Web Analytics Made Easy - StatCounter

Heater Repair Tenders

Get complete information related to latest Heater Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Heater Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Heater Repair Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :45340684 Due date: 24 Jun, 202624 Jun, 2026 NA
Tender For corrigendum : purchase of electrical materials and the rate of material and repair work servicing of ro geyser watercooler, stabilizer, ceiling fan, washing machine, inverter generator, sound system etc. - ups 3kva 5kva maintenance and servicing, 3 kva card repairing , 3 kva servicing , 5 kva maintenance and servicing , rod heater repairing, ghvj jkwm ,yhesuv , cctv camera maintenance and servicing, servicing/repairing charge , installation charge , hd camera cp plus colour audio 2.4mp , bnc & dc connector , poe 8 port mother board , cp plus camera ip 2mp colour night vision audio , pvc box , 2u rack , hdd 4tb , nvr cemos & formatting , cat 6 cable box , 3+1 cctv camera cable meter, ceiling fan maintenance/repairing, ceiling rose , ceilling fan repairing / servicing charge , capacitor 2.5 mfd sigma or equivalent make , ceiling fan winding (copper wire )with 6 month warrenty , down rod for ceiling fan , fan regulator havells/crompton greaves/ usha /bajaj double modular or equivalent make type , csfjax 6201 , csfjax 6202 , fan regulator havells/crompton greaves/ usha /bajaj or equivalent make switch type , fan wiring with repair , grees 100 , ceiling fan hole fass copper , capacitor 3.15 mfd sigma or equivalent make , washing machine semiautometic maintenance /repairing, washing machine drain blow , washing machine otg , washing machine repairing charge , washing machine spin motor , washing machine timer wash , washing machine wash motor , washing mchine gear box , washing machine automatic maitenance /repairing, motor , inlet pump , drain pump , pcb , pulsator , door sensor , pressure sensor , washing machine repairing charge , fridge maintenance/repairing, filter fridge , fridge compressor 175 liter , fridge compressor 220 liter , fridge gas with filling 175 liter , fridge gas with filling 220 liter , fridge over load , fridge relay , fridge thermostate , fridge repairing charge , caplary 9 feet , geyser maintenance and servicing, geyser heating aliment , geyser over heat (autocut) , geyser pressure realese valve , geyser repaing charge , panel indicator lamp red/yellow/green , exhaust maintenance /repairing, exhaust motor 18 inch , exhaust motor 18 inch winding charge with 6 month warrenty, exhaust blade 18 inch , exhaust motor 15 inch winding charge with 6 month warrenty , exhaust motor 15 inch , exhuast blade 15 inch , complete exhaust frame 18 inch , complete exhaust frame 15 inch , exhaust repairing charge , exhaust motor 9 inch , exhaust motor 9 inch winding charge with 6 month warrenty , exhaust blade 9 inch , exhaust motor 12 inch , exhaust motor 12 inch winding charge with 6 month warrenty , exhaust blade 12 inch , complete exhaust frame 12 inch , damsulj 4 mfd/6mfd, complete exhaust frame 9 inch , steplizer maintenance /repairing, starting capacitor 100 mfd , starting capacitor 150 mfd , stelizer rod1000 watt , steplizer disconnect charge , steplizer installation charge , steplizer pcb repairing charge , steplizer transformer winding 140 , sarvo steplizer 3 phase 50kva carbon , sarvo steplizer 3 phase 50kva oil yhvj, steplizer 1 phase 1.5 kva winding , steplizer 1 phase 2 kva winding , steplizer 1 phase 2 kva relay , steplizer 1 phase 1.5 kva relay , sarvo steplizer 3 phase 50kva winding , sarvo steplizer 3 phase 50kva conatctor (30-80) , cattle aliment rod (for stelizer) , steplizer service charge , , ( / ) , , smps / , , . , ( / ) , . . . , , - 100 . . . , 100/80 . . . , ( / / ) , ( / ) , , , , ( / ) , , , . . , ro pre filter candel , . . , 20/40 , 20/40 , 20/40 , 20/40 , 20/40 , 20/40 , 20/40 , 20/40 , water cooler compressor gas with filling charge , water cooler ro 20inch pp filter , water cooler ro carbon 20inch pp filter , , 3 . . / . . . , 40/80 , 40/80 , 40/80 , 40/80 , 40/80 , 40/80 , 40/80 , 40/80 , water cooler compressor gas with filling charge , water cooler ro 20inch pp filter , water cooler ro carbon 20inch pp filter , , 3 . . / . . . , 120/80 , 120/80 , 120/80 , 120/80 , 120/80 , 120/80 , 12

