Get complete information related to latest Heater Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Heater Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Heater Repair Tenders.
Tender For rate contract for supply of materials for repair of distribution transformers at divisional store of electric division jpdcl batote for year 2026-27 or till the next year tender is finalized - supply of materials for repair of distribution transformers at divisional store of electric division jpdcl batote (per unit rate), super enameled aluminium wire swg-21 (isi mark) in exchange of scrap, super enameled aluminium wire swg-19 (isi mark) in exchange of scrap, super enameled aluminium wire swg-18 (isi mark) in exchange of scrap, super enameled aluminium wire swg-16 (isi mark) in exchange of scrap, super enameled aluminium wire swg-14 (isi mark) in exchange of scrap, super enameled aluminium wire swg-13 (isi mark) in exchange of scrap, super enameled copper wire swg-13 (isi mark) in exchange of scrap, super enameled copper wire swg-12 (isi mark) in exchange of scrap, super enameled copper wire swg-11 (isi mark) in exchange of scrap, aluminium strip for lt winding of sizes, copper strip for lt winding for 400 kva/630kva transformers 8/4 - 10/4.5, lt bush rod brass-complete 12 mm, lt bush rod brass-complete 20 mm, lt bush rod brass-complete 25 mm, lt bush rod brass-complete 30 mm, ht bush rod 12 mm brass for 11/0.440 kv transformer (complete), l.t bush for 11/0.440 kv transformer, 12 mm, l.t bush for 11/0.440 kv transformer, 20 mm, l.t bush for 11/0.440 kv transformer, 25 mm, l.t bush for 11/0.440 kv transformer, 30 mm, ht bush 12 mm for 11/0.440 kv transformer, butter paper, cotton tape 1 roll, rubberized cork sheet 4 mm thick 3x3, rubberized cork sheet 5 mm thick 3x3, cork strip 4mm, lethoride sheet, packing sheet 1mm & 1 mm, glass empire/glass sleeves 0-4mm, glass empire/glass sleeves 8-10mm, bakelite tubes of sizes (as per sample), packing gutties 1 ,1 , nuts and bolts for transformer of sizes, insulating varnish dr. beck, old cotton sarees/ waste, wooden wedges size, ht washers, lt washers m-20, lt washers m-25, lt washers m-12, ht bush clamps ( bimetallic, heavy duty), fevicol, transformer oil, three phase, 2 hp motor, filter paper pack 36 inch/3 feet, 2 kw heater 2.5 feet long, stainless steel type(u shape) tubular finned oven heating element, thermostat rotational type, contactor ml-2, 3-phase motor 1.5 hp, filter packs 2 feet micro, thermostat 0-110, indicator (ryb) big, sproket set 92x25x25, sproket 25, single teeth, chain 10 feet (big), 1/2, chain 10 feet (big), 3/4, chain small 10 feet, 1/2, chain small 10 feet, 3/4, hose pipe, 1 inch, electronic weighing machine (capacity 10kg), electronic weighing machine (capacity 200kg), electric chain pulley 3 ton, electric chain pulley 5 ton with remote, contactor ml-4, steel washer for transformer-as per sample, ms clamping ring-as per sample, m-seal
Tender For corrigendum : supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bot
Tender For bid to ras bid to ras providing of repair and overhauling service - diesel generators- dg sets; l- 215 port da dynamo repair and l-216 instant water heaterrepair; no; buyer premises
Tender For repairing and renovation of the polyhouse of banana research centre goraul - shed cover with plastic , aluminate cover , aluminum profile , spring pvc coated , plastic clamp , self-drill screw , plastic wire , g i bending wire , rope , firki , adhesive tape , g i ring , cooling pad , exhaust fan restoration , temperature controller fan restoration , temperature heaterrepairing , plumbing fogger restorations work , electric panel controller restoration , electric restoration work , labour cost
Tender For corrigendum : fabrication work d d - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of sulfur f