up //bid details2 / 26
Tender For tender for supply of procurement of heatexchanger tubes for cdu 1 and 2 and gohds units c c - tube smls cold drawn 25 x2.5mm thk sa179 , tube smls sa179 25x2.5x9000mm cold dr , tube smls cold drawn 19.05x2.11mm sa179 , tube smls cold drawn 19x2.11mm sa179 6m , tube smls sa179n 25mm od 2.77tk 6mtr , tube sml 25.4mm od 2.77tk 2mt sa179n , tube smls 25.4 mm od 2.77thk 3mt sa179
Tender For maintenance contract of turbine and auxiliaries in a thermal power plant of 2x500 mw dtps anpara b b - overhauling of tdbfp aop onejob consists of one pump , major inspection or overhauling of tdbfp eop onejob consists of one pump , cleaning inspection and rectification of tube leakages if any of lube oil coolers of mdbfp onejob consists of one cooler , cleaning inspection and rectification of tube leakages if any of working oil coolers of mdbfp one job consists of one cooler , inspection oroverhauling of cot or dot room transferoil pumps one job consists of one pump , overhauling of transfer oil pumps or gear oil pumpsand other similar pumps one job consists of one pump , replacement of coupling of transfer oil pumps or gear oil pumps or tdbfp jops and other similar pumps one job consists of one pump , axial and radial alignment of transfer oil pump or recirculation pump or tdbfp jop cot or dot room transfer oil l pump and other similar pumps one jobconsists of one pump , overhauling of vapour extractor of mot or control fluid tank or tdbfp oil tank and seal steam system one job consists one vapour extractor , cleaning of centrifuge bowl of tdbfp one job consists of one centrifuge bowl , overhauling of recirculation pump of vacuum pump , cleaning of tdbfp oil tank one job consists ofone oil tank , cleaning of main oil tank of turbine or cot or dot one job consists of one tank , alignment and adjustment of recirculation pump withmotor , cleaning of centrifuge bowl of main turbine and cot or dot one job consists of one centrifuge bowl , replacement of the burst atmospheric relief diaphragm of lp turbine , inspection or cleaning flushing and normalization of condenser hot well , inspection or cleaning flushing and normalization of deaerator , inspection or cleaning flushing and normalization of feed water storage tank , inspection or cleaning flushing and normalization of tg or sg ecw tank one job consists of one tank , replacement of turbine hp orlp bypass oil and minor revisioning of hp bypass oil system , centrifuging of lube oil through portable centrifuging machine , inspection or cleaning of sg plate heatexchanger , inspection or cleaning of tg plate heatexchanger , inspection cleaning and revisioning of acw pump suction strainer one job consists of 01 strainer , filling flushing and normalization of tg or sg ecw system one job per cooling system , cleaning and revisioning of tdbfp aop suctionfilter one job per filter , cleaning and revisioning of duplex lube oil filterof tdbfp one job per filter , cleaning and revisioning of eop filter of tdbfp , cleaning and revisioning of lube oil filter of mdbfp one job per filter , cleaning of duplex lube oil filter of main turbine one job per filter , cleaning of jop duplex filter of main turbine one job per filter , cleaning of bucket filter of main oil tank or control fluid tank one job per filter , cleaning of self cleaning filter of protection rack of main turbine 1 job consists of two filters , inspection or replacement of dry filter or mechanical filter super fine filter one job per set , inspection or replacement of fuller earth filter one job per set , cleaning of duplex filter mounted on valve rack of governing system of main turbine one job per filter , cleaning of cep suction strainer or bfp booster pump suction strainer one job per strainer , cleaning of bfp conical strainer one job per strainer , revisioning or replacement or cleaning of pilot valve of main turbine one job consists one pilot , revisioning or replacement or cleaning of pilot valve of m c v or aux c v of tdbfp one job consists one pilot , servicing of isolating valve control valve and nrvsof condensate line tdbfp extraction extraction 5 and booster pump suction line //bid details3 / 108size400 mm class150 to 300 , servicing of isolating valve control valve and nrvs installed on bfp discharge feed discharge line hph inlet or outlet hph 50 percentage bypass and other similar valve , servicing of hph 100 pe