corporations/Associations/Others

CTN :45542781 Due date: 25 Jun, 202625 Jun, 2026 NA
Tender For auction sale of u/s bullring segment of coal mill,u/s c.s. scrap(coal nozzle),u/s m.s. scrap with ceramic lining,u/s air heater element (basket) scrap,u/s bearing scrap,u/s acsr aluminium conductor scrap,u/s breaker pole of sf6 breaker,u/s ct scrap 33kv,u/s oil circuit breaker 132kv scrap,u/s lighting arrestor scrap 220kv,u/s cvt scrap 220kv,u/s ct scrap 220 kv,u/s battery scrap,u/s pvc plastic, canvas, rubber, fiber etc

CTN :45475418 Due date: 15 Jun, 202615 Jun, 2026 NA
Tender For rate contract for supply of materials for repair of distribution transformers at divisional store of electric division jpdcl batote for year 2026-27 or till the next year tender is finalized - supply of materials for repair of distribution transformers at divisional store of electric division jpdcl batote (per unit rate), super enameled aluminium wire swg-21 (isi mark) in exchange of scrap, super enameled aluminium wire swg-19 (isi mark) in exchange of scrap, super enameled aluminium wire swg-18 (isi mark) in exchange of scrap, super enameled aluminium wire swg-16 (isi mark) in exchange of scrap, super enameled aluminium wire swg-14 (isi mark) in exchange of scrap, super enameled aluminium wire swg-13 (isi mark) in exchange of scrap, super enameled copper wire swg-13 (isi mark) in exchange of scrap, super enameled copper wire swg-12 (isi mark) in exchange of scrap, super enameled copper wire swg-11 (isi mark) in exchange of scrap, aluminium strip for lt winding of sizes, copper strip for lt winding for 400 kva/630kva transformers 8/4 - 10/4.5, lt bush rod brass-complete 12 mm, lt bush rod brass-complete 20 mm, lt bush rod brass-complete 25 mm, lt bush rod brass-complete 30 mm, ht bush rod 12 mm brass for 11/0.440 kv transformer (complete), l.t bush for 11/0.440 kv transformer, 12 mm, l.t bush for 11/0.440 kv transformer, 20 mm, l.t bush for 11/0.440 kv transformer, 25 mm, l.t bush for 11/0.440 kv transformer, 30 mm, ht bush 12 mm for 11/0.440 kv transformer, butter paper, cotton tape 1 roll, rubberized cork sheet 4 mm thick 3x3, rubberized cork sheet 5 mm thick 3x3, cork strip 4mm, lethoride sheet, packing sheet 1mm & 1 mm, glass empire/glass sleeves 0-4mm, glass empire/glass sleeves 8-10mm, bakelite tubes of sizes (as per sample), packing gutties 1 ,1 , nuts and bolts for transformer of sizes, insulating varnish dr. beck, old cotton sarees/ waste, wooden wedges size, ht washers, lt washers m-20, lt washers m-25, lt washers m-12, ht bush clamps ( bimetallic, heavy duty), fevicol, transformer oil, three phase, 2 hp motor, filter paper pack 36 inch/3 feet, 2 kw heater 2.5 feet long, stainless steel type(u shape) tubular finned oven heating element, thermostat rotational type, contactor ml-2, 3-phase motor 1.5 hp, filter packs 2 feet micro, thermostat 0-110, indicator (ryb) big, sproket set 92x25x25, sproket 25, single teeth, chain 10 feet (big), 1/2, chain 10 feet (big), 3/4, chain small 10 feet, 1/2, chain small 10 feet, 3/4, hose pipe, 1 inch, electronic weighing machine (capacity 10kg), electronic weighing machine (capacity 200kg), electric chain pulley 3 ton, electric chain pulley 5 ton with remote, contactor ml-4, steel washer for transformer-as per sample, ms clamping ring-as per sample, m-seal

CTN :45057581 Due date: 04 Jun, 202604 Jun, 2026 9.50 Lacs
Tender For corrigendum : supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bot

Central Government/Public Sector

CTN :45180069 Due date: 27 May, 202627 May, 2026 NA
Tender For bid to ras bid to ras providing of repair and overhauling service - diesel generators- dg sets; l- 215 port da dynamo repair and l-216 instant water heater repair; no; buyer premises

