Web Analytics Made Easy - StatCounter

High Pressure Valve Tenders

Get complete information related to latest High Pressure Valve Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic High Pressure Valve Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding High Pressure Valve Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :44905487 Due date: 04 May, 202604 May, 2026 34.93 Lacs
Tender For procurement of high pressure valves for bm-1 of rtps

State Government

CTN :44882880 Due date: 17 Apr, 202617 Apr, 2026 NA
Tender For work of replacement of high-pressure valves in u-5, 6 & 7.

State Government

CTN :44356561 Due date: 24 Apr, 202624 Apr, 2026 NA
Tender For corrigendum : providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - thermal power plant; work of overhauling servicing of various high pressure valves in boiler unit 3 4 and 5 at gandhinagar tps during aoh coh and on as and when require..

State Government

CTN :44809825 Due date: 29 Apr, 202629 Apr, 2026 3.31 Lacs
Tender For work contract for revisioning/repair of high pressure valves, overhauling of pumps, alignment of auxiliaries, tube cleaning of cooler/cleaning of heat exchangers, replacement of hp pipes/bends of u#2, dspm tps, ke during short shut down.

State Government

CTN :44782372 Due date: 13 Apr, 202613 Apr, 2026 NA
Tender For corrigendum : work of replacement of high-pressure valves in u-5, 6 & 7.

Central Government/Public Sector

CTN :44698679 Due date: 09 Apr, 202609 Apr, 2026 1.39 Crore
Tender For providing of custom bid for services - various repair jobs of emd - overhauling/dismantling of the existing w ater drainer by isolating the drainer by putting blank plate after isolation valve. purging/removal of trapped gas from the seal pot/pipe line by injecting st eam/nit rogen. revisioning of all parts & cleaning of pot. if required, the complete seal pot w ith pipe line has to be new ly fabricated & erected as per the instruction of o.a. or as per draw ing. after erection, testing of pot by injecting st eam/nit rogen and de-isolation/commissioning. the condensate pipe from w ater drainers has to be laid to the nearest storm w ater manhole or as directed by o.a.s representative. painting of w ater drainer and pipes to be done after the erection job , "technical cleaning of gas pipeline water drainers. the w ork involves closing/blanking of valves, st eam purging of pipe/drain pot and opening of f langes of seal pot and removal of muck/deposit from pots, revisioning of gas inspection valve,w ater filling valves,condensate valves. fixing of new packing and tightening of f langes. filling of w ater in the seal pot and de-blanking of w ater drainer/opening of valves. checking for any leakages and rectification of the same " , the job involves cutting/dismantling of corroded structures like column, platforms, w alkw ays, staircases etc. at height. before cutting of any structure, the nearby pipe lines or any other equipment to be supported f irst. the dismantled structures should not be throw n from height. all the dismantled structure to be kept at one place as directed by o.a.s representative for disposal by bsp , the job involves fabrication of st eel structures like column, platforms, w alkw ays, staircases etc. by type 1 electrode, as per approved draw ing / specification or as directed by oa/oa¿s representative complete in all respect including painting. fabricated structures w ill have to be erected by the contractor at height as per the direction of operating authority , the job involves w elding of tack w elded pipes, gland compensators, disc compensators, flanges, st eel structures, gas pipeline equipment, plates, pipes, structures w ith type 1 w elding electrodes , dismantling of gas pipe line or any other pipe line by cutting, including handling and stacking, cutting into pieces and sections as directed by oa/oa¿s representative & stacking at designated location. before cutting the nearby pipe lines/platforms/equipment to be supported. all dismantled structural items to be kept at a particular place, as show n by o.a.s representative for disposal by bsp , job involves erection of fabricated/available pipes at locations show n by o.a./o. a' s representative, including dia. 100mm at heights. erection job involves, lifting of standard length of pipes supplied by bsp free of cost, w elding w ith the existing pipes/valve f langes and testing of pipe w ith st eam/nit rogen and defect rectification w ith type i electrode. any accessories like bleeder pipe, drainer pipe, purging nipples, valves,compensators, saddle supports etc. also to be erected, as directed by o.a , fabricated/available pipes at locations show n by o.a./o.a. s representative, above dia. 100mm and up to dia. 200mm at heights. erection job involves, lifting of standard length of pipes supplied by bsp free of cost, w elding w ith the existing pipes/valve f langes and testing of pipe w ith st eam/nit rogen and defect rectification w ith type i electrode. , fabricated/available pipes at locations show n by o.a./o.a. s representative, above dia. 200mm and up to dia. 500mm at heights. erection job involves, lifting of standard length of pipes supplied by bsp free of cost, w elding w ith the existing pipes/valve f langes and testing of pipe w ith st eam/nit rogen and defect rectification w ith type i electrode. any accessories like bleeder pipe, drainer pipe, purging nipples, valves, compensators, saddle supports etc.also to be erected, as directed

