Web Analytics Made Easy - StatCounter

Heat Exchanger Shell Tenders

Get complete information related to latest Heat Exchanger Shell Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Heat Exchanger Shell Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Heat Exchanger Shell Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :41233900 Due date: 18 Aug, 202518 Aug, 2025 NA
Tender For supply of requisition for mechanical lab equipment - inverter based pulse tig dc welder, inverter based pulse mig, spot welding machine, sheet bending machine, shaping machine, surface grinding machine, power hacksaw machine, gas welding/cutting machine, tool cutter grinder, determination of friction loss in pipe., deflection of beam apparatus, shear force & bending movement apparatus, simply supported beam apparatus, canti lever beam apparatus, governors-all types, static & dynamic balancing apparatus, epicyclic gear train & holding torque apparatus, gear drive, power transmission, models of gears, clutch, break-clutch, drives, kaplan turbine test rig, separating and throttling calorimeter, different types of boilers-working model of cochran, babcock & wilcox boiler, heat exchanger-shell & tube heat exchanger, fin tube heat exchanger, vapor compression refrigeration trainer test rig, vapor absorption refrigeration testrig, refrigerant leak detector, air conditioning test rig, green sand moulding setup, casting setup and patterns, milling machine with required set of work holding devices, cutting tools, accessories and tool holders

Central Government/Public Sector

CTN :41189779 Due date: 04 Aug, 202504 Aug, 2025 NA
Tender For heat exchanger shell & tube type as per technical specification

Central Government And Public Sector

CTN :40970042 Due date: 08 Aug, 202508 Aug, 2025 67.56 Lacs
Tender For corrigendum : non-destructive examination of various equipments and process piping at hwpk site during mta-2025 - ultrasonic flaw detection of weldments on towers, tanks, equipment, nozzles, large dia gas lines and process pipe lines as per standard practice using reputed make ut flaw detector probes by asnt/isnt ut level ii/iii qualified and experienced persons including surface preparation with pre/post cleaning of weldments, interpretation of data and submission of reports., ultrasonic flaw detection of weldments on towers, tanks, equipment, nozzles, large dia gas lines and process pipe lines as per standard practice using reputed make ut flaw detector probes by asnt/isnt ut level ii/iii qualified and experienced persons including surface preparation with pre/post cleaning of weldments, interpretation of data and submission of reports., thickness measurement/mapping with grid marking at identified locations of xu towers/tanks and piping using standard ut thickness gauges and probe by asnt/isnt ut level ii/iii qualified and experienced persons including surface preparation with pre/ post cleaning, interpretation of data and submission of reports., phased array ultrasonic testing/time of flight diffraction of weld joints of exchange unit towers / tanks /pipelines as per standard practice using standard equipment and probes by asnt/isnt ut level ii/iii qualified and experienced persons including surface preparation with pre/post cleaning of weldments, interpretation of data, preparation and submission of reports ., liquid penetrant testing of weldments of heat exchangers, stiffening rings, equipment skirt/saddle supports, equipment nozzles d of xu towers, tanks and weldments of pipe lines (including supply of consumables and dp kit) by asnt/ isnt lpt level ii/iii qualified and experienced persons including surface preparation with pre/post cleaning of weldments and submission of reports, liquid penetrant testing of weldments of heat exchangers, stiffening rings, equipment skirt/saddle supports, equipment nozzles d of xu towers, tanks and weldments of pipe lines (including supply of consumables and dp kit) by asnt/ isnt lpt level ii/iii qualified and experienced persons including surface preparation with pre/post cleaning of weldments and submission of reports, long range ultrasonic testing (lrut) of process liquid piping and large dia gas piping connected to tower and tank with in 1st isolation valve of size from 4 inch nb to 36 inch dia.
 Loading, Please wait...

Connect us via What's Up