CTN :45252608 Due date: 29 May, 202629 May, 2026 NA
Tender For supply of tea chalani big , tea chalani , hot case cellow , induction chullah , whimsi ceramic coffee mug 500 ml , gradient brew ceramic cofffee mug , laptop bag , reparing of heaters warmax and oil heaters , chs heater repair , silver paint , floor mat 10x12 , bathroom freshner , phillips table lamp colour changing , philips table lamp , distilled water

Central Government/Public Sector

CTN :45235162 Due date: 26 May, 202626 May, 2026 NA
Tender For auction sale of depot ferrous scrap - scrap condemn ferrous mixed melting consisting of and released from, switch blcp, zpt, bldj, blho, ztel, zban, zfwa, zlfr, zlda, zlc, zli, zprd, blpr, hog coupler, fl dom, marker light, dial gauge,diffrent type of measuring tools, electrical and machanical tools, bench type, accesories of dga, analytical balance, yoke, amonia printing machine, table, pinion, lifting tackle assly, magger, steel channel, lipid racer, plain racer, axle box crown and rear cover, lock plate, abutment ring, housing for traction bar, battery stand, set of lybrinth, end frame, holder plate, bello plate, nut, washer, speed prove housing cover, gear, set of hardware, racer, set of safety sealing, bench vice, set of bolt, longi set, brake shoe key, fly catcher fittings, lt distribution panel board, starter, mdb box, tube light assly, lt panel, diffrent typr of stand, box, top, etc, solar geasure sheet, exhaust frame, sign board frame, dg filter silencer, a9, sa9, c2 relay valve, c2w valve, air drayer valve, nut bolt, pbu/tbu unit, pentopen strip, main spring, longitude tube, upper articulation assly, push rode, study link, study tube, arm assly, pento base frame, servomotor, hardware and compresure crankshaft, free end cover, ply and cover cylinder, intercooler, head, base frame, coupling filter, disk valve, ms pipe, crake end shield, bearing, release ferrous items during overhauling, loco filter jali, drums, iron sheet, rdpt kits, small box racks and structure, packing cage cab fan coverage jali, dust cover, oil filtration plant release item, oil machine release item, heater coil heater element, test bench, pit wheel lathe machine release items, fuse oil seal, filter contactors switch, lamp pipe, roller filter, disc, gaskets, main drive roller shaft, light junk box cover, loco coridor cover, water protection cover, ms angle, wire rope, slings bracket fan and air circulation fan jali and blades, spm, iron spring, ms washer, screw, liner, car body filters, ms thin sheets, ms spring, cutter pin channel, shutter, hose pipe wires, ms angle, structures, blower fan jali, filters, window shutter, flasher light, dome cooler body without motor & pump, diffrent type of resistance, grid panto strip, diffrent type of ferrous release from charger, regulator, cvt, repeater frame, steel rack, ups, transformer, sensor gear, bearing cover, locking plate, special rig, distance piece bearing, middle wheel lock plate, thrower, lock plate, loose rip, racer distance piece, spring seat liner, push pull rod, spheriblock, damper, cattle guard, cbc coupler body, yoke, buffer, screw coupling, draft gear, nuckle, clevis, yoke pin, nuckle pin, clevis pin, hand brake, bello plate, brake shoe key, cbc spare parts, operating handle, ferrous released from master controller, c145 contactor, em-contactor, c118 contactor, program switch, etc.

CTN :45139389 Due date: 29 May, 202629 May, 2026 23.16 Lacs
Tender For repairing and renovation of the polyhouse of banana research centre goraul - shed cover with plastic , aluminate cover , aluminum profile , spring pvc coated , plastic clamp , self-drill screw , plastic wire , g i bending wire , rope , firki , adhesive tape , g i ring , cooling pad , exhaust fan restoration , temperature controller fan restoration , temperature heater repairing , plumbing fogger restorations work , electric panel controller restoration , electric restoration work , labour cost