Central Government/Public Sector

CTN :44715987 Due date: 09 Apr, 202609 Apr, 2026 NA
Tender For various repair jobs of emd - overhauling/dismantling of the existing w ater drainer by isolating the drainer by putting blank plate after isolation valve. purging/removal of trapped gas from the seal pot/pipe line by injecting st eam/nit rogen. revisioning of all parts & cleaning of pot. if required, the complete seal pot w ith pipe line has to be new ly fabricated & erected as per the instruction of o.a. or as per draw ing. after erection, testing of pot by injecting st eam/nit rogen and de-isolation/commissioning. the condensate pipe from w ater drainers has to be laid to the nearest storm w ater manhole or as directed by o.a.s representative. painting of w ater drainer and pipes to be done after the erection job , "technical cleaning of gas pipeline water drainers. the w ork involves closing/blanking of valves, st eam purging of pipe/drain pot and opening of f langes of seal pot and removal of muck/deposit from pots, revisioning of gas inspection valve,w ater filling valves,condensate valves. fixing of new packing and tightening of f langes. filling of w ater in the seal pot and de-blanking of w ater drainer/opening of valves. checking for any leakages and rectification of the same " , the job involves cutting/dismantling of corroded structures like column, platforms, w alkw ays, staircases etc. at height. before cutting of any structure, the nearby pipe lines or any other equipment to be supported f irst. the dismantled structures should not be throw n from height. all the dismantled structure to be kept at one place as directed by o.a.s representative for disposal by bsp , the job involves fabrication of st eel structures like column, platforms, w alkw ays, staircases etc. by type 1 electrode, as per approved draw ing / specification or as directed by oa/oa¿s representative complete in all respect including painting. fabricated structures w ill have to be erected by the contractor at height as per the direction of operating authority , the job involves w elding of tack w elded pipes, gland compensators, disc compensators, flanges, st eel structures, gas pipeline equipment, plates, pipes, structures w ith type 1 w elding electrodes , dismantling of gas pipe line or any other pipe line by cutting, including handling and stacking, cutting into pieces and sections as directed by oa/oa¿s representative & stacking at designated location. before cutting the nearby pipe lines/platforms/equipment to be supported. all dismantled structural items to be kept at a particular place, as show n by o.a.s representative for disposal by bsp , job involves erection of fabricated/available pipes at locations show n by o.a./o. a' s representative, including dia. 100mm at heights. erection job involves, lifting of standard length of pipes supplied by bsp free of cost, w elding w ith the existing pipes/valve f langes and testing of pipe w ith st eam/nit rogen and defect rectification w ith type i electrode. any accessories like bleeder pipe, drainer pipe, purging nipples, valves,compensators, saddle supports etc. also to be erected, as directed by o.a , fabricated/available pipes at locations show n by o.a./o.a. s representative, above dia. 100mm and up to dia. 200mm at heights. erection job involves, lifting of standard length of pipes supplied by bsp free of cost, w elding w ith the existing pipes/valve f langes and testing of pipe w ith st eam/nit rogen and defect rectification w ith type i electrode. , fabricated/available pipes at locations show n by o.a./o.a. s representative, above dia. 200mm and up to dia. 500mm at heights. erection job involves, lifting of standard length of pipes supplied by bsp free of cost, w elding w ith the existing pipes/valve f langes and testing of pipe w ith st eam/nit rogen and defect rectification w ith type i electrode. any accessories like bleeder pipe, drainer pipe, purging nipples, valves, compensators, saddle supports etc.also to be erected, as directed by o.a. , overhauling of valves up to d

Central Government/Public Sector

CTN :44721038 Due date: 15 Apr, 202615 Apr, 2026 NA
Tender For tender for supply of procurement of gland packings for high pressure valves for ntpc sipat d d -as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as material description , as m

CTN :44711938 Due date: 21 Apr, 202621 Apr, 2026 NA
Tender For supply of schrader make high pressure valves

CTN :44514318 Due date: 03 Apr, 202603 Apr, 2026 NA
Tender For corrigendum : supply of hull valves for mpv yard 3050 to 3057 : : - dn350_bfly hull vlv_gb optd_flg - dn350 butterfly hull valve , dn200_bfly hull vlv_manual gb optd_flg - dn200 butterfly hull valve , dn150_bfly hull vlv_manual gb optd_flg - dn150 butterfly hull valve , dn80xdn125_storm hull valve_flg - dn80 - inlet - xdn125 - outlet - storm hull valve , dn150xdn200_storm hull valve_flg - dn150 - inlet - xdn200 - outlet - storm hull valve
 Loading, Please wait...

Connect us via What's Up