Central Government/Public Sector

CTN :45008556 Due date: 04 May, 202604 May, 2026 NA
Tender For auction sale of others - scrap fe & n/fe (1)compresor off size, 110no, fe-935kg, cu-66kg(2)nrv 6"/4", 2no, fe-6kg (3)timer, 24no, fe-0.48kg (4)capacitor 2.5 mfd to 120 mfd, 668no, pvc-13.36kg (5)current transformer,9no, fe-36kg, cu-9kg (6)condensor coil, 15no, fe-3.75kg, cu-3.75kg, al-1.50kg (7)expansion valve, 14no, cu-1.40kg (8)fan blade, 79no, fe-31.60kg, al-3.95kg (9)db box/dp switch, 17no, fe-1.70kg (10)mccb/icptn/off size, 59no, fe-11.80kg, cu-.295kg (11)power pack, 1no, fe-.10kg (12)5 in 1 socket 5 amp, 38no, cu-0.19kg (13)sealed dome compresor, 84no, fe-252kg, cu-33.60kg (14)fan motor of indoor unit, 49no, fe-12.25kg, al-4.90kg (15)condensor fan motor, 139no, fe-69.50kg, cu-27.80kg (16)geyser element, 9no, cu-0.45kg (17)over load relay, 67no, fe-0.67kg, cu-0.335kg (18)volt meter, 16no, fe-0.08kg, cu- .032kg, al- .08kg (19)water cooled condensor, 3no, fe-9kg, cu- .30kg, al- .30kg (20)front grill, 3no, pvc- .60kg (21)fitting off size, 1941no, fe-970.50kg (22)wall fan off size, 123no, fe-270.60kg, cu-18.45kg (23)glow sign board, 30no, fe-90kg (24)tik w board off size, 63no, wood-15.75kg (25)acb off size, 9no, fe-193.50kg, cu-9kg (26)ms angle/gi structure, 1no, fe-468kg (27)v bracket, 20no, fe-80kg (28)insulator scrap broken, 1363no, nil (29)energy meter, 1724no, fe-43.10kg, cu-17.24kg (30)scrap wood ,1no, wood- 587kg (31)pvc alumn. wire, 80.7 m, al-40.350kg, (32)pedestal fan ,99no, fe-99kg, cu-9.90kg, al-4.95kg (33) geyser off size, 56no, fe-448kg, cu-5.6kg, al-11.2kg (34)stabilizer, 10no, fe-120kg, cu-25kg (35) insect killer, 21no, fe-73.50kg, cu-1.05kg (36)cls panel 63 amp.,17no, fe-595kg, cu-49.81kg (37) main switch /mcb/mccb, 688no, fe-66.80kg , cu-13.36kg (38)heater (plastic),1no, fe-0.20kg (39) exhaust fan off size, 294no, fe-588kg, cu-44.10kg, al-14.7kg (40)lv/hv side bushing, 5no, cu-0.50kg (41)tap changer switch ,4no, fe-0.40kg, cu-0.1kg (42) power capaciter ,2no, fe-1kg (43)street light controller ,5no, fe-10kg (44) led lamp scrap,629no, al-3.145kg (45)released horizontal siren ,2no, fe-74kg, cu-6kg (46) air circulator fan ,41no, fe-205kg, cu-6kg (47) scrap tyer , 18no (48) led tube released , 2187no, al-2.187kg (49) ups, 2nos, fe-6kg, cu-0.2kg, al-0.02kg (50) ocb ,2no, fe-150kg, cu-15kg, al-2.5kg (51) thermostate ,48no, fe-4.80kg (52) capacitor off size , 193no, cu-0.965kg (53) blower drum ,40no, fe-8kg (54) pvc cut size copper wire, 470m., cu-0.5kg (55) pvc insulated copper wire , 145kg, cu-95kg (56) combination piler ,3no, fe-0.75kg (57) clamp meter ,1no, cu-0.005kg (58) fan regulator , 6no, cu- .012kg (59) cappilery (copper tube) ,6no, cu-0.06kg , (60) empty drum ,27no, fe-486kg (61) 1 core alumn. cable, 840m, al-40kg (62)lighting arrester,1no, fe-1kg (63) vaccume interueptor, 3no, fe-0.30kg (64)outdoor type isolater ,1no, fe-40kg (65) compressor off size ,69no, fe-172.5kg, cu--17.25kg (66) pcb kit , 10no (67)single phase preventor ,63no, fe-3.15kg, cu-1.26kg (68) (a)outdoor fitting off size,1670 no, fe-501kg, al-1002kg, (b)fitting outdoor,280 no, fe-700kg, cu-14kg, al-42kg (69)switch socket ,21no, cu-0.105kg (70)controller switch, 1no, fe-0.05kg (71) electronic chok, 23no, fe-1.15kg, al-0.115kg (1-71) lot no-5 (1-71)location-sse/ph/store/ddu

CTN :44757118 Due date: 27 Apr, 202627 Apr, 2026 9.00 Lacs
Tender For corrigendum : fabrication work d d - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of sulfur f
 Loading, Please wait...

Connect us via What